HORIZON-KDT-JU-2021-2-RIA-Focus-Topic-1

HORIZON-KDT-JU-2021-2-RIA-Focus Topic 1-Processing solutions for AI at the edge addressing the design stack and middleware -

About the connections

The graph above was generated based on the following links

Call text (as on F&T portal)

View on F&T portal

Expected Outcome

Proposal results are expected to contribute to one or more of the following outcomes:

  • Development of European processors/accelerators for secure embedded intelligence supporting inference and machine learning in autonomous intelligent objects and AIoT (Artificial Intelligence of Things) at the edge.
  • Development of platforms and automated tools for HW/SW co-design of edge-AI based systems including non traditional computing paradigms (e.g. neuromorphic).
  • Development of AI software algorithms and/or frameworks and tools for dealing with sparse computing resources for edge-AI based systems.
  • Increased energy efficiency and improved processing capabilities for edge-AI.
  • Support of virtualization concepts at firmware, operating system and middleware layer for vertical applications (e.g. automotive, industry, … )
  • Design for security and reliability to support applications in critical sectors like mobility, healthcare, industry, …

Scope

Proposals need to address:

  • The design of innovative and energy-efficient processing solutions for AI on theedge and deep-edge, with a focus on new processor architectures and middleware.
  • Tools allowing semi-automatic and automatic design space exploration, including variants of algorithms, computing paradigms, hardware performances, energy efficiency, etc.
  • Scalable architecture, use of interposer and chiplets to build chips for various applications (for edge and for embedded HPC applications) with the same family of hardware building blocks with efficient interconnection network, e.g. using photonics.
  • Development of hybrid architectures, integration and cooperation of neuromorphic or other non-conventional computing solutions within classical systems. Supporting design tool chains and OSs addressing multiple computing paradigms
  • Middleware and engineering tools, to reach a trade-off between training cost, power consumption and execution time while supporting virtualization concepts.
  • Advanced memory management
  • Automated transfer-learning, meta-learning, and real-time learning at the edge
  • Secure (i.e. trustworthy and explainable) edge-AI by design.
  • Encouraging SMEs to participate in those developments, in particular paying attention to the needs of SMEs, involve SMEs in project execution, and develop solutions that can be taken up and/or exploited by SMEs
Specific Topic Conditions:

The activities have their centre of gravity at the TRL 4-5 – see Annex 1 of the KDT JU Work Pogramme 2021

News flashes

2022-03-28

The KDT JU Work Programme 2021 has been updated with information about the national eligibility rules for DK (pages 73-74).

2022-03-28

The KDT JU Work Programme 2021 has been updated with information about the national eligibility rules for DK (pages 73-74).

2022-02-24

The KDT JU Work Programme 2021 has been updated with information about the national eligibility rules for PL (page 118).

2022-02-24

The KDT JU Work Programme 2021 has been updated with information about the national eligibility rules for PL (page 118).

2022-02-22

The KDT JU Work Programme 2021 has been updated with information about the national eligibility rules for TR (pages 136-137).

More information for the Swiss applicants interested to participate in KDT Calls 2021 (RIA and IA Actions) is available here:https://www.innosuisse.ch/inno/en/home/promotion-of-international-projects/eu-partnerships/key-digital-technologies.html

2022-02-22

The KDT JU Work Programme 2021 has been updated with information about the national eligibility rules for TR (pages 136-137).

More information for the Swiss applicants interested to participate in KDT Calls 2021 (RIA and IA Actions) is available here:https://www.innosuisse.ch/inno/en/home/promotion-of-international-projects/eu-partnerships/key-digital-technologies.html

2022-01-26

The KDT JU Work Programme 2021 has been updated with information about the national eligibility rules for IT (MUR and MISE) (pages 98-104).

2022-01-26

The KDT JU Work Programme 2021 has been updated with information about the national eligibility rules for IT (MUR and MISE) (pages 98-104).

2022-01-21

The complex funding rates of KDT JU RIAcall 2021 and the limitations of the submission system resulted in the fact that thefunding rates of the large enterprises (for profit not SMEs)are not adequately integrated in the JU/EU Budget table in the Part A. Consequently, these organizations need to calculate their JU/EU Funding asinstructed in the Guide for Applicants(examples for each Call/topic are presented).

Similarly, theNational Budgets/Funding Tableare not anymore integrated into the Part A (as it was the case in the past for the ECSEL JU) and itneeds to be uploaded as a separate xls filein the dedicated place holder in the submission tool. More details/instructions are provided in the Guide for Applicants

The Part C are now named National Part in the submission toolto avoid confusion with the Part C (dynamic forms) used by other programmes. Moredetailsareprovided in the Guide for Applicants

2022-01-21

The complex funding rates of KDT JU RIAcall 2021 and the limitations of the submission system resulted in the fact that thefunding rates of the large enterprises (for profit not SMEs)are not adequately integrated in the JU/EU Budget table in the Part A. Consequently, these organizations need to calculate their JU/EU Funding asinstructed in the Guide for Applicants(examples for each Call/topic are presented).

Similarly, theNational Budgets/Funding Tableare not anymore integrated into the Part A (as it was the case in the past for the ECSEL JU) and itneeds to be uploaded as a separate xls filein the dedicated place holder in the submission tool. More details/instructions are provided in the Guide for Applicants

The Part C are now named National Part in the submission toolto avoid confusion with the Part C (dynamic forms) used by other programmes. Moredetailsareprovided in the Guide for Applicants

2022-01-21

The KDT JU Work Programme 2021 has been updated with information about the national eligibility rules for IT (MUR) (pages 98-101) and ES (MINAETD, AEI) (pages 125-132); a clerical error copy/paste was corrected in the sections “Artificial Intelligence” and “Connectivity” (pages 18 & 33); the national budgets table has been updated for IT(MUR), EL and SE (page 16)

2022-01-21

The KDT JU Work Programme 2021 has been updated with information about the national eligibility rules for IT (MUR) (pages 98-101) and ES (MINAETD, AEI) (pages 125-132); a clerical error copy/paste was corrected in the sections “Artificial Intelligence” and “Connectivity” (pages 18 & 33); the national budgets table has been updated for IT(MUR), EL and SE (page 16)

2022-01-19

The “Guide for Applicants to KDT JU Calls for proposals” and the “Template Model National Budgets Table” are now available

2022-01-19

The “Guide for Applicants to KDT JU Calls for proposals” and the “Template Model National Budgets Table” are now available

2022-01-18
The submission session is now available for: HORIZON-KDT-JU-2021-2-RIA(HORIZON-JU-RIA), HORIZON-KDT-JU-2021-2-RIA-Focus-Topic-1(HORIZON-JU-RIA)
2022-01-12

The KDT JU Work Programme 2021 has been updated with information about the national eligibility rules for PT (page 120) and SE (page 134-136)

2022-01-12

The KDT JU Work Programme 2021 has been updated with information about the national eligibility rules for PT (page 120) and SE (page 134-136)

2021-12-23

The KDT JU Work Programme 2021 has been updated with information about the national eligibility rules for AT (page 60) and LV (page 105-107)

The Model Grant Agreement with the KDT JU specificities is now available in the Call Documents

2021-12-23

The KDT JU Work Programme 2021 has been updated with information about the national eligibility rules for AT (page 60) and LV (page 105-107)

The Model Grant Agreement with the KDT JU specificities is now available in the Call Documents

2021-12-17

The KDT JU Work Programme 2021 has been updated with information about the national eligibility rules (funding rates) for NL (page 110)

2021-12-17

The KDT JU Work Programme 2021 has been updated with information about the national eligibility rules (funding rates) for NL (page 110)

2021-12-16

The KDT JU Work Programme 2021 has been updated with information about the national eligibility rules for CZ (pages 70-71), LV (page 104), NO (page 111-112), ES (pages 121-126) and national budgetary commitments for CZ (page 15) and LV (page 16)

2021-12-16

The KDT JU Work Programme 2021 has been updated with information about the national eligibility rules for CZ (pages 70-71), LV (page 104), NO (page 111-112), ES (pages 121-126) and national budgetary commitments for CZ (page 15) and LV (page 16)

call topic details
Call status: Closed
Opening date: 2022-01-18 (4 years ago)
Closing date: 2022-04-27 (3 years ago)
Procedure: single-stage

Budget: 20,000,000
Expected grants: not specified
News flashes

This call topic has been appended 23 times by the EC with news.

  • 2022-03-28
    the kdt ju work programme 2021 has been...
  • 2022-03-28
    the kdt ju work programme 2021 has been...
  • 2022-02-24
    the kdt ju work programme 2021 has been...
  • 2022-02-24
    the kdt ju work programme 2021 has been...
  • 2022-02-22
    the kdt ju work programme 2021 has been...
  • 2022-02-22
    the kdt ju work programme 2021 has been...
  • 2022-01-26
    the kdt ju work programme 2021 has been...
  • 2022-01-26
    the kdt ju work programme 2021 has been...
  • 2022-01-21
    the complex funding rates of kdt ju ria...
  • 2022-01-21
    the complex funding rates of kdt ju ria...
  • 2022-01-21
    the kdt ju work programme 2021 has been...
  • 2022-01-21
    the kdt ju work programme 2021 has been...
  • 2022-01-19
    the “guide for applicants to kdt j...
  • 2022-01-19
    the “guide for applicants to kdt j...
  • 2022-01-18
    the submission session is now available...
  • 2022-01-12
    the kdt ju work programme 2021 has been...
  • 2022-01-12
    the kdt ju work programme 2021 has been...
  • 2021-12-23
    the kdt ju work programme 2021 has been...
  • 2021-12-23
    the kdt ju work programme 2021 has been...
  • 2021-12-17
    the kdt ju work programme 2021 has been...
  • 2021-12-17
    the kdt ju work programme 2021 has been...
  • 2021-12-16
    the kdt ju work programme 2021 has bee...
  • 2021-12-16
    the kdt ju work programme 2021 has bee...
Call

HORIZON-KDT-JU-2021-2-RIA

Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.

There is 1 other topic in this call:

Source information

Showing the latest information. Found 1 version of this call topic in the F&T portal.

Information from

  • 2024-03-30_14-17-42

Annotations

You must be logged in to add annotations
No annotations yet

Events

This is just a very first implementation, better visualisation coming

Events are added by the ideal-ist NCP community and are hand-picked. If you would like to suggest an event, please contact idealist@ffg.at.

Call topic timeline

What phase of the topic timeline are we in? This timeline contains some suggestions on what are realistic actions you should or could take at this moment. The timeline is based on the information provided by the call topic.
  1. Work programme available

    - 4 years ago

    The call topics are published first in the Work Programme, which is available a while before the call opens. By following up the Work Programme publications, you can get a headstart.

  2. Opening date

    - 4 years ago

    The call opened for submissions.

  3. Closing date

    - 3 years ago

    Deadline for submitting a project.

  4. Time to inform applicants Estimate

    - 3 years ago

    The maximum time to inform applicants (TTI) of the outcome of the evaluation is five months from the call closure date.

  5. Sign grant agreement Estimate

    - 3 years ago

    The maximum time to sign grant agreements (TTG) is three months from the date of informing applicants.

  6. Publication date

    - 1 year ago

    The call was first imported in TopicTree.

  7. Today

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal