Closed HORIZON-CL4-2022-TWIN-TRANSITION-01-13 HORIZON

Raw material preparation for clean steel production (Clean Steel Partnership) (IA)

Call text (as on F&T portal)

View on F&T portal

Expected Outcome:

Projects related to the two main raw-materials in the iron and steelmaking route: the iron-ore and the scrap.

As regards iron ore, the availability of high-grade iron ores is expected to become a more critical factor, as demand will increase. Therefore, technologies for the upgrade and the use of low-quality iron ores are needed. This includes low carbon technologies for sintering/ pelletisation and/or cold bonded iron ore agglomeration.

Projects are expected to contribute to the following outcomes:

  • Testing and validation of technologies for the upgrade and the use of low-quality iron ores. This includes low carbon technologies for sintering/ pelletisation and/or cold bonded iron ore agglomeration;
  • Identification of best available and applicable technologies for the reduction of impurities in post-consumer scrap;
  • Technologies for the valorisation of low-quality scrap streams.

Scope:

The concepts to be developed under this topic are expected to address one or more of the following areas:

  • Enhanced utilisation of scrap, through improved scrap sorting and removal of scrap pollution, by new detecting technologies. The aim is to remove these impurities before melting, in order to achieve the same quality of the finished product and reducing CO2 emissions;
  • Technologies allowing upgrade processes in low grade iron ores to make them suitable for pelletisation or direct use in existing steelworks to address the issue of the availability of high grade iron ores which is expected to become a more critical factor in the coming years as well as broadening the types of ore grades that can be utilized from different sources;
  • Application of cold bonded agglomerate: binders, raw materials composition and processing conditions for the use of low quality iron ore grades.

Proposals submitted under this topic should include a business case and exploitation strategy, as outlined in the introduction to this Destination.

This topic implements the co-programmed European Partnership on Clean Steel.

In this topic the integration of the gender dimension (sex and gender analysis) in research and innovation content is not a mandatory requirement

null

Activities are expected to start at TRL 6 and achieve TRL 8 by the end of the project – see General Annex B.

News flashes

2022-08-03

Call for proposals: HORIZON-CL4-2022-TWIN-TRANSITION-01

                                 Single-stage topics

 Deadline: 30 March 2022

 Available budget: EUR 334,500,000.00

 

Topic code

Type(s) of action

Budget

HORIZON-CL4-2022-TWIN-TRANSITION-01-01

IA

27.50

HORIZON-CL4-2022-TWIN-TRANSITION-01-02

RIA

21.50

HORIZON-CL4-2022-TWIN-TRANSITION-01-03

RIA

21.50

HORIZON-CL4-2022-TWIN-TRANSITION-01-04

RIA

21.50

HORIZON-CL4-2022-TWIN-TRANSITION-01-06

IA

30.00

HORIZON-CL4-2022-TWIN-TRANSITION-01-07

RIA

22.00

HORIZON-CL4-2022-TWIN-TRANSITION-01-09

IA

9.00

HORIZON-CL4-2022-TWIN-TRANSITION-01-10

IA

42.50

HORIZON-CL4-2022-TWIN-TRANSITION-01-11

IA

42.50

HORIZON-CL4-2022-TWIN-TRANSITION-01-13

IA

14.00

HORIZON-CL4-2022-TWIN-TRANSITION-01-15

RIA

30.00

HORIZON-CL4-2022-TWIN-TRANSITION-01-16

IA

10.00

HORIZON-CL4-2022-TWIN-TRANSITION-01-17

IA

42.50

 

The Commission has now completed the evaluation of the proposals submitted to the above-mentioned call.

 

The results of the evaluation are as follows:

Number of proposals submitted (including proposals transferred from or to other calls): 249

Number of inadmissible proposals: 0

Number of ineligible proposals: 8

Number of above-threshold proposals: 155

Total budget requested for above-threshold proposals: EUR 1,084,354,325.00

 

We recently informed the applicants about the evaluation results for their proposals.

It is expected that the first grant agreements will be signed by November 2022.

 

Information on the selected projects will be published on CORDIS[1] after that date.

Please note that the number of proposals that can finally be funded will depend on the finally available budget and the formal selection by the Commission.

      For questions, please contact the Research Enquiry Service[2].

 

[1]      Available at http://cordis.europa.eu/projects/home_en.html

[2]      Available at http://ec.europa.eu/research/enquiries

 

 

 
2022-08-03

Call for proposals: HORIZON-CL4-2022-TWIN-TRANSITION-01

                                 Single-stage topics

 Deadline: 30 March 2022

 Available budget: EUR 334,500,000.00

 

Topic code

Type(s) of action

Budget

HORIZON-CL4-2022-TWIN-TRANSITION-01-01

IA

27.50

HORIZON-CL4-2022-TWIN-TRANSITION-01-02

RIA

21.50

HORIZON-CL4-2022-TWIN-TRANSITION-01-03

RIA

21.50

HORIZON-CL4-2022-TWIN-TRANSITION-01-04

RIA

21.50

HORIZON-CL4-2022-TWIN-TRANSITION-01-06

IA

30.00

HORIZON-CL4-2022-TWIN-TRANSITION-01-07

RIA

22.00

HORIZON-CL4-2022-TWIN-TRANSITION-01-09

IA

9.00

HORIZON-CL4-2022-TWIN-TRANSITION-01-10

IA

42.50

HORIZON-CL4-2022-TWIN-TRANSITION-01-11

IA

42.50

HORIZON-CL4-2022-TWIN-TRANSITION-01-13

IA

14.00

HORIZON-CL4-2022-TWIN-TRANSITION-01-15

RIA

30.00

HORIZON-CL4-2022-TWIN-TRANSITION-01-16

IA

10.00

HORIZON-CL4-2022-TWIN-TRANSITION-01-17

IA

42.50

 

The Commission has now completed the evaluation of the proposals submitted to the above-mentioned call.

 

The results of the evaluation are as follows:

Number of proposals submitted (including proposals transferred from or to other calls): 249

Number of inadmissible proposals: 0

Number of ineligible proposals: 8

Number of above-threshold proposals: 155

Total budget requested for above-threshold proposals: EUR 1,084,354,325.00

 

We recently informed the applicants about the evaluation results for their proposals.

It is expected that the first grant agreements will be signed by November 2022.

 

Information on the selected projects will be published on CORDIS[1] after that date.

Please note that the number of proposals that can finally be funded will depend on the finally available budget and the formal selection by the Commission.

      For questions, please contact the Research Enquiry Service[2].

 

[1]      Available at http://cordis.europa.eu/projects/home_en.html

[2]      Available at http://ec.europa.eu/research/enquiries

 

 

 
2022-04-05

Deadline HORIZON-CL4-2022-TWIN-TRANSITION-01: 30.03.2022

A total of 252 proposals were submitted in response to this call.The number of proposals for each topic is shown below:

HORIZON-CL4-2022-TWIN-TRANSITION-01-01 : 17

HORIZON-CL4-2022-TWIN-TRANSITION-01-02 : 42

HORIZON-CL4-2022-TWIN-TRANSITION-01-03 : 19

HORIZON-CL4-2022-TWIN-TRANSITION-01-04 : 23

HORIZON-CL4-2022-TWIN-TRANSITION-01-06 : 18

HORIZON-CL4-2022-TWIN-TRANSITION-01-07 : 48

HORIZON-CL4-2022-TWIN-TRANSITION-01-09 : 22

HORIZON-CL4-2022-TWIN-TRANSITION-01-10 : 16

HORIZON-CL4-2022-TWIN-TRANSITION-01-11 : 10

HORIZON-CL4-2022-TWIN-TRANSITION-01-13 : 3

HORIZON-CL4-2022-TWIN-TRANSITION-01-15 : 15

HORIZON-CL4-2022-TWIN-TRANSITION-01-16 : 4

HORIZON-CL4-2022-TWIN-TRANSITION-01-17 : 15

2022-04-05

Deadline HORIZON-CL4-2022-TWIN-TRANSITION-01: 30.03.2022

A total of 252 proposals were submitted in response to this call.The number of proposals for each topic is shown below:

HORIZON-CL4-2022-TWIN-TRANSITION-01-01 : 17

HORIZON-CL4-2022-TWIN-TRANSITION-01-02 : 42

HORIZON-CL4-2022-TWIN-TRANSITION-01-03 : 19

HORIZON-CL4-2022-TWIN-TRANSITION-01-04 : 23

HORIZON-CL4-2022-TWIN-TRANSITION-01-06 : 18

HORIZON-CL4-2022-TWIN-TRANSITION-01-07 : 48

HORIZON-CL4-2022-TWIN-TRANSITION-01-09 : 22

HORIZON-CL4-2022-TWIN-TRANSITION-01-10 : 16

HORIZON-CL4-2022-TWIN-TRANSITION-01-11 : 10

HORIZON-CL4-2022-TWIN-TRANSITION-01-13 : 3

HORIZON-CL4-2022-TWIN-TRANSITION-01-15 : 15

HORIZON-CL4-2022-TWIN-TRANSITION-01-16 : 4

HORIZON-CL4-2022-TWIN-TRANSITION-01-17 : 15

2022-03-03

Please note that the 'Other annexes' box has been added in the submission system to allow the upload of an Annex with the description of the use of financial support to third parties. The description of the content of this annex is described in the Part B of the Application Form.

This annex should only be uploaded for topic:

HORIZON-CL4-2022-TWIN-TRANSITION-01-06 - ICT Innovation for Manufacturing Sustainability in SMEs (I4MS2) (Made in Europe Partnership) (IA)

Please do not use it for any other topic, the information will be disregarded.

2022-03-03

Please note that the 'Other annexes' box has been added in the submission system to allow the upload of an Annex with the description of the use of financial support to third parties. The description of the content of this annex is described in the Part B of the Application Form.

This annex should only be uploaded for topic:

HORIZON-CL4-2022-TWIN-TRANSITION-01-06 - ICT Innovation for Manufacturing Sustainability in SMEs (I4MS2) (Made in Europe Partnership) (IA)

Please do not use it for any other topic, the information will be disregarded.

2021-10-12
The submission session is now available for: HORIZON-CL4-2022-TWIN-TRANSITION-01-04(HORIZON-RIA), HORIZON-CL4-2022-TWIN-TRANSITION-01-15(HORIZON-RIA), HORIZON-CL4-2022-TWIN-TRANSITION-01-10(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-01(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-11(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-17(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-06(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-09(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-16(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-13(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-03(HORIZON-RIA), HORIZON-CL4-2022-TWIN-TRANSITION-01-02(HORIZON-RIA), HORIZON-CL4-2022-TWIN-TRANSITION-01-07(HORIZON-RIA)
2021-10-12
The submission session is now available for: HORIZON-CL4-2022-TWIN-TRANSITION-01-04(HORIZON-RIA), HORIZON-CL4-2022-TWIN-TRANSITION-01-15(HORIZON-RIA), HORIZON-CL4-2022-TWIN-TRANSITION-01-10(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-01(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-11(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-17(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-06(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-09(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-16(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-13(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-03(HORIZON-RIA), HORIZON-CL4-2022-TWIN-TRANSITION-01-02(HORIZON-RIA), HORIZON-CL4-2022-TWIN-TRANSITION-01-07(HORIZON-RIA)
call topic details
Call status: Closed
Opening date: 2021-10-12 (5 years ago)
Closing date: 2022-03-30 (4 years ago)
Procedure: single-stage

Budget: 14,000,000
Expected grants: 3
Contribution: 4,000,000 - 5,000,000
News flashes

This call topic has been appended 8 times by the EC with news.

  • 2022-08-03
    call for proposals: horizon-cl4-2022-twi...
  • 2022-08-03
    call for proposals: horizon-cl4-2022-twi...
  • 2022-04-05
    deadline horizon-cl4-2022-twin-transitio...
  • 2022-04-05
    deadline horizon-cl4-2022-twin-transitio...
  • 2022-03-03
    please note that the 'other annexes' box...
  • 2022-03-03
    please note that the 'other annexes' box...
  • 2021-10-12
    the submission session is now available...
  • 2021-10-12
    the submission session is now available...
Source information

Showing the latest information. Found 205 versions of this call topic in the F&T portal.

Information from

  • 2026-10-15_06-31-15
  • 2026-10-15_06-30-50
  • 2026-10-14_06-25-40
  • 2026-10-14_06-24-05
  • 2026-10-13_06-29-05
  • 2026-10-13_06-27-45
  • 2026-10-12_09-24-40
  • 2026-10-12_09-24-12
  • 2026-10-11_09-23-30
  • 2026-10-11_09-22-56
  • 2026-10-10_09-25-56
  • 2026-10-10_09-25-24
  • 2026-10-09_09-22-04
  • 2026-10-09_09-21-38
  • 2026-10-08_09-26-03
  • 2026-10-08_09-25-30
  • 2026-10-07_09-21-49
  • 2026-10-07_09-20-24
  • 2026-10-06_09-24-24
  • 2026-10-06_09-22-42
  • 2026-10-05_09-20-22
  • 2026-10-05_09-18-43
  • 2026-10-04_09-19-53
  • 2026-10-04_09-18-16
  • 2026-10-03_09-20-53
  • 2026-10-03_09-18-58
  • 2026-10-02_09-19-17
  • 2026-10-02_09-19-11
  • 2026-10-01_09-22-51
  • 2026-10-01_09-22-42
  • 2026-09-29_10-06-46
  • 2026-09-29_10-06-35
  • 2026-09-28_10-06-54
  • 2026-09-28_10-06-43
  • 2026-09-27_10-05-00
  • 2026-09-27_10-04-53
  • 2026-09-26_10-01-28
  • 2026-09-26_10-01-22
  • 2026-09-25_10-01-07
  • 2026-09-25_10-00-59
  • 2026-09-24_10-06-56
  • 2026-09-24_10-06-49
  • 2026-09-23_10-00-17
  • 2026-09-23_10-00-07
  • 2026-09-22_10-00-58
  • 2026-09-22_10-00-49
  • 2026-09-21_09-54-29
  • 2026-09-21_09-54-21
  • 2026-09-20_09-55-25
  • 2026-09-20_09-55-18
  • 2026-09-19_09-51-10
  • 2026-09-19_09-51-03
  • 2026-09-18_09-57-57
  • 2026-09-18_09-57-47
  • 2026-09-17_09-52-57
  • 2026-09-17_09-52-48
  • 2026-09-16_09-49-34
  • 2026-09-16_09-49-27
  • 2026-09-15_09-52-21
  • 2026-09-15_09-52-10
  • 2026-09-14_09-50-55
  • 2026-09-14_09-50-48
  • 2026-09-13_09-49-01
  • 2026-09-13_09-48-53
  • 2026-09-12_09-52-07
  • 2026-09-12_09-51-52
  • 2026-09-11_09-55-01
  • 2026-09-11_09-54-56
  • 2026-09-10_09-51-25
  • 2026-09-10_09-51-19
  • 2026-09-09_09-55-26
  • 2026-09-09_09-55-20
  • 2026-09-08_09-51-07
  • 2026-09-08_09-51-00
  • 2026-09-07_09-50-07
  • 2026-09-07_09-49-58
  • 2026-09-06_09-45-49
  • 2026-09-06_09-45-43
  • 2026-09-05_09-44-02
  • 2026-09-05_09-43-55
  • 2026-09-04_09-43-14
  • 2026-09-04_09-43-07
  • 2026-09-03_09-42-32
  • 2026-09-03_09-42-26
  • 2026-09-02_09-43-47
  • 2026-09-02_09-43-45
  • 2026-09-01_09-41-56
  • 2026-09-01_09-41-46
  • 2026-08-30_09-38-09
  • 2026-08-30_09-38-06
  • 2026-08-29_09-39-52
  • 2026-08-29_09-39-44
  • 2026-08-28_09-42-16
  • 2026-08-28_09-42-07
  • 2026-08-25_09-36-11
  • 2026-08-25_09-36-09
  • 2026-08-24_09-31-18
  • 2026-08-24_09-31-15
  • 2026-08-23_09-29-14
  • 2026-08-23_09-29-07
  • 2026-08-21_09-23-04
  • 2026-08-21_09-23-02
  • 2026-08-20_09-29-06
  • 2026-08-20_09-28-58
  • 2026-08-19_09-29-46
  • 2026-08-19_09-29-40
  • 2026-08-18_09-23-26
  • 2026-08-18_09-23-19
  • 2026-08-16_09-16-56
  • 2026-08-16_09-16-50
  • 2026-08-15_09-32-22
  • 2026-08-15_09-32-17
  • 2026-08-14_09-23-20
  • 2026-08-14_09-23-14
  • 2026-08-13_09-17-22
  • 2026-08-13_09-17-16
  • 2026-08-12_09-16-56
  • 2026-08-12_09-16-49
  • 2026-08-11_09-17-33
  • 2026-08-11_09-17-27
  • 2026-08-09_09-13-51
  • 2026-08-09_09-13-42
  • 2026-08-08_09-13-02
  • 2026-08-08_09-12-54
  • 2026-08-07_09-11-05
  • 2026-08-07_09-10-51
  • 2026-08-06_09-13-42
  • 2026-08-06_09-13-34
  • 2026-08-05_09-13-48
  • 2026-08-05_09-13-42
  • 2026-08-04_09-13-11
  • 2026-08-04_09-13-09
  • 2026-08-02_09-08-01
  • 2026-08-02_09-07-52
  • 2026-08-01_09-08-48
  • 2026-08-01_09-08-45
  • 2026-07-31_09-09-45
  • 2026-07-31_09-09-39
  • 2026-07-30_09-07-13
  • 2026-07-30_09-07-07
  • 2026-07-29_09-09-09
  • 2026-07-29_09-09-01
  • 2026-07-27_09-01-31
  • 2026-07-27_09-01-25
  • 2026-07-26_08-57-21
  • 2026-07-26_08-57-18
  • 2026-07-25_08-58-32
  • 2026-07-25_08-58-25
  • 2026-07-23_08-58-35
  • 2026-07-23_08-58-28
  • 2026-07-22_09-01-24
  • 2026-07-22_09-01-17
  • 2026-07-21_09-00-12
  • 2026-07-21_09-00-10
  • 2026-07-20_08-59-43
  • 2026-07-20_08-59-42
  • 2026-07-19_08-59-37
  • 2026-07-19_08-59-34
  • 2026-07-18_08-57-44
  • 2026-07-18_08-57-37
  • 2026-07-17_08-56-18
  • 2026-07-17_08-56-15
  • 2026-07-16_08-29-59
  • 2026-07-16_08-29-51
  • 2026-07-15_08-31-50
  • 2026-07-15_08-31-43
  • 2026-07-14_08-27-50
  • 2026-07-14_08-27-48
  • 2026-07-13_08-30-07
  • 2026-07-13_08-29-57
  • 2026-07-12_08-28-32
  • 2026-07-12_08-28-28
  • 2026-07-11_08-27-45
  • 2026-07-11_08-27-41
  • 2026-07-10_08-26-08
  • 2026-07-10_08-26-04
  • 2026-07-09_08-27-12
  • 2026-07-09_08-27-09
  • 2026-07-08_08-27-04
  • 2026-07-08_08-26-59
  • 2026-07-07_08-25-38
  • 2026-07-07_08-25-35
  • 2026-07-06_08-26-11
  • 2026-07-06_08-26-09
  • 2026-07-05_08-21-12
  • 2026-07-05_08-21-09
  • 2026-07-04_08-20-33
  • 2026-07-04_08-20-28
  • 2026-07-03_08-22-33
  • 2026-07-03_08-22-25
  • 2026-07-02_08-21-13
  • 2026-07-02_08-21-12
  • 2026-07-01_09-15-20
  • 2026-07-01_09-13-58
  • 2026-06-30_09-50-57
  • 2026-06-30_09-12-06
  • 2026-06-29_11-35-48
  • 2026-06-29_09-14-20
  • 2026-06-28_09-33-00
  • 2026-06-28_09-02-13
  • 2026-06-27_09-33-42
  • 2026-06-27_09-02-31
  • 2026-06-27_09-01-38
  • 2026-02-18_07-21-32
  • 2024-03-30_14-17-36

Check the differences between the versions.

Annotations

You must be logged in to add annotations
No annotations yet

Events

Hand-picked events relevant to this call topic.

No events yet

There are currently no events linked to this call topic.

Timeline

Track where this call stands in its lifecycle, from work programme to grant signature, and see what's likely to happen next.

Call published · 30 Sep 2024 (2 years ago)

All expected milestones for this call have passed.

Today

Work programme published

16 Apr 2021 · est.

Call opens

12 Oct 2021

Call closes

30 Mar 2022

Outcome expected

30 Aug 2022 · est.

Grant agreement signed

30 Nov 2022 · est.

Call published

30 Sep 2024

Preparation Open for submission Evaluation Grant preparation Not yet reached
  1. Work programme published Estimated

    16 Apr 2021 · 5 years ago

    Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.

  2. Call opens

    12 Oct 2021 · 5 years ago

    Submissions can be made from this date.

  3. Call closes

    30 Mar 2022 · 4 years ago

    Deadline to submit a proposal.

  4. Outcome expected Estimated

    30 Aug 2022 · 4 years ago

    The maximum time to inform applicants of the evaluation outcome is five months after the call closes.

  5. Grant agreement signed Estimated

    30 Nov 2022 · 3 years ago

    The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.

  6. Call published

    30 Sep 2024 · 2 years ago

    This topic was first published in TopicTree.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal