Expected Outcome:

The main outcome will be the availability of core technologies, architectures and protocols that can be indistinctly used for terrestrial or non-terrestrial networks for the provision of seamless services across an access and network fabric continuum overcoming the distinction between satellite and terrestrial access with seamless roaming capabilities between the two segments (beyond Hybrid network). It targets:

  • Architectures and technologies requiring a very tight cooperation between the SNO and the MNO’s, towards a seamless TN-NTN communication continuum, and catering for a multiplicity of possible business models across the various domains.
  • End to end service capabilities either through a TN segment or through an NTN segment, depending on relevant parameters including coverage, RT or NRT constraints, bandwidth and sustainability aspects.
  • Innovative models such as managed multi tenancy of the space segment.
  • Independent reconfiguration of the NTN part for performance, security and resilience optimisation.
  • Compatibility with the most innovative use cases and their demanding requirements such as high rate Direct to Device, PPDR and other NTN specific use cases.
  • Adaptability of the technologies, protocols and architecture (or a subset of those) to non-satellite scenarios such as drones or other flying 3D nodes.

The proposed Topic should cover R&I issues for low and medium TRL topics and plan, towards the end of the SNS implementation (i.e. later work programmes), for demonstration of critical technologies and applicability to specific use cases, e.g. with ESA partnership or national initiatives where possible, possibly using low-cost demonstrators such as Cubesat or equivalent EU offers.

Objective:

Please refer to the "Specific Challenges and Objectives" section for Stream B-03 in the Work Programme, available under ‘Topic Conditions and Documents - Additional Documents’.

Scope:

The scope of this topic focuses on the following areas:

  • Management of multiple access networks through unified Control Plane capable of optimizing TN-NTN service provision according to traffic related parameters (QoS level, bandwidth, sustainability, latency, storage requirements...) and related RAN management, also accounting for very demanding use-case scenarios including public safety use-cases (e.g. PPDR) and system relying exclusively on satcom connectivity like aeronautic use cases.
  • Management capabilities for independent reconfiguration of the NTN part for performance, security and resilience optimisation at system and subsystem level.
  • Dynamic routing in multi-dimensional networks with selection of optimal paths for traffic, which is a key feature in leveraging the potential of NTN-TN unification and integration including optical links, improving (transport and mobility) protocols, flexible topology and traffic routing across such dynamic topologies with long-propagation link characteristics. For what concerns optical links (ISL) the approach is to consider them at system level characteristics and performance properties. However, development of specific technologies/subsystems for ISL is not in scope.
  • Extension of a reference multi orbit constellation system(s) as evaluation framework for the assessment of routing and mobility schemes including various architectural splits. It should cover robustness of the scheme for disaster situation when TN is not available. The reference system may also address feasibility of the constellation considering spectrum usage from existing systems.
  • Spectrum issues including i) novel schemes for dynamic spectrum access and sharing in FR3 (7 – 15 GHz possibly extended up to 24 GHz), providing good cost-coverage trade-off; ii) where applicable dynamic reuse of TN frequencies for NTN use where TN spectrum is not assigned or for very demanding scenarios including public safety use-cases.
  • Multi tenancy and end to end resource slicing capabilities across multiple tenants, covering the space resources and including seamless mobility and handover between various segment, either TN to NTN or across 2 NTN infrastructures.
  • Adaptability and versatility of the scheme to cover also non satellite 3D connected nodes and early system concepts (to be developed in subsequent phases) to provide GNSS free positioning with a better positioning accuracy/availability.

Notes: i) Specific satellite technologies such as advanced payloads and multi satellite generated antenna are not in scope from an in-depth R&I perspective. Their characteristics may be considered at system level where appropriate, but their detailed development is not part of the SNS JU WP objectives, ii) satellite architectures with different levels of data processing (e.g. transparent or regenerative space segments) are in scope.

Applicants should clearly identify the areas/priorities they address in case they only cover a subset.

News flashes

2026-05-13

PROPOSAL NUMBERS

Call HORIZON-JU-SNS-2025-01 has closed on the 18 September 2025 at 17.00.00

147 proposals have been submitted.

The breakdown per topic is:

  • HORIZON-JU-SNS-2025-01-STREAM-B-01-01: 46 proposals
  • HORIZON-JU-SNS-2025-01-STREAM-B-01-02: 28 proposals
  • HORIZON-JU-SNS-2025-01-STREAM-B-02: 30 proposals
  • HORIZON-JU-SNS-2025-01-STREAM-B-03-01: 6 proposals
  • HORIZON-JU-SNS-2025-01-STREAM-B-03-02: 6 proposals
  • HORIZON-JU-SNS-2025-01-STREAM-B-04-01: 11 proposals
  • HORIZON-JU-SNS-2025-01-STREAM-B-04-02: 13 proposals
  • HORIZON-JU-SNS-2025-01-STREAM-B-05: 4 proposals
  • HORIZON-JU-SNS-2025-01-STREAM-C-01: 3 proposals

Evaluation results are expected to be communicated in January 2026

2026-05-13
The submission session is now available for: HORIZON-JU-SNS-2025-01-STREAM-B-04-01, HORIZON-JU-SNS-2025-01-STREAM-B-01-02, HORIZON-JU-SNS-2025-01-STREAM-B-03-01, HORIZON-JU-SNS-2025-01-STREAM-C-01, HORIZON-JU-SNS-2025-01-STREAM-B-05, HORIZON-JU-SNS-2025-01-STREAM-B-03-02, HORIZON-JU-SNS-2025-01-STREAM-B-01-01, HORIZON-JU-SNS-2025-01-STREAM-B-02, HORIZON-JU-SNS-2025-01-STREAM-B-04-02
call topic details
Call status: Closed
Opening date: 2025-05-22 (11 months ago)
Closing date: 2025-09-18 (7 months ago)
Procedure: single-stage

Budget: 8,000,000
Expected grants: 1
Contribution: 8,000,000 - 8,000,000
News flashes

This call topic has been appended 2 times by the EC with news.

  • 2026-05-13
    proposal numberscall horizon-ju-sns-2025...
  • 2026-05-13
    the submission session is now available...
Call

HORIZON-JU-SNS-2025-01

Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.

There are 8 other topics in this call:

Source information

Showing the latest information. Found 11 versions of this call topic in the F&T portal.

Information from

  • 2026-03-14_06-39-05
  • 2025-10-28_15-47-09
  • 2025-07-02_03-30-52
  • 2025-07-01_03-30-48
  • 2025-06-18_03-30-42
  • 2025-05-23_03-30-19
  • 2025-05-20_03-30-17
  • 2025-04-30_03-30-33
  • 2025-04-25_03-30-25
  • 2025-04-17_03-30-22
  • 2025-04-15_03-30-09

Check the differences between the versions.

Annotations

You must be logged in to add annotations
No annotations yet

Events

This is just a very first implementation, better visualisation coming

Events are added by the ideal-ist NCP community and are hand-picked. If you would like to suggest an event, please contact idealist@ffg.at.

Call topic timeline

What phase of the topic timeline are we in? This timeline contains some suggestions on what are realistic actions you should or could take at this moment. The timeline is based on the information provided by the call topic.
  1. Work programme available

    - 1 year ago

    The call topics are published first in the Work Programme, which is available a while before the call opens. By following up the Work Programme publications, you can get a headstart.

  2. Publication date

    - 1 year ago

    The call was first imported in TopicTree.

  3. Opening date

    - 11 months ago

    The call opened for submissions.

  4. Closing date

    - 7 months ago

    Deadline for submitting a project.

  5. Time to inform applicants Estimate

    - 2 months ago

    The maximum time to inform applicants (TTI) of the outcome of the evaluation is five months from the call closure date.

  6. Today

  7. Sign grant agreement Estimate

    - 4 days from now

    The maximum time to sign grant agreements (TTG) is three months from the date of informing applicants.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Bubbles

This call topic is part of:

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal