HORIZON-JU-EUROHPC-2026-NQKD-12-01

Next-Generation QKD Systems -

About the connections

The graph above was generated based on the following links

Call text (as on F&T portal)

View on F&T portal

Expected Outcome:

This action will strengthen Europe's strategic autonomy in quantum-secure communications by advancing core QKD technologies and integration capabilities. Expected results include:

  • Development and demonstration of next-generation QKD systems, with a focus on cost-effectiveness and integration, with specific measurable improvements in one of the following parameters or features: (i) key rate (>1 Mbps over metropolitan distances), (ii) operational coverage of a network at the regional scale, >300 km for fibre-based QKD, including e.g. twin field and free-space links also for non-wired segments and for redundancy, (iii) development and demonstration of advanced quantum cryptographic protocols beyond QKD with provable security advantage over classical cryptographic systems. Implementation of hybrid quantum-classical cryptographic frameworks combining QKD and post-quantum cryptography (PQC), tested on clearly defined real-world applications.
  • Integration of quantum communication components with network equipment and orchestration systems (e.g., software-defined networking).
  • Validation of QKD-based security in high-priority use cases beyond EuroQCI infrastructure, including:
    • Critical infrastructure monitoring (e.g., energy grid telemetry),
    • Long-term secure cloud storage,
    • Industrial control systems (e.g., transport, manufacturing),
    • Secure multi-site enterprise communications.
  • Strengthened European supply chain through the development of certifiable, standardised, and scalable QKD components.
  • This action must address at least two core technical roadblocks defined in the SRIA 2030 for quantum-secure communication. These include scalability challenges in next-generation QKD protocols (e.g. MDI-QKD, DI-QKD) and the integration of QKD with PQC. Proposals are also encouraged to target at least one functionality beyond QKD in prepare-and-measure and one in entanglement-based scenarios, as identified for future quantum networks in the SRIA 2030.

Scope:

The action should support applied R&D in advanced QKD systems and their integration into future secure communication networks, avoiding overlap with EuroQCI deployment efforts. Proposals must include:

  • Development and experimental validation of advanced QKD protocols and systems such as:
    • Continuons-variable QKD (CV-QKD),
    • Measurement-device-independent or device-independent QKD,
    • Twin-field QKD (TF-QKD),
  • Design and implementation of QKD integration into classical and optical networking infrastructure:
    • Compatibility with existing network equipment (e.g., routers, switches),
    • Interface development for SDN/NFV orchestration platforms,
    • Secure key management compatible with enterprise-grade services.
  • Demonstration of hybrid QKD-PQC frameworks in at least two realistic and demanding use cases, with demonstrable benefits over classical-only solutions.
  • In addition to the QKD-focused activities, the action may also address research and first-demonstration efforts on novel quantum communication protocols beyond QKD. This includes the design, feasibility analysis, and early experimental validation of quantum primitives for security and trust in distributed and decentralized settings. These efforts should explore the implications of such protocols on future hardware and architectural choices and contribute to the long-term vision of quantum networks, as defined in the SRIA 2030.
  • Validation of security performance through well-defined benchmarks and verification methods supporting the outcomes from EU quantum certification projects.
  • Development of interoperable, scalable, and certifiable QKD hardware and software components (e.g., quantum random number generators, integrated photonic QKD components, single photon detectors, network controllers) supporting certification, in coordination with other specific EU programs, such as Euro-QCI..
  • Provision of cloud-accessible interfaces to QKD resources to facilitate remote experimentation and integration testing.
  • Establishment of at least one demonstrator involving end-users in a live operational setting, with KPIs for availability, key rate, and resilience under different network conditions.
  • Contribution to standards and certification activities to support widespread adoption and regulatory compliance.
  • Engagement with industry and national network operators to ensure compatibility with telecom-grade requirements and avoid duplication with EuroQCI infrastructures, focusing instead on advancing the technology readiness of next-generation systems.

This action should build on the results of the QSNP Framework Partnership Agreement and align with the SRIA 2030, the Quantum Europe Strategy and EuroQCI, targeting technology readiness and practical deployment pathways for quantum-secure communications.

Technology Readiness Level - Technology readiness level expected from completed projects

The rules are described in General Annex B of the Horizon Europe Work Programme 2026-2027. Activities are expected to start at TRL 4 and to achieve TRL 7 by the end of the project.

News flashes

2026-09-05
The submission session is now available for: HORIZON-JU-EUROHPC-2026-NQKD-12-01
call topic details
Call status: Open
Opening date: 2026-08-13 (3 weeks ago)
Closing date: 2026-11-17 (2 months from now)
Procedure: single-stage

Budget: 24,000,000
Expected grants: 1
Contribution: 21,000,000 - 24,000,000
News flashes

This call topic has been appended 1 time by the EC with news.

  • 2026-09-05
    the submission session is now available...
Call

HORIZON-JU-EUROHPC-2026-NQKD-12

Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.

There are 0 other topics in this call:

Source information

Showing the latest information. Found 1 version of this call topic in the F&T portal.

Information from

  • 2026-08-14_06-34-10

Annotations

You must be logged in to add annotations
No annotations yet

Events

This is just a very first implementation, better visualisation coming

Events are added by the ideal-ist NCP community and are hand-picked. If you would like to suggest an event, please contact idealist@ffg.at.

Call topic timeline

What phase of the topic timeline are we in? This timeline contains some suggestions on what are realistic actions you should or could take at this moment. The timeline is based on the information provided by the call topic.
  1. Work programme available

    - 2 months ago

    The call topics are published first in the Work Programme, which is available a while before the call opens. By following up the Work Programme publications, you can get a headstart.

  2. Opening date

    - 3 weeks ago

    The call opened for submissions.

  3. Publication date

    - 3 weeks ago

    The call was first imported in TopicTree.

  4. Today

  5. Closing date

    - 2 months from now

    Deadline for submitting a project.

  6. Time to inform applicants Estimate

    - 7 months from now

    The maximum time to inform applicants (TTI) of the outcome of the evaluation is five months from the call closure date.

  7. Sign grant agreement Estimate

    - 10 months from now

    The maximum time to sign grant agreements (TTG) is three months from the date of informing applicants.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Bubbles

This call topic is part of:

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal