HORIZON-CL4-2023-DIGITAL-EMERGING-01-32
Sustainable safe-by-design 2D materials technology (RIA) -
Related topics
Drag to rearrange · hover a topic or connection to preview why it's linked, click to pin that panel open
Connected via , not directly to the current topic
No motivation recorded.
Center graph on this topic →Topics in this graph
-
HORIZON-CL4-2024-DIGITAL-EMERGING-01-31 — Pilot line(s) for 2D materials-based devices (RIA)
This topic is a continuation of the topics under Graphene Flagship from 2023 Digital Emerging calls.
-
HORIZON-CL4-2023-DIGITAL-EMERGING-01-33 — 2D materials of tomorrow (RIA)
Connected via HORIZON-CL4-2024-DIGITAL-EMERGING-01-31, not directly to the current topic.
This topic is a continuation of the topics under Graphene Flagship from 2023 Digital Emerging calls.
Bold node = current topic · node color = call status · hover for details, click to pin · smaller, lighter topics are two steps away
Call text (as on F&T portal)
View on F&T portalExpected Outcome:
Projects are expected to contribute to the following outcomes:
- Development of Safe and Sustainable by Design two-dimensional materials (2DM) technology.
- Societal acceptance of 2DM and 2DM-based technologies.
- A set of robust and verified assays for toxicity and eco-toxicity testing of 2DM, to support regulatory requirements for their registration and authorisation for use (OECD test guidelines[1], REACH compliance, authorisation pathways[2])
Scope:
The increasing commercial exploitation of 2DM necessitates a comprehensive evaluation of their potential impact on human health and the environment. It is thus of utmost importance for 2DM technology development to understand the properties that underlie the potential toxicity of these materials. Since not all 2DMs are alike, it is essential to disentangle the structure-activity relationships for this class of materials.
Proposals should aim to ensure a safe development of 2DM technology and in the long term, a sustainable market entry/penetration of 2DM-based products. Proposals should comply with the Safe and Sustainable by Design framework[3] and criteria.
Multidisciplinary research and innovation activities should address all of the following:
- Critical examination of 2DM health and environment issues, ranging from general toxicology, to occupational health and environmental impact.
- Studies and tests of biocompatibility and safety of 2DMs and composites along their life cycle;
- Development of solutions to modulate potential risks by developing appropriate chemical/physical approaches towards safer manufactured materials and nanomaterials (safe-by-design 2DMs).
- Assessing the safety of 2DMs and composites at different TRL levels to develop and test best practices along the product development process, from prototypes to products tested in relevant environments in order to guarantee the highest impact possible.
- Development of validation processes supporting regulatory assessment.
Proposals submitted under this topic should include an exploitation strategy, as outlined in the introduction to this Destination.
Research should build on existing standards or contribute to standardisation. Interoperability for data sharing should be addressed.
Proposals should build on or seek collaboration with existing projects and develop synergies with other relevant European, national or regional initiatives, funding programmes and platforms. In particular projects are expected to develop synergies and relate to activities and outcomes of the projects selected under the other topics of ‘Graphene and 2D materials: Europe in the lead’ and where relevant of HORIZON-CL4-2023-RESILIENCE-01-21/22/23/24.
Proposals should also cover the contribution to the governance and overall coordination of the Graphene Flagship initiative.
Proposals should indicate which chapters of the Strategic Research and Innovation Plan for chemicals and materials they will contribute to.
Proposals should consider involving, directly or indirectly, appropriate expertise in other disciplines, for example in SSH disciplines, where relevant to achieve wider societal acceptance of 2DM-based technologies.
null
Activities are expected to start at TRL 2-3 and achieve TRL 4-5 by the end of the project – see General Annex B.
[1] https://www.oecd.org/chemicalsafety/testing/oecd-guidelines-testing-chemicals-related-documents.htm
[2] https://echa.europa.eu/en/regulations/reach/registration
[3] See documents defining the SSbD framework and criteria on: https://ec.europa.eu/info/research-and-innovation/research-area/industrial-research-and-innovation/key-enabling-technologies/advanced-materials-and-chemicals_en
News flashes
EVALUATION results
Published: 07/12/2022
Deadline: 29/03/2023
Available budget: EUR 129 000 000
The results of the evaluation are as follows:
Number of proposals submitted (including proposals transferred from or to other calls): 97
Number of inadmissible proposals: 0
Number of ineligible proposals: 1
Number of above-threshold proposals: 75
Total budget requested for above-threshold proposals: EUR 316,536,982.98
We recently informed the applicants about the evaluation results for their proposals.
For questions, please contact the Research Enquiry Service.
EVALUATION results
Published: 07/12/2022
Deadline: 29/03/2023
Available budget: EUR 129 000 000
The results of the evaluation are as follows:
Number of proposals submitted (including proposals transferred from or to other calls): 97
Number of inadmissible proposals: 0
Number of ineligible proposals: 1
Number of above-threshold proposals: 75
Total budget requested for above-threshold proposals: EUR 316,536,982.98
We recently informed the applicants about the evaluation results for their proposals.
For questions, please contact the Research Enquiry Service.
Call HORIZON-CL4-2023-DIGITAL-EMERGING-01-CNECT has closed on the 29 March 2023.
97 proposals have been submitted.
The breakdown per topic is:
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-02: 11 proposals
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-11: 36 proposals
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-32: 4 proposals
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-33: 16 proposals
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-40: 9 proposals
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-41: 5 proposals
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-43: 2 proposals
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-50: 10 proposals
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-56: 4 proposals
Evaluation results are expected to be communicated in July 2023.
Call HORIZON-CL4-2023-DIGITAL-EMERGING-01-CNECT has closed on the 29 March 2023.
97 proposals have been submitted.
The breakdown per topic is:
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-02: 11 proposals
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-11: 36 proposals
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-32: 4 proposals
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-33: 16 proposals
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-40: 9 proposals
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-41: 5 proposals
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-43: 2 proposals
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-50: 10 proposals
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-56: 4 proposals
Evaluation results are expected to be communicated in July 2023.
Following the Council Implementing Decision (EU) 2022/2506, as of 16th December 2022, no legal commitments (including the grant agreement itself as well as subcontracts, purchase contracts, financial support to third parties etc.) can be signed with Hungarian public interest trusts established under Hungarian Act IX of 2021 or any entity they maintain.
Affected entities may continue to apply to calls for proposals. However, in case the Council measures are not lifted, such entities are not eligible to participate in any funded role (beneficiaries, affiliated entities, subcontractors, recipients of financial support to third parties). In this case, co-applicants will be invited to remove or replace that entity /or to change its status into associated partner. Tasks and budget may be redistributed accordingly.
Following the Council Implementing Decision (EU) 2022/2506, as of 16th December 2022, no legal commitments (including the grant agreement itself as well as subcontracts, purchase contracts, financial support to third parties etc.) can be signed with Hungarian public interest trusts established under Hungarian Act IX of 2021 or any entity they maintain.
Affected entities may continue to apply to calls for proposals. However, in case the Council measures are not lifted, such entities are not eligible to participate in any funded role (beneficiaries, affiliated entities, subcontractors, recipients of financial support to third parties). In this case, co-applicants will be invited to remove or replace that entity /or to change its status into associated partner. Tasks and budget may be redistributed accordingly.
Dear applicant,
We would like to draw your attention to an update of the “Detailed Budget Table” Excel template. A new template has been republished for your kind consideration and use.
An additional paragraph has been added to the instructions tab, explaining how to save the detailed budget table and how to upload it in the submission system.
The following instructions have been added:
“After you completed this Excel workbook, you must also complete the table ‘Budget for the proposal’ in Part A of the proposal, entering the requested EU contribution for each participant. Fill the Part A budget table using the total for each participant from the sheet ‘Lump sum breakdown’ in this Excel workbook.
The format of this Excel workbook is .xlsm because it uses macros to generate sheets and make calculations automatically. Always save it as .xlsm.However, this format cannot be uploaded to the submission system for security reasons.Therefore, to submit the completed workbook, save a copy as an .xlsx or .xls document (and not as .xlsm) and upload it to the proposal submission tool at Step 5 of the submission process. Always keep a copy of the original .xlsm file.To save the workbook as .xlsx document, use the action button in the sheet “Instructions”. Alternatively, click on “File” and then “Save as”; in the “Save as” dialog box, choose “.xlsx” or “.xls” from the “Save as type” dropdown list.”
You can still use the template initially available in the submission system if you wish to, but please be aware of the instructions on how to upload and save the file.
Dear applicant,
We would like to draw your attention to an update of the “Detailed Budget Table” Excel template. A new template has been republished for your kind consideration and use.
An additional paragraph has been added to the instructions tab, explaining how to save the detailed budget table and how to upload it in the submission system.
The following instructions have been added:
“After you completed this Excel workbook, you must also complete the table ‘Budget for the proposal’ in Part A of the proposal, entering the requested EU contribution for each participant. Fill the Part A budget table using the total for each participant from the sheet ‘Lump sum breakdown’ in this Excel workbook.
The format of this Excel workbook is .xlsm because it uses macros to generate sheets and make calculations automatically. Always save it as .xlsm.However, this format cannot be uploaded to the submission system for security reasons.Therefore, to submit the completed workbook, save a copy as an .xlsx or .xls document (and not as .xlsm) and upload it to the proposal submission tool at Step 5 of the submission process. Always keep a copy of the original .xlsm file.To save the workbook as .xlsx document, use the action button in the sheet “Instructions”. Alternatively, click on “File” and then “Save as”; in the “Save as” dialog box, choose “.xlsx” or “.xls” from the “Save as type” dropdown list.”
You can still use the template initially available in the submission system if you wish to, but please be aware of the instructions on how to upload and save the file.
Opening date: 2022-12-08 (3 years ago)
Closing date: 2023-03-29 (3 years ago)
Procedure: single-stage
Budget: 6,000,000
Expected grants: 2
Contribution: 3,000,000 - 5,000,000
This call topic has been appended 10 times by the EC with news.
-
2023-07-31
 evaluation resultspublished: 07/12... -
2023-07-31
 evaluation resultspublished: 07/12... -
2023-03-31
call horizon-cl4-2023-digital-emerging-0... -
2023-03-31
call horizon-cl4-2023-digital-emerging-0... -
2023-03-21
following the council implementing... -
2023-03-21
following the council implementing... -
2023-01-24
 dear applicant, we would like... -
2023-01-24
 dear applicant, we would like... -
2022-12-08
the submission session is now available... -
2022-12-08
the submission session is now available...
HORIZON-CL4-2023-DIGITAL-EMERGING-01-CNECT
Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.
There are 8 other topics in this call:
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-02
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-11
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-33
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-40
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-41
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-43
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-50
- HORIZON-CL4-2023-DIGITAL-EMERGING-01-56
Showing the latest information. Found 204 versions of this call topic in the F&T portal.
Information from
- 2026-10-08_08-36-46
- 2026-10-08_08-36-45
- 2026-10-07_08-37-01
- 2026-10-07_08-32-18
- 2026-10-06_08-33-55
- 2026-10-06_08-33-53
- 2026-10-05_08-34-41
- 2026-10-05_08-30-09
- 2026-10-04_08-31-07
- 2026-10-04_08-30-48
- 2026-10-03_08-29-41
- 2026-10-03_08-29-39
- 2026-10-02_08-31-08
- 2026-10-02_08-31-06
- 2026-10-01_08-33-25
- 2026-10-01_08-33-24
- 2026-09-29_09-08-19
- 2026-09-29_09-08-17
- 2026-09-28_09-07-48
- 2026-09-28_09-07-44
- 2026-09-27_09-07-18
- 2026-09-27_09-07-16
- 2026-09-26_09-03-32
- 2026-09-26_09-03-30
- 2026-09-25_09-04-32
- 2026-09-25_09-04-31
- 2026-09-24_09-08-07
- 2026-09-24_09-08-05
- 2026-09-23_09-01-47
- 2026-09-23_09-01-45
- 2026-09-22_09-02-25
- 2026-09-22_09-02-23
- 2026-09-21_08-58-18
- 2026-09-21_08-58-17
- 2026-09-20_08-59-45
- 2026-09-20_08-59-42
- 2026-09-19_08-56-00
- 2026-09-19_08-55-57
- 2026-09-18_09-02-02
- 2026-09-18_09-01-59
- 2026-09-17_08-56-44
- 2026-09-17_08-56-43
- 2026-09-16_08-54-20
- 2026-09-16_08-54-18
- 2026-09-15_08-56-44
- 2026-09-15_08-56-43
- 2026-09-14_08-55-40
- 2026-09-14_08-55-39
- 2026-09-13_08-53-52
- 2026-09-13_08-53-51
- 2026-09-12_08-57-16
- 2026-09-12_08-57-15
- 2026-09-11_08-56-05
- 2026-09-11_08-56-04
- 2026-09-10_08-55-12
- 2026-09-10_08-55-10
- 2026-09-09_08-56-07
- 2026-09-09_08-56-05
- 2026-09-08_08-53-25
- 2026-09-08_08-53-24
- 2026-09-07_08-53-36
- 2026-09-07_08-53-33
- 2026-09-06_08-52-04
- 2026-09-06_08-52-03
- 2026-09-05_08-50-15
- 2026-09-05_08-50-13
- 2026-09-04_08-48-59
- 2026-09-04_08-48-58
- 2026-09-03_08-48-33
- 2026-09-03_08-48-31
- 2026-09-02_08-50-00
- 2026-09-02_08-49-58
- 2026-09-01_08-49-55
- 2026-09-01_08-49-49
- 2026-08-31_08-53-20
- 2026-08-31_08-53-19
- 2026-08-30_08-42-40
- 2026-08-30_08-42-35
- 2026-08-29_08-45-35
- 2026-08-29_08-45-32
- 2026-08-28_08-49-55
- 2026-08-27_08-38-27
- 2026-08-25_08-44-28
- 2026-08-25_08-44-27
- 2026-08-24_08-40-03
- 2026-08-24_08-40-01
- 2026-08-23_08-37-20
- 2026-08-23_08-37-19
- 2026-08-22_08-38-44
- 2026-08-22_08-38-43
- 2026-08-21_08-32-38
- 2026-08-21_08-32-36
- 2026-08-20_08-37-44
- 2026-08-20_08-37-42
- 2026-08-19_08-36-10
- 2026-08-19_08-36-09
- 2026-08-18_08-30-58
- 2026-08-18_08-30-54
- 2026-08-17_08-32-27
- 2026-08-17_08-32-26
- 2026-08-16_08-26-53
- 2026-08-16_08-26-50
- 2026-08-15_08-42-04
- 2026-08-15_08-42-03
- 2026-08-14_08-30-28
- 2026-08-14_08-30-24
- 2026-08-13_08-26-47
- 2026-08-13_08-26-46
- 2026-08-12_08-26-15
- 2026-08-12_08-26-12
- 2026-08-11_08-28-36
- 2026-08-11_08-28-35
- 2026-08-10_08-26-02
- 2026-08-10_08-25-58
- 2026-08-09_08-24-06
- 2026-08-09_08-24-04
- 2026-08-08_08-21-54
- 2026-08-08_08-21-51
- 2026-08-07_08-21-20
- 2026-08-07_08-21-15
- 2026-08-06_08-21-56
- 2026-08-06_08-21-55
- 2026-08-05_08-23-43
- 2026-08-05_08-23-39
- 2026-08-04_08-23-49
- 2026-08-04_08-23-48
- 2026-08-03_08-21-50
- 2026-08-03_08-21-48
- 2026-08-02_08-19-57
- 2026-08-02_08-19-56
- 2026-08-01_08-21-39
- 2026-08-01_08-21-38
- 2026-07-31_08-20-01
- 2026-07-31_08-19-59
- 2026-07-30_08-18-26
- 2026-07-30_08-18-25
- 2026-07-29_08-20-18
- 2026-07-29_08-20-17
- 2026-07-28_08-19-34
- 2026-07-28_08-19-33
- 2026-07-27_08-14-00
- 2026-07-27_08-13-59
- 2026-07-26_08-11-38
- 2026-07-26_08-11-37
- 2026-07-25_08-12-11
- 2026-07-25_08-12-09
- 2026-07-24_08-12-48
- 2026-07-24_08-12-47
- 2026-07-23_08-12-40
- 2026-07-23_08-12-39
- 2026-07-22_08-14-17
- 2026-07-22_08-14-15
- 2026-07-21_08-10-55
- 2026-07-21_08-10-53
- 2026-07-20_08-11-06
- 2026-07-20_08-11-05
- 2026-07-19_08-11-37
- 2026-07-19_08-11-36
- 2026-07-18_08-11-34
- 2026-07-18_08-11-33
- 2026-07-17_08-10-45
- 2026-07-17_08-10-44
- 2026-07-16_07-50-25
- 2026-07-16_07-50-24
- 2026-07-15_07-50-10
- 2026-07-15_07-50-09
- 2026-07-14_07-48-46
- 2026-07-13_07-49-45
- 2026-07-13_07-49-45
- 2026-07-12_07-49-05
- 2026-07-12_07-49-04
- 2026-07-11_07-47-44
- 2026-07-11_07-47-43
- 2026-07-10_07-47-52
- 2026-07-10_07-47-51
- 2026-07-09_07-48-00
- 2026-07-09_07-47-59
- 2026-07-08_07-47-38
- 2026-07-08_07-47-37
- 2026-07-07_07-47-18
- 2026-07-06_07-48-05
- 2026-07-06_07-48-05
- 2026-07-05_07-44-00
- 2026-07-05_07-43-59
- 2026-07-04_07-45-34
- 2026-07-04_07-45-33
- 2026-07-03_07-45-36
- 2026-07-03_07-45-35
- 2026-07-02_07-44-25
- 2026-07-02_07-44-24
- 2026-07-01_08-16-08
- 2026-07-01_08-12-27
- 2026-06-30_09-49-42
- 2026-06-30_08-11-12
- 2026-06-29_11-35-27
- 2026-06-29_08-14-28
- 2026-06-28_09-32-40
- 2026-06-28_08-06-12
- 2026-06-27_09-33-20
- 2026-06-27_08-06-49
- 2026-06-27_08-04-31
- 2026-02-19_07-05-55
- 2025-06-07_03-33-50
- 2024-03-31_11-13-31
Check the differences between the versions.
Annotations
Events
Hand-picked events relevant to this call topic.
No events yet
There are currently no events linked to this call topic.
Timeline
Call published · 30 Sep 2024 (2 years ago)
All expected milestones for this call have passed.
Work programme published
07 Oct 2022 · est.
Call opens
08 Dec 2022
Call closes
29 Mar 2023
Outcome expected
29 Aug 2023 · est.
Grant agreement signed
29 Nov 2023 · est.
Call published
30 Sep 2024
-
Work programme published Estimated
07 Oct 2022 · 4 years ago
Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.
-
Call opens
08 Dec 2022 · 3 years ago
Submissions can be made from this date.
-
Call closes
29 Mar 2023 · 3 years ago
Deadline to submit a proposal.
-
Outcome expected Estimated
29 Aug 2023 · 3 years ago
The maximum time to inform applicants of the evaluation outcome is five months after the call closes.
-
Grant agreement signed Estimated
29 Nov 2023 · 2 years ago
The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.
-
Call published
30 Sep 2024 · 2 years ago
This topic was first published in TopicTree.
Funded Projects
Loading...
Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)
Ecosystem bubbles
This call topic is part of the following thematic bubbles.