FoF-14-2015
Integrated design and management of production machinery and processes -
Call text (as on F&T portal)
View on F&T portalScope
Specific challenge:Production quality significantly depends on the ambient conditions and the process parameters. Computational models capable of simulating the machine-to-part process not only can be used to predict manufacturing quality and productivity but, increasingly, to also compensate wear or partial damage through model-based control. Innovative machines and processes increasingly depend on model-based approaches, including the monitoring and control elements, throughout the whole machine lifecycle.
New integrated approaches are needed in simulation methods, tools and across hierarchical model layers requiring a cross-disciplinary collaboration between (predominantly SME) machine designers, industrial component suppliers, engineering software developers as well as making use of the process experience of manufacturers.
Scope: RTD and innovation activities should aim at developing and testing suitable model-based approaches for production machinery and at demonstrating the power of model-driven approaches for machine innovation through:
- The development of integrated and accurate simulation models and algorithms for model-based control of production machinery based on cross-disciplinary input and actual machine lifecycle parameters.
- Tool programming strategies that are easy to use and can be rapidly modified or re-adapted by workers on the machine.
- Demonstration of the reliability of model-based machines with respect to production accuracy/quality, maintainability and lifecycle return-on-investment (e.g. through an industrially scalable demonstrator).
Activities expected to focus on Technology Readiness Levels 4-6.
The Commission considers that proposals requesting a contribution from the EU between EUR 3 and 6 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.
Expected impact:
Improved system adaptability and reduction of lifecycle costs by 30% for manufacturing system and process.
New maintainability concepts based on predictive "(self-) maintenance" with machine reliability improved by 10% (MTBF) and reduced maintenance costs by 20%.
In terms of environmental impact: Reduced waste and energy efficiency improved by 30%.
Type of action: Research & Innovation Actions
Cross-cutting Priorities:News flashes
The Flash Call Info for topics FoF 8 and FoF 9 can now be found under the tab 'Call documents', just as the Flash Call Info for the other topics (FoF 10 - FoF 14).
Call Flash info can be found under Call Documents tab
In addition, a total of 131 proposals were submitted under the following topics:
FoF-08-2015: 114FoF-09-2015: 17
A total of 215 proposals were submitted in response to this call.The number of proposals for each topics is shown below:
FoF-10-2015: 56FoF-11-2015: 35FoF-12-2015: 51FoF-13-2015: 35FoF-14-2015: 38
Call Flash info can be found under call documents
After the update to the Horizon 2020 Work Programme of 22 July 2014,the following updates were made to the topics of this call:
- Call budget
- Call deadline is set to 04/02/2015
- Scope under 'Topic Descriptions' tab
- Eligibility conditions under 'Topic Conditions and Documents' tab
After the update to the Horizon 2020 Work Programme of 22 July 2014, the following updates were made to the topics of this call:
- Scope under 'Topic Descriptions' tab
- Eligibility conditions under 'Topic Conditions and Documents' tab
- Call budget
A total of 243 proposals were submitted in response to this call.The number of proposals for each topics is shown below:FoF 01-2014: 56FoF 02-2014: 74FoF 03-2014: 33FoF 04-2014: 21FoF 05-2014: 28FoF 06-2014: 22FoF 07-2014: 9
Clarification for NMP+B project proposers and evaluators on “Business Plan” and “Synergies with ESIF” - See "Call Documents"
Opening date: 2014-10-22 (11 years ago)
Closing date: 2015-02-04 (11 years ago)
Procedure: single-stage
Budget: 75,170,000
Expected grants: not specified
This call topic has been appended 11 times by the EC with news.
-
2015-05-11
the flash call info for topics fof 8 and... -
2015-04-29
call flash info can be found under call... -
2015-03-05
in addition, a total of 131 proposals we... -
2015-02-12
a total of 215 proposals were submitted... -
2014-10-22
the submission session is now available... -
2014-08-20
call flash info can be found under call... -
2014-07-23
after the update to the horizon 2020 wor... -
2014-07-23
after the update to the horizon 2020 wor... -
2014-05-27
a total of 243 proposals were submitted... -
2014-03-10
clarification for nmp+b project proposer... -
2013-12-23
the submission session is now available...
H2020-FoF-2014-2015
Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.
There are 13 other topics in this call:
Showing the latest information. Found 1 version of this call topic in the F&T portal.
Information from
- 2024-03-30_14-24-58
Annotations
Events
Hand-picked events relevant to this call topic.
No events yet
There are currently no events linked to this call topic.
Timeline
Call published · 30 Sep 2024 (2 years ago)
All expected milestones for this call have passed.
Work programme published
11 Oct 2013 · est.
Call opens
22 Oct 2014
Call closes
04 Feb 2015
Outcome expected
04 Jul 2015 · est.
Grant agreement signed
04 Oct 2015 · est.
Call published
30 Sep 2024
-
Work programme published Estimated
11 Oct 2013 · 12 years ago
Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.
-
Call opens
22 Oct 2014 · 11 years ago
Submissions can be made from this date.
-
Call closes
04 Feb 2015 · 11 years ago
Deadline to submit a proposal.
-
Outcome expected Estimated
04 Jul 2015 · 11 years ago
The maximum time to inform applicants of the evaluation outcome is five months after the call closes.
-
Grant agreement signed Estimated
04 Oct 2015 · 11 years ago
The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.
-
Call published
30 Sep 2024 · 2 years ago
This topic was first published in TopicTree.
Funded Projects
Loading...
Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)
Ecosystem bubbles
This call topic is part of the following thematic bubbles.
Not part of a bubble yet
This call topic has not been grouped into an ecosystem bubble.