HORIZON-CL4-2021-SPACE-01-62

Quantum technologies for space gravimetry -

Related topics

Drag to rearrange · hover a topic or connection to preview why it's linked, click to pin that panel open

Topics in this graph

  • HORIZON-CL4-2024-DIGITAL-EMERGING-02-01 — Developing and deploying a network of quantum gravimeters in Europe

    Both topics deal with Quantum Gravimetry. The topic HORIZON-CL4-2024-DIGITAL-EMERGING-02-01 relates to the deployment of a network of earth-based quantum gravimeters whereas the topic HORIZON-CL4-2021-SPACE-01-62 asked for advancing space-base quantum gravimetry to TRL5.

  • HORIZON-CL4-2023-SPACE-01-63 — Quantum Space Gravimetry Phase-A Study

    Connected via HORIZON-CL4-2024-DIGITAL-EMERGING-02-01, not directly to the current topic.

    Both topics deal with Quantum Gravimetry. The topic HORIZON-CL4-2024-DIGITAL-EMERGING-02-01 relates to the deployment of a network of earth-based quantum gravimeters whereas the topic HORIZON-CL4-2023-SPACE-01-63 is about the selection of a Quantum Space Gravimetry pathfinder mission.

  • HORIZON-CL4-2024-SPACE-01-64 — Quantum Space Gravimetry Phase-B study & Technology Maturation

    Connected via HORIZON-CL4-2024-DIGITAL-EMERGING-02-01, not directly to the current topic.

    Both topics deal with Quantum Gravimetry. The topic HORIZON-CL4-2024-DIGITAL-EMERGING-02-01 relates to the deployment of a network of earth-based quantum gravimeters whereas the topic HORIZON-CL4-2024-SPACE-01-64 is the third topic in a series dealing with space-base quantum gravimetry that is about a preliminary definition of a quantum space gravimetry pathfinder mission with the intent to reach TRL6/7 at the end.

Bold node = current topic · node color = call status · hover for details, click to pin · smaller, lighter topics are two steps away

Call text (as on F&T portal)

View on F&T portal

Expected Outcome:

• Support the EU space policy and the green deal by paving the way for the deployment of a future EU Earth observation mission making use of quantum gravimetry

• Ensure EU non-dependence for the development of capacities leading to the availability of quantum space gravimetry

• Enhance the TRL of all (critical) components necessary to build quantum gravimetry for space

These outcomes will contribute to securing the autonomy of supply for critical technologies and equipment, and fostering the EU's space sector competitiveness, in line with the Expected Impact of the destination.

Proposals must address all the above-mentioned, expected outcomes.

Scope:

The scope of this topic is the development of EU technologies and components for a space quantum gravimeter or gradiometer (this may include hybrid sensors, relying both on quantum and classical technologies) and which will lead to the development of an Engineering Model and its potential qualification for a pathfinder mission.

The enhancement of the TRL up to TRL5 for cold atom interferometry (including Bose-Einstein Condensates) components is a key objective of this call. The scope also covers the development of software simulation tools to analyse the different gravimetry mission concepts linked to these sensors or processing and analysis of the sensor data. This also includes the development and/or use of testbeds such as the Einstein elevator or any other system used to recreate or simulate the space environment (including airborne testing) to test quantum gravimeters technology components.

The priority for this topic is the development of the technology leading to the deployment of a pathfinder mission based on cold atom interferometry demonstrating the gravimetric performance.

The proposals should answer the whole scope of this topic.

In this topic the integration of the gender dimension (sex and gender analysis) in research and innovation content is not a mandatory requirement.

null

Activities are expected to achieve TRL5 by the end of the project – see General Annex B.

News flashes

2022-06-30

An overview of the HORIZON-CL4-2021-SPACE-01 evaluation results (Flash Call Info) is now available under the link.

2022-06-30

An overview of the HORIZON-CL4-2021-SPACE-01 evaluation results (Flash Call Info) is now available under the link.

2022-06-30

An overview of the HORIZON-CL4-2021-SPACE-01 evaluation results (Flash Call Info) is now available under the link.

2022-06-30

An overview of the HORIZON-CL4-2021-SPACE-01 evaluation results (Flash Call Info) is now available under the link.

2022-02-16
Call HORIZON-CL4-2021-SPACE-01 has closed on the 16/02/2022. 61 proposals have been submitted. The breakdown per topic is:• HORIZON-CL4-2021-SPACE-01-11: 8 proposals• HORIZON-CL4-2021-SPACE-01-12: 19 proposals• HORIZON-CL4-2021-SPACE-01-21: 3 proposals• HORIZON-CL4-2021-SPACE-01-22: 3 proposals• HORIZON-CL4-2021-SPACE-01-23: 12 proposals• HORIZON-CL4-2021-SPACE-01-41: 1 proposal• HORIZON-CL4-2021-SPACE-01-42: 1 proposal• HORIZON-CL4-2021-SPACE-01-43: 3 proposals• HORIZON-CL4-2021-SPACE-01-44: 3 proposals• HORIZON-CL4-2021-SPACE-01-62: 1 proposal• HORIZON-CL4-2021-SPACE-01-81: 7 proposals Evaluation results are expected to be communicated in the end of June 2022. 
2022-02-16
Call HORIZON-CL4-2021-SPACE-01 has closed on the 16/02/2022. 61 proposals have been submitted. The breakdown per topic is:• HORIZON-CL4-2021-SPACE-01-11: 8 proposals• HORIZON-CL4-2021-SPACE-01-12: 19 proposals• HORIZON-CL4-2021-SPACE-01-21: 3 proposals• HORIZON-CL4-2021-SPACE-01-22: 3 proposals• HORIZON-CL4-2021-SPACE-01-23: 12 proposals• HORIZON-CL4-2021-SPACE-01-41: 1 proposal• HORIZON-CL4-2021-SPACE-01-42: 1 proposal• HORIZON-CL4-2021-SPACE-01-43: 3 proposals• HORIZON-CL4-2021-SPACE-01-44: 3 proposals• HORIZON-CL4-2021-SPACE-01-62: 1 proposal• HORIZON-CL4-2021-SPACE-01-81: 7 proposals Evaluation results are expected to be communicated in the end of June 2022. 
2021-12-22
Declaration of ownership and controlA compulsory questionnaire on the declaration of ownership and control is to be filled by all project participants as part of the application. All declarations must be assembled by the coordinator and uploaded in a single file in the portal submission system. For additional information on the assessment of ownership and control process and on the guarantees please consult the draft guidance for participation in restricted calls.
2021-12-22
Declaration of ownership and controlA compulsory questionnaire on the declaration of ownership and control is to be filled by all project participants as part of the application. All declarations must be assembled by the coordinator and uploaded in a single file in the portal submission system. For additional information on the assessment of ownership and control process and on the guarantees please consult the draft guidance for participation in restricted calls.
2021-11-02
The submission session is now available for: HORIZON-CL4-2021-SPACE-01-12(HORIZON-RIA), HORIZON-CL4-2021-SPACE-01-21(HORIZON-RIA), HORIZON-CL4-2021-SPACE-01-62(HORIZON-RIA), HORIZON-CL4-2021-SPACE-01-22(HORIZON-RIA), HORIZON-CL4-2021-SPACE-01-23(HORIZON-RIA), HORIZON-CL4-2021-SPACE-01-42(HORIZON-RIA), HORIZON-CL4-2021-SPACE-01-81(HORIZON-RIA), HORIZON-CL4-2021-SPACE-01-11(HORIZON-RIA), HORIZON-CL4-2021-SPACE-01-41(HORIZON-RIA), HORIZON-CL4-2021-SPACE-01-43(HORIZON-RIA), HORIZON-CL4-2021-SPACE-01-44(HORIZON-RIA)
2021-11-02
The submission session is now available for: HORIZON-CL4-2021-SPACE-01-12(HORIZON-RIA), HORIZON-CL4-2021-SPACE-01-21(HORIZON-RIA), HORIZON-CL4-2021-SPACE-01-62(HORIZON-RIA), HORIZON-CL4-2021-SPACE-01-22(HORIZON-RIA), HORIZON-CL4-2021-SPACE-01-23(HORIZON-RIA), HORIZON-CL4-2021-SPACE-01-42(HORIZON-RIA), HORIZON-CL4-2021-SPACE-01-81(HORIZON-RIA), HORIZON-CL4-2021-SPACE-01-11(HORIZON-RIA), HORIZON-CL4-2021-SPACE-01-41(HORIZON-RIA), HORIZON-CL4-2021-SPACE-01-43(HORIZON-RIA), HORIZON-CL4-2021-SPACE-01-44(HORIZON-RIA)
2021-10-29

Following the adoption of the revised Horizon Work Programme on 28 October 2021, for technical reasons the planned opening date of the call has been postponed until 2 November 2021.

2021-10-29

Following the adoption of the revised Horizon Work Programme on 28 October 2021, for technical reasons the planned opening date of the call has been postponed until 2 November 2021.

call topic details
Call status: Closed
Opening date: 2021-11-02 (4 years ago)
Closing date: 2022-02-16 (4 years ago)
Procedure: single-stage

Budget: 17,000,000
Expected grants: 1
Contribution: 15,000,000 - 17,000,000
News flashes

This call topic has been appended 12 times by the EC with news.

  • 2022-06-30
    an overview of the horizon-cl4-2021-spac...
  • 2022-06-30
    an overview of the horizon-cl4-2021-spac...
  • 2022-06-30
    an overview of the horizon-cl4-2021-spac...
  • 2022-06-30
    an overview of the horizon-cl4-2021-spac...
  • 2022-02-16
    call horizon-cl4-2021-space-01 has close...
  • 2022-02-16
    call horizon-cl4-2021-space-01 has close...
  • 2021-12-22
    declaration of ownership and controla co...
  • 2021-12-22
    declaration of ownership and controla co...
  • 2021-11-02
    the submission session is now available...
  • 2021-11-02
    the submission session is now available...
  • 2021-10-29
    following the adoption of the revised ho...
  • 2021-10-29
    following the adoption of the revised ho...
Call

HORIZON-CL4-2021-SPACE-01

Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.

There are 10 other topics in this call:

Source information

Showing the latest information. Found 205 versions of this call topic in the F&T portal.

Information from

  • 2026-10-08_09-17-03
  • 2026-10-08_09-15-25
  • 2026-10-07_09-12-48
  • 2026-10-07_09-11-10
  • 2026-10-06_09-12-09
  • 2026-10-06_09-12-05
  • 2026-10-05_09-08-36
  • 2026-10-05_09-08-33
  • 2026-10-04_09-10-47
  • 2026-10-04_09-09-13
  • 2026-10-02_09-09-13
  • 2026-10-02_09-09-02
  • 2026-10-01_09-12-07
  • 2026-10-01_09-11-53
  • 2026-09-29_09-53-38
  • 2026-09-29_09-53-21
  • 2026-09-28_09-53-06
  • 2026-09-28_09-52-44
  • 2026-09-27_09-52-08
  • 2026-09-27_09-51-49
  • 2026-09-26_09-47-49
  • 2026-09-26_09-47-34
  • 2026-09-25_09-47-42
  • 2026-09-25_09-47-25
  • 2026-09-24_09-53-14
  • 2026-09-24_09-52-54
  • 2026-09-23_09-47-28
  • 2026-09-23_09-47-09
  • 2026-09-22_09-47-47
  • 2026-09-22_09-47-25
  • 2026-09-21_09-41-36
  • 2026-09-21_09-41-18
  • 2026-09-20_09-43-16
  • 2026-09-20_09-42-57
  • 2026-09-19_09-38-27
  • 2026-09-19_09-38-11
  • 2026-09-18_09-44-59
  • 2026-09-18_09-44-42
  • 2026-09-17_09-40-35
  • 2026-09-17_09-40-14
  • 2026-09-16_09-37-44
  • 2026-09-16_09-37-22
  • 2026-09-15_09-39-54
  • 2026-09-15_09-39-44
  • 2026-09-14_09-38-40
  • 2026-09-14_09-38-25
  • 2026-09-13_09-36-33
  • 2026-09-13_09-36-17
  • 2026-09-12_09-39-22
  • 2026-09-12_09-39-10
  • 2026-09-11_09-41-04
  • 2026-09-11_09-40-48
  • 2026-09-10_09-39-10
  • 2026-09-10_09-38-52
  • 2026-09-09_09-42-04
  • 2026-09-09_09-41-43
  • 2026-09-08_09-37-46
  • 2026-09-08_09-37-25
  • 2026-09-07_09-37-10
  • 2026-09-07_09-36-52
  • 2026-09-06_09-33-20
  • 2026-09-06_09-33-02
  • 2026-09-05_09-31-08
  • 2026-09-05_09-30-52
  • 2026-09-04_09-30-52
  • 2026-09-04_09-30-35
  • 2026-09-03_09-30-23
  • 2026-09-03_09-30-10
  • 2026-09-02_09-31-23
  • 2026-09-02_09-31-07
  • 2026-09-01_09-31-48
  • 2026-09-01_09-30-56
  • 2026-08-31_09-35-15
  • 2026-08-31_09-34-56
  • 2026-08-30_09-23-45
  • 2026-08-30_09-23-29
  • 2026-08-29_09-26-19
  • 2026-08-29_09-26-02
  • 2026-08-28_09-30-23
  • 2026-08-28_09-30-13
  • 2026-08-27_09-18-52
  • 2026-08-27_09-18-38
  • 2026-08-25_09-25-10
  • 2026-08-25_09-24-18
  • 2026-08-24_09-21-14
  • 2026-08-24_09-20-20
  • 2026-08-23_09-16-57
  • 2026-08-23_09-16-43
  • 2026-08-22_09-19-35
  • 2026-08-22_09-18-42
  • 2026-08-21_09-13-56
  • 2026-08-21_09-13-04
  • 2026-08-20_09-18-32
  • 2026-08-20_09-17-35
  • 2026-08-19_09-17-03
  • 2026-08-19_09-16-11
  • 2026-08-18_09-11-16
  • 2026-08-18_09-10-23
  • 2026-08-17_09-12-32
  • 2026-08-17_09-12-13
  • 2026-08-16_09-07-09
  • 2026-08-16_09-06-54
  • 2026-08-15_09-21-03
  • 2026-08-15_09-20-49
  • 2026-08-14_09-10-21
  • 2026-08-14_09-10-10
  • 2026-08-13_09-06-26
  • 2026-08-13_09-06-12
  • 2026-08-12_09-06-46
  • 2026-08-12_09-05-55
  • 2026-08-11_09-09-18
  • 2026-08-11_09-08-21
  • 2026-08-10_09-06-42
  • 2026-08-10_09-06-30
  • 2026-08-09_09-03-33
  • 2026-08-09_09-03-14
  • 2026-08-08_09-00-44
  • 2026-08-08_09-00-33
  • 2026-08-07_09-01-19
  • 2026-08-07_09-01-02
  • 2026-08-06_09-01-30
  • 2026-08-06_09-01-13
  • 2026-08-05_09-03-05
  • 2026-08-05_09-02-52
  • 2026-08-04_09-03-10
  • 2026-08-04_09-02-20
  • 2026-08-03_09-01-42
  • 2026-08-03_09-00-51
  • 2026-08-02_08-57-31
  • 2026-08-02_08-57-18
  • 2026-08-01_08-59-59
  • 2026-08-01_08-59-47
  • 2026-07-31_08-59-22
  • 2026-07-31_08-58-30
  • 2026-07-30_08-56-37
  • 2026-07-30_08-56-25
  • 2026-07-29_09-00-22
  • 2026-07-29_08-59-31
  • 2026-07-28_08-58-46
  • 2026-07-28_08-57-58
  • 2026-07-27_08-53-04
  • 2026-07-27_08-52-12
  • 2026-07-26_08-49-56
  • 2026-07-26_08-49-08
  • 2026-07-25_08-51-06
  • 2026-07-25_08-50-19
  • 2026-07-24_08-51-21
  • 2026-07-24_08-50-32
  • 2026-07-23_08-51-04
  • 2026-07-23_08-50-16
  • 2026-07-22_08-52-46
  • 2026-07-22_08-51-58
  • 2026-07-21_08-49-32
  • 2026-07-21_08-48-42
  • 2026-07-20_08-48-35
  • 2026-07-20_08-48-20
  • 2026-07-19_08-49-05
  • 2026-07-19_08-48-54
  • 2026-07-18_08-49-40
  • 2026-07-18_08-49-29
  • 2026-07-17_08-48-32
  • 2026-07-17_08-47-47
  • 2026-07-16_08-23-16
  • 2026-07-16_08-22-31
  • 2026-07-15_08-23-13
  • 2026-07-15_08-22-28
  • 2026-07-14_08-21-21
  • 2026-07-14_08-20-26
  • 2026-07-13_08-23-12
  • 2026-07-13_08-22-27
  • 2026-07-12_08-21-43
  • 2026-07-12_08-20-47
  • 2026-07-11_08-19-58
  • 2026-07-11_08-19-16
  • 2026-07-10_08-19-31
  • 2026-07-10_08-18-36
  • 2026-07-09_08-20-16
  • 2026-07-09_08-19-18
  • 2026-07-08_08-19-03
  • 2026-07-08_08-18-28
  • 2026-07-07_08-19-28
  • 2026-07-07_08-18-27
  • 2026-07-06_08-20-10
  • 2026-07-06_08-19-33
  • 2026-07-05_08-14-40
  • 2026-07-05_08-14-08
  • 2026-07-04_08-14-41
  • 2026-07-04_08-14-04
  • 2026-07-03_08-16-31
  • 2026-07-03_08-15-54
  • 2026-07-02_08-15-12
  • 2026-07-02_08-14-30
  • 2026-07-01_09-01-51
  • 2026-07-01_09-01-33
  • 2026-06-30_09-50-44
  • 2026-06-30_08-58-44
  • 2026-06-29_11-35-39
  • 2026-06-29_09-01-03
  • 2026-06-28_09-32-50
  • 2026-06-28_08-51-12
  • 2026-06-27_09-33-30
  • 2026-06-27_08-51-30
  • 2026-06-27_08-51-08
  • 2026-02-18_07-18-50
  • 2024-03-30_14-18-20

Check the differences between the versions.

Annotations

You must be logged in to add annotations
No annotations yet

Events

Hand-picked events relevant to this call topic.

No events yet

There are currently no events linked to this call topic.

Timeline

Track where this call stands in its lifecycle, from work programme to grant signature, and see what's likely to happen next.

Call published · 30 Sep 2024 (2 years ago)

All expected milestones for this call have passed.

Today

Work programme published

16 Apr 2021 · est.

Call opens

02 Nov 2021

Call closes

16 Feb 2022

Outcome expected

16 Jul 2022 · est.

Grant agreement signed

16 Oct 2022 · est.

Call published

30 Sep 2024

Preparation Open for submission Evaluation Grant preparation Not yet reached
  1. Work programme published Estimated

    16 Apr 2021 · 5 years ago

    Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.

  2. Call opens

    02 Nov 2021 · 4 years ago

    Submissions can be made from this date.

  3. Call closes

    16 Feb 2022 · 4 years ago

    Deadline to submit a proposal.

  4. Outcome expected Estimated

    16 Jul 2022 · 4 years ago

    The maximum time to inform applicants of the evaluation outcome is five months after the call closes.

  5. Grant agreement signed Estimated

    16 Oct 2022 · 3 years ago

    The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.

  6. Call published

    30 Sep 2024 · 2 years ago

    This topic was first published in TopicTree.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal