EUB-01-2017
Cloud Computing -
Related topics
Drag to rearrange · hover a topic or connection to preview why it's linked, click to pin that panel open
Connected via , not directly to the current topic
No motivation recorded.
Center graph on this topic →Topics in this graph
-
EUB-1-2015 — Cloud Computing, including security aspects
It is the same topic.
Bold node = current topic · node color = call status · hover for details, click to pin · smaller, lighter topics are two steps away
Call text (as on F&T portal)
View on F&T portalCloud computing is now an established global paradigm for the delivery of IT services in all sectors of the digital economy. However, further enhancements are still required in critical aspects of cloud computing, including enhanced security and privacy; trustworthy clouds; resource pooling; data management and traceability; virtualization; and hybrid systems. Support towards intercontinental experimentation on cloud infrastructures and services are necessary as well, especially in the context of EU-Brazil cooperation.
Scope
Research and Innovation Actions
The focus of the joint research will be the development of innovative technologies for next generation cloud infrastructures and services able to cope with the challenges from different application domains in business and societal contexts. The technologies to be developed should aim at future standardization as well as take into account interoperability and data portability.
The Commission considers that proposals requesting a contribution from the EU between EUR 1.0 and 1.5 million would allow this specific challenge to be addressed appropriately by two distinct projects. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.
Expected Impact:The joint EU-Brazil research is intended to develop innovative cloud computing technologies leading to next generation solutions. The research collaboration will also facilitate and enhance policy coordination between the EU and Brazil in relevant areas. In particular, projects are expected to:
- Facilitate the development of cloud-enabled, secure and trustworthy applications based on robust standardized technologies.
- Develop technologies to manage hybrid resources in the cloud, as well as solutions for cloud-centered data management.
- Submit joint contributions towards international standardization activities.
News flashes
An overview of the evaluation results (called 'Flash Call Info') of the topics EUB-01-2017, EUB-02-2017 and EUB-03-2017 of H2020-EUB-2017 call is now availablehere or under the 'Topic conditions & documents' section on the correspondant topic pages.
The submission of proposals to the 3 topics of this H2020-EUB-2017 call closed on 14 March 2017. A total of 51 proposals were submitted in response to these topics. The number of received proposals per topics is as following:- Topic EUB-01-2017 RIA: 13 proposals;- Topic EUB-02-2017 RIA : 34 proposals;- Topic EUB-03-2017 RIA : 4 proposals.
Participants in the EU collaborative projects are required to conclude a coordination agreement with the participants in the coordinated project funded by the RNP (Rede Nacional de Ensino e Pesquisa - Brazilian National Research and Education Network). A draft of this agreement has to be provided with the proposal.
That draft coordination agreement can be included as section 4.3 within thePart B section 4-5 file.
The RNP (Rede Nacional de Ensino e Pesquisa, Brazilian National Research and Education Network) call was published on 13 February 2017 at: https://www.rnp.br/pesquisa-e-desenvolvimento/editais.
The page to submit proposal is https://jems.sbc.org.br/ctic_eubr_4. The deadline to submit proposals is 14 March 2017.
A press release was published at https://www.rnp.br/noticias/rnp-e-sepin-lancam-edital-4a-chamada-entre-brasil-e-uniao-europeia.
Please remember that proposals submitted to this call which do not include coordination with a Brazilian proposal submitted to RNP will be considered ineligible for evaluation.
As of 1st January 2017, Switzerland is associated to the entire H2020 programme. In consequence, it is now also associated to this topic. In a nutshell this means that Swiss partners in a proposal are now on an equal footing with partners from EU Member States or other Associated Countries. For the details, please read this note.
Opening date: 2016-11-08 (9 years ago)
Closing date: 2017-03-14 (9 years ago)
Procedure: single-stage
Budget: 2,500,000
Expected grants: not specified
This call topic has been appended 6 times by the EC with news.
-
2017-07-13
an overview of the evaluation results (c... -
2017-03-15
the submission of proposals to the 3 top... -
2017-03-13
participants in the eu collaborative pro... -
2017-02-22
the rnp (rede nacional de ensino e pesqu... -
2017-01-12
as of 1st january 2017, switzerland is a... -
2016-11-08
the submission session is now available...
H2020-EUB-2017
Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.
There are 2 other topics in this call:
Showing the latest information. Found 1 version of this call topic in the F&T portal.
Information from
- 2024-03-30_14-21-39
Annotations
Events
Hand-picked events relevant to this call topic.
No events yet
There are currently no events linked to this call topic.
Timeline
Call published · 30 Sep 2024 (2 years ago)
All expected milestones for this call have passed.
Work programme published
14 Aug 2015 · est.
Call opens
08 Nov 2016
Call closes
14 Mar 2017
Outcome expected
14 Aug 2017 · est.
Grant agreement signed
14 Nov 2017 · est.
Call published
30 Sep 2024
-
Work programme published Estimated
14 Aug 2015 · 11 years ago
Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.
-
Call opens
08 Nov 2016 · 9 years ago
Submissions can be made from this date.
-
Call closes
14 Mar 2017 · 9 years ago
Deadline to submit a proposal.
-
Outcome expected Estimated
14 Aug 2017 · 9 years ago
The maximum time to inform applicants of the evaluation outcome is five months after the call closes.
-
Grant agreement signed Estimated
14 Nov 2017 · 8 years ago
The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.
-
Call published
30 Sep 2024 · 2 years ago
This topic was first published in TopicTree.
Funded Projects
Loading...
Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)
Ecosystem bubbles
This call topic is part of the following thematic bubbles.