HORIZON-CL5-2021-D3-01-02

Laying down the basis for the demonstration of a Real Time Demonstrator of Multi-Vendor Multi-Terminal HVDC with Grid Forming Capability: Coordinated action -

Call text (as on F&T portal)

View on F&T portal

Expected Outcome:

The call is intended to support all the preparatory phases among all stakeholders (HVDC systems manufacturers, TSOs, wind turbine manufacturers and windfarm developers) leading to a demonstration project to de-risk the technology to enable the installation in Europe of the first Multi-Vendor Multi-Terminal HVDC system with Grid Forming Capability. The HVDC system should guarantee at least the technological capabilities needed for advanced grid management capabilities and the deployment of the offshore grid (active and reactive power controlled separately, support to weak AC grids, black start, etc.). HVDC systems are applicable and can be planned, designed and integrated in any part of the AC grid, i.e. onshore as well as offshore. Following the Commission adoption of the “Strategy on Offshore Renewable Energy”, attention is presently focused to offshore grid application.

The demonstration project deriving from the action will pave the way to the deployment of the offshore energy system, which will enable the integration of increasing amounts of RES in the energy system.

Project results are expected to contribute to all of the following expected outcomes:

  • Solid foundation to ensure investments in DC technologies for the European electricity network needed for the energy transition.
  • Agreement among stakeholders (HVDC systems manufacturers, TSO, Regulators, Standardisation bodies, wind turbine manufacturers, windfarm developers etc.) and planning for the demonstration of a Real Time Demonstrator of Multi-Vendor Multi-Terminal HVDC with Grid Forming Capability, which will lead to the first real-life full scale installation in Europe.
  • New way of framing the European energy system (on- off-shore) architecture and topology.
  • Provide new pathways to offshore energy and development.

Scope:

The supports all the multiple preparatory tasks, which will lead to a global agreement among stakeholders and define the detailed planning for the full-scale industrial demonstrator. These include, but are not limited to:

  • Coordination and organization of a platform involving all stakeholders (HVDC system manufacturers, TSOs, third-party HVDC system integrators, wind turbine manufacturers, offshore wind farm developers).
  • Compatibility of modelling tools towards interoperability.
  • Model sharing between TSOs: legal framework.
  • Roles and responsibilities on interoperability issues.

The selected projects are expected to contribute to relevant BRIDGE[1] activities.

[1] https://www.h2020-bridge.eu/

News flashes

2021-12-09
The call HORIZON-CL5-2021-D3-01 has closed on 20 October 2021.11 proposals have been submitted. The breakdown per topic is: HORIZON-CL5-2021-D3-01-01: 7 proposalsHORIZON-CL5-2021-D3-01-02: 1 proposalHORIZON-CL5-2021-D3-01-03: 1 proposalHORIZON-CL5-2021-D3-01-04: 2 proposals  
2021-12-09
The call HORIZON-CL5-2021-D3-01 has closed on 20 October 2021.11 proposals have been submitted. The breakdown per topic is: HORIZON-CL5-2021-D3-01-01: 7 proposalsHORIZON-CL5-2021-D3-01-02: 1 proposalHORIZON-CL5-2021-D3-01-03: 1 proposalHORIZON-CL5-2021-D3-01-04: 2 proposals  
2021-10-19

UPDATE: please note that the deadline for the call HORIZON-CL5-2021-D3-01 has been extended for 24 hours. New deadline is set to 20-10-2021 17h00.

2021-10-19

 

UPDATE: Please note that the deadline for the call HORIZON-CL5-2021-D3-01 has been extended for 24 hours. New deadline is set to 20-10-2021 17h00.

 

2021-10-19
The submission session is now available for: HORIZON-CL5-2021-D3-01-02(HORIZON-CSA), HORIZON-CL5-2021-D3-01-03(HORIZON-CSA), HORIZON-CL5-2021-D3-01-01(HORIZON-IA), HORIZON-CL5-2021-D3-01-04(HORIZON-COFUND)
2021-10-19

UPDATE: please note that the deadline for the call HORIZON-CL5-2021-D3-01 has been extended for 24 hours. New deadline is set to 20-10-2021 17h00.

2021-10-19

 

UPDATE: Please note that the deadline for the call HORIZON-CL5-2021-D3-01 has been extended for 24 hours. New deadline is set to 20-10-2021 17h00.

 

2021-10-19
The submission session is now available for: HORIZON-CL5-2021-D3-01-02(HORIZON-CSA), HORIZON-CL5-2021-D3-01-03(HORIZON-CSA), HORIZON-CL5-2021-D3-01-01(HORIZON-IA), HORIZON-CL5-2021-D3-01-04(HORIZON-COFUND)
2021-06-24
The submission session is now available for: HORIZON-CL5-2021-D3-01-02(HORIZON-CSA), HORIZON-CL5-2021-D3-01-03(HORIZON-CSA), HORIZON-CL5-2021-D3-01-01(HORIZON-IA), HORIZON-CL5-2021-D3-01-04(HORIZON-COFUND)
2021-06-24
The submission session is now available for: HORIZON-CL5-2021-D3-01-02(HORIZON-CSA), HORIZON-CL5-2021-D3-01-03(HORIZON-CSA), HORIZON-CL5-2021-D3-01-01(HORIZON-IA), HORIZON-CL5-2021-D3-01-04(HORIZON-COFUND)
call topic details
Call status: Closed
Opening date: 2021-06-24 (5 years ago)
Closing date: 2021-10-20 (4 years ago)
Procedure: single-stage

Budget: 1,000,000
Expected grants: 1
Contribution: 1,000,000 - 1,000,000
News flashes

This call topic has been appended 10 times by the EC with news.

  • 2021-12-09
    the call horizon-cl5-2021-d3-01 has clos...
  • 2021-12-09
    the call horizon-cl5-2021-d3-01 has clos...
  • 2021-10-19
    update: please note that the deadline fo...
  • 2021-10-19
     update: please note that the deadl...
  • 2021-10-19
    the submission session is now available...
  • 2021-10-19
    update: please note that the deadline fo...
  • 2021-10-19
     update: please note that the deadl...
  • 2021-10-19
    the submission session is now available...
  • 2021-06-24
    the submission session is now available...
  • 2021-06-24
    the submission session is now available...
Call

HORIZON-CL5-2021-D3-01

Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.

There are 3 other topics in this call:

Source information

Showing the latest information. Found 197 versions of this call topic in the F&T portal.

Information from

  • 2026-10-08_09-34-13
  • 2026-10-08_09-34-05
  • 2026-10-07_09-28-46
  • 2026-10-07_09-28-37
  • 2026-10-06_09-32-38
  • 2026-10-06_09-31-18
  • 2026-10-05_09-27-42
  • 2026-10-05_09-27-32
  • 2026-10-04_09-26-57
  • 2026-10-04_09-26-53
  • 2026-10-03_09-27-47
  • 2026-10-03_09-27-40
  • 2026-10-02_09-28-02
  • 2026-10-02_09-27-33
  • 2026-10-01_09-31-34
  • 2026-10-01_09-31-09
  • 2026-09-29_10-16-50
  • 2026-09-29_10-16-11
  • 2026-09-28_10-17-10
  • 2026-09-28_10-16-34
  • 2026-09-27_10-15-08
  • 2026-09-27_10-14-30
  • 2026-09-26_10-11-23
  • 2026-09-26_10-10-43
  • 2026-09-25_10-11-10
  • 2026-09-25_10-10-35
  • 2026-09-24_10-16-40
  • 2026-09-24_10-16-07
  • 2026-09-23_10-09-49
  • 2026-09-23_10-09-13
  • 2026-09-22_10-10-54
  • 2026-09-22_10-10-16
  • 2026-09-21_10-04-17
  • 2026-09-21_10-03-44
  • 2026-09-20_10-05-03
  • 2026-09-20_10-04-30
  • 2026-09-19_10-01-00
  • 2026-09-19_10-00-34
  • 2026-09-18_10-07-28
  • 2026-09-18_10-06-49
  • 2026-09-17_10-02-36
  • 2026-09-17_10-01-56
  • 2026-09-16_09-59-37
  • 2026-09-16_09-59-03
  • 2026-09-15_10-02-23
  • 2026-09-15_10-01-42
  • 2026-09-14_10-00-58
  • 2026-09-14_10-00-25
  • 2026-09-13_09-58-54
  • 2026-09-13_09-58-18
  • 2026-09-12_10-01-57
  • 2026-09-12_10-01-25
  • 2026-09-11_10-04-46
  • 2026-09-11_10-04-08
  • 2026-09-10_10-01-00
  • 2026-09-10_10-00-24
  • 2026-09-09_10-05-32
  • 2026-09-09_10-04-51
  • 2026-09-08_10-00-54
  • 2026-09-08_10-00-28
  • 2026-09-07_09-59-43
  • 2026-09-07_09-59-13
  • 2026-09-06_09-55-27
  • 2026-09-06_09-54-52
  • 2026-09-05_09-53-43
  • 2026-09-05_09-53-13
  • 2026-09-04_09-53-21
  • 2026-09-04_09-52-43
  • 2026-09-03_09-51-55
  • 2026-09-03_09-51-19
  • 2026-09-02_09-53-36
  • 2026-09-02_09-52-54
  • 2026-09-01_09-51-37
  • 2026-09-01_09-50-59
  • 2026-08-31_09-57-26
  • 2026-08-31_09-56-45
  • 2026-08-30_09-47-54
  • 2026-08-30_09-47-15
  • 2026-08-29_09-49-17
  • 2026-08-29_09-48-47
  • 2026-08-28_09-51-52
  • 2026-08-28_09-51-15
  • 2026-08-27_09-39-54
  • 2026-08-27_09-39-14
  • 2026-08-25_09-45-29
  • 2026-08-25_09-44-57
  • 2026-08-24_09-40-55
  • 2026-08-24_09-40-18
  • 2026-08-23_09-38-15
  • 2026-08-23_09-37-42
  • 2026-08-22_09-41-21
  • 2026-08-22_09-40-50
  • 2026-08-21_09-32-15
  • 2026-08-21_09-31-39
  • 2026-08-20_09-38-21
  • 2026-08-20_09-37-40
  • 2026-08-19_09-39-07
  • 2026-08-19_09-38-24
  • 2026-08-18_09-32-51
  • 2026-08-18_09-32-13
  • 2026-08-17_09-34-52
  • 2026-08-17_09-34-14
  • 2026-08-16_09-26-17
  • 2026-08-16_09-25-36
  • 2026-08-15_09-41-20
  • 2026-08-15_09-40-51
  • 2026-08-14_09-32-36
  • 2026-08-14_09-32-03
  • 2026-08-13_09-26-35
  • 2026-08-13_09-26-01
  • 2026-08-12_09-26-19
  • 2026-08-12_09-25-44
  • 2026-08-11_09-26-35
  • 2026-08-11_09-26-01
  • 2026-08-10_09-27-29
  • 2026-08-10_09-26-54
  • 2026-08-09_09-22-55
  • 2026-08-09_09-22-21
  • 2026-08-08_09-22-02
  • 2026-08-08_09-21-30
  • 2026-08-07_09-20-13
  • 2026-08-07_09-19-38
  • 2026-08-06_09-22-35
  • 2026-08-06_09-22-02
  • 2026-08-05_09-22-53
  • 2026-08-05_09-22-20
  • 2026-08-04_09-22-04
  • 2026-08-04_09-21-31
  • 2026-08-03_09-21-09
  • 2026-08-03_09-20-39
  • 2026-08-02_09-16-56
  • 2026-08-02_09-16-27
  • 2026-08-01_09-17-41
  • 2026-08-01_09-17-10
  • 2026-07-31_09-18-32
  • 2026-07-31_09-18-07
  • 2026-07-30_09-15-40
  • 2026-07-30_09-15-19
  • 2026-07-29_09-18-03
  • 2026-07-29_09-17-36
  • 2026-07-28_09-17-31
  • 2026-07-28_09-16-55
  • 2026-07-27_09-10-09
  • 2026-07-27_09-09-35
  • 2026-07-26_09-06-02
  • 2026-07-26_09-05-33
  • 2026-07-25_09-06-56
  • 2026-07-25_09-06-30
  • 2026-07-24_09-09-57
  • 2026-07-24_09-09-24
  • 2026-07-23_09-07-16
  • 2026-07-23_09-06-48
  • 2026-07-22_09-09-55
  • 2026-07-22_09-09-21
  • 2026-07-21_09-09-03
  • 2026-07-21_09-08-32
  • 2026-07-20_09-08-21
  • 2026-07-20_09-07-55
  • 2026-07-19_09-07-53
  • 2026-07-19_09-07-25
  • 2026-07-18_09-06-15
  • 2026-07-18_09-05-43
  • 2026-07-17_09-04-39
  • 2026-07-17_09-04-07
  • 2026-07-16_08-37-17
  • 2026-07-16_08-37-00
  • 2026-07-15_08-38-50
  • 2026-07-15_08-38-31
  • 2026-07-14_08-35-24
  • 2026-07-14_08-35-04
  • 2026-07-13_08-37-12
  • 2026-07-13_08-36-54
  • 2026-07-12_08-35-58
  • 2026-07-12_08-35-38
  • 2026-07-11_08-34-42
  • 2026-07-11_08-34-23
  • 2026-07-10_08-33-17
  • 2026-07-10_08-32-59
  • 2026-07-09_08-34-38
  • 2026-07-09_08-34-16
  • 2026-07-08_08-34-11
  • 2026-07-08_08-33-51
  • 2026-07-07_08-32-59
  • 2026-07-07_08-32-33
  • 2026-07-06_08-33-12
  • 2026-07-06_08-32-52
  • 2026-07-05_08-28-25
  • 2026-07-05_08-28-08
  • 2026-07-04_08-27-47
  • 2026-07-04_08-27-26
  • 2026-07-03_08-29-49
  • 2026-07-03_08-29-33
  • 2026-07-02_08-28-30
  • 2026-07-02_08-28-08
  • 2026-06-27_09-11-52
  • 2026-03-08_07-26-09
  • 2024-03-30_14-17-55

Check the differences between the versions.

Annotations

You must be logged in to add annotations
No annotations yet

Events

Hand-picked events relevant to this call topic.

No events yet

There are currently no events linked to this call topic.

Timeline

Track where this call stands in its lifecycle, from work programme to grant signature, and see what's likely to happen next.

Call published · 30 Sep 2024 (2 years ago)

All expected milestones for this call have passed.

Today

Work programme published

16 Apr 2021 · est.

Call opens

24 Jun 2021

Call closes

20 Oct 2021

Outcome expected

20 Mar 2022 · est.

Grant agreement signed

20 Jun 2022 · est.

Call published

30 Sep 2024

Preparation Open for submission Evaluation Grant preparation Not yet reached
  1. Work programme published Estimated

    16 Apr 2021 · 5 years ago

    Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.

  2. Call opens

    24 Jun 2021 · 5 years ago

    Submissions can be made from this date.

  3. Call closes

    20 Oct 2021 · 4 years ago

    Deadline to submit a proposal.

  4. Outcome expected Estimated

    20 Mar 2022 · 4 years ago

    The maximum time to inform applicants of the evaluation outcome is five months after the call closes.

  5. Grant agreement signed Estimated

    20 Jun 2022 · 4 years ago

    The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.

  6. Call published

    30 Sep 2024 · 2 years ago

    This topic was first published in TopicTree.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Ecosystem bubbles

This call topic is part of the following thematic bubbles.

Not part of a bubble yet

This call topic has not been grouped into an ecosystem bubble.

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal