ICT-02-2016

Thin, Organic and Large Area Electronics -

Related topics

Drag to rearrange · hover a topic or connection to preview why it's linked, click to pin that panel open

Topics in this graph

Bold node = current topic · node color = call status · hover for details, click to pin · smaller, lighter topics are two steps away

Call text (as on F&T portal)

View on F&T portal
Specific Challenge:

Thin, Organic and Large Area Electronics (TOLAE) is an emerging technology with high growth potential, well suited for applications that need large area and/or flexibility or stretchability. To be able to fully benefit from the opportunities brought by this technology and widen the scope of its applications, improvements are sought on features such as reliability, manufacturability and performance. The main challenge is to develop and also demonstrate prototypes of innovative TOLAE-enabled solutions with the above characteristics. This can be addressed in two complementing ways, hybrid integration bringing new opportunities for traditional electronics on flexible substrates and improving readiness of TOLAE technologies for use in dedicated applications.

Scope

a. Research and Innovation Actions

Advancing the readiness of TOLAE technologies and/or hybrid integration for use in applications.

Actions will address the development of advanced materials, technologies and scalable manufacturing processes (ranging from vacuum deposition to printing under ambient conditions) and/or the hybrid integration of micro/nano-electronics (including thin silicon) and photonics components. Focus is on conformable, flexible or stretchable substrates (such as paper, plastic, metal foil, glass or textile). The goal is to have reliable TOLAE-enabled devices with more functionality, better performance and longer lifetime that are ready for use in applications with high growth or high volume potential.

Actions may include related work on design and modelling tools in particular addressing variability issues in printing, interfacing of hybrid integration and reliability. Work could also address specific needs for textile electronics.

Actions should demonstrate strong industrial and user commitment, be driven by user requirements and include validation of the results for the chosen applications. They should include standardisation and address the value chain, as appropriate.

The Commission considers that proposals requesting a contribution from the EU of between EUR 2 and 4 million would allow this area to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.

b. Innovation Actions

Proposals should cover one or both of the following themes:

  • Set-up and validation of pilot line for Hybrid Systems

The objective of the pilot line is to provide design and development services in particular for SMEs. Focus is on manufacturing of Hybrid Systems where conventional micro-/nano-electronics and photonic components are integrated on flexible substrates. The action should be driven by stakeholders able to set-up and run the pilot line. Proposals should describe the business cases and exploitation strategy for the industrialisation of the pilot line and the pilot line should be open access by offering services to external users under fair conditions. There should be a strong commitment to manufacturing in Europe. The pilot line could make use of existing (research or industrial) pilot lines.

  • Demonstration of TOLAE-enabled product prototypes

The objective is to develop and demonstrate innovative product prototypes enabled by TOLAE technologies in automotive, healthcare, smart packaging and buildings[1]. Proposals may include small scale pilot manufacturing.

The action should build a dedicated innovation value chain (preferably covering the full value chain).

The action should target medium- to high-volume markets, be driven by concrete business cases and address user needs. They should include exploitation strategies for the targeted products with strong commitment to industrialise and manufacture them in Europe.

The Commission considers that proposals requesting a contribution from the EU of between EUR 2 and 8 million would allow this area to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts. In case of proposals covering one theme, one action for each theme will be selected.

Expected Impact:

Proposals should describe how the proposed work will contribute to one or more of the following impact criteria, as appropriate, and provide metrics, the baseline and targets to measure impact.

a. Research and Innovation Actions

  • Increased readiness of TOLAE technologies, in particular on functionality, performance, manufacturability and reliability, and wider exploitation of TOLAE in concrete applications with high-growth or high volume potential;
  • Improved business opportunities and value creation in Europe by strengthening cooperation along the value chain.

b. Innovation Actions

  • Fabrication of reliable hybrid systems with short time-to-market and higher investment in advanced manufacturing capabilities;
  • Market introduction of innovative and competitive TOLAE-enabled products targeting medium- to high-volume applications in automotive, healthcare, smart packaging and buildings;
  • Industrial leadership in TOLAE technology, improved business opportunities in Europe and strengthening Europe's position in growing market segments.
Cross-cutting Priorities:

Open Innovation

[1]Demonstration of wearable solutions for healthcare and well-being are addressed under topic IoT-01 Large Scale Pilots.

News flashes

2017-08-11

An overview of the evaluation results (called 'CallFlash Info') of the topics of the H2020-ICT_2017-1call is now available under the section Topic conditions and documents - additional documents of each relevant topic.

2017-08-11

An overview of the evaluation results (called 'Flash Call Info') of the topics of the H2020-ICT_2017-1call is now available here

2017-05-22
The submission session is now available for: ICT-42-2017(FPA)
2017-04-28

The submission of proposals to the 18 topics of this H2020-ICT-2017 call closed on 25 April 2017. A total of995 proposals were submitted in response to these topics. Please find below the breakdown per topic and type of action:

Topic RIA IA CSAPCP TOTALICT-05-2017 52 2 54ICT-11-2017 103 9 112ICT-14-2016-2017 44 44ICT-15-2016-2017 18 18ICT-16-2017 7676ICT-17-2016-2017 3 3ICT-20-2017115 115ICT-23-201777 7 84ICT-25-2016-2017 83 48131ICT-27-2017 35 2 3 40ICT-28-2017 88ICT-30-201752 271 80ICT-31-201743 61 50ICT-32-2017 5115 66ICT-33-2017 10 10ICT-39-2016-2017 7171ICT-40-2017 5 5ICT-41-2017 28 28TOTAL536 37779 3 995

2017-03-17

An overview of the evaluation results (called 'Flash Call Info') of the H2020-ICT-2016-2 call is now available under the 'Topic conditions & documents' section on the topic pages of topics ICT-04, ICT-07, ICT-08, ICT-09 and ICT-19.

2016-12-08
The submission session is now available for: ICT-32-2017(IA), ICT-31-2017(IA), ICT-40-2017(CSA), ICT-14-2016-2017(IA), ICT-41-2017(CSA), ICT-15-2016-2017(IA), ICT-20-2017(RIA), ICT-17-2016-2017(RIA), ICT-16-2017(RIA), ICT-11-2017(IA), ICT-33-2017(CSA), ICT-32-2017(CSA), ICT-23-2017(IA), ICT-31-2017(CSA), ICT-30-2017(CSA), ICT-28-2017(CSA), ICT-30-2017(IA), ICT-05-2017(RIA), ICT-27-2017(PCP), ICT-23-2017(RIA), ICT-31-2017(RIA), ICT-30-2017(RIA), ICT-25-2016-2017(IA), ICT-27-2017(IA), ICT-11-2017(CSA), ICT-25-2016-2017(RIA), ICT-05-2017(CSA), ICT-27-2017(RIA), ICT-39-2016-2017(IA)
2016-11-10

The submission of proposals to the5 topicsof this H2020-ICT-2016-2 call closed on8 November 2016. A total of264 proposals were submitted in response to these topics. Please find below the breakdown per topic and type of action:

Topic CSA RIA IA TotalICT-04 7 19 26ICT-075 72 77ICT-08 8 16 24ICT-09 52 52ICT-19 9 75 85

2016-11-10

The submission of proposals to the5 topicsof this call closed on8 November 2016. A total of264 proposals were submitted in response to these topics. Please find below the breakdown per topic and type of action:

Topic CSA RIA IA TotalICT-04 7 19 26ICT-075 72 77ICT-08 816 24ICT-09 52 52ICT-19 9 75 85

2016-08-08

An overview of the evaluation results (flash call info) for the all topics from call H2020-ICT-2016 -1 that closed on 12 April 2016 is now available here or under the ‘Topic conditions & documents’ section on each topic page.

2016-05-10
The submission session is now available for: ICT-08-2017(RIA), ICT-19-2017(IA), ICT-09-2017(RIA), ICT-07-2017(RIA), ICT-04-2017(CSA), ICT-08-2017(IA), ICT-19-2017(CSA), ICT-04-2017(IA), ICT-07-2017(CSA)
2016-04-15

Submission of proposals to 20 topics in this callclosed on 12April 2016. A total of1080 proposals were submitted in response to these topics. The breakdown per topic and type of action is as follows:

Topic CSA RIAIA PCP TotalICT-013 73 76ICT-02 34 7 41ICT-032 75 77ICT-06 87 17 104ICT-10 90 90ICT-12115 1127ICT-13 4 14 18ICT-14 40 40ICT-15 14 14ICT-17 2 2ICT-18 4 31 35ICT-21 33 33ICT-22 94 48 142ICT-24 9595ICT-25 75 39 114ICT-26 49 6 55ICT-29 7 59 5 71ICT-34 5 5ICT-35 18 18ICT-36 16 7 23Total 39 714 322 5 1080

2016-01-26

Submission of proposals to topics ICT-37-2016,ICT-38-2016and ICT-39-2016closed on 19 January 2016. A total of12 proposals were submitted in response to these 3 topics. The breakdown per topic and type of action is as follows:

CSA RIA TotalICT-37-2016 4 4ICT-38-2016 3 2 5ICT-39-2016 3 3Total 10 2 12

2015-10-20
The submission session is now available for: ICT-38-2016(CSA), ICT-39-2016-2017(CSA), ICT-38-2016(RIA), ICT-37-2016(CSA)
call topic details
Call status: Closed
Opening date: 2015-10-20 (10 years ago)
Closing date: 2016-04-12 (10 years ago)
Procedure: single-stage

Budget: 8,000,000
Expected grants: not specified
News flashes

This call topic has been appended 13 times by the EC with news.

  • 2017-08-11
    an overview of the evaluation results (c...
  • 2017-08-11
    an overview of the evaluation results (c...
  • 2017-05-22
    the submission session is now available...
  • 2017-04-28
    the submission of proposals to the 18 to...
  • 2017-03-17
    an overview of the evaluation results (c...
  • 2016-12-08
    the submission session is now available...
  • 2016-11-10
    the submission of proposals to the5 topi...
  • 2016-11-10
    the submission of proposals to the5 topi...
  • 2016-08-08
    an overview of the evaluation results (f...
  • 2016-05-10
    the submission session is now available...
  • 2016-04-15
    submission of proposals to 20 topics in...
  • 2016-01-26
    submission of proposals to topics ict-37...
  • 2015-10-20
    the submission session is now available...
Source information

Showing the latest information. Found 1 version of this call topic in the F&T portal.

Information from

  • 2024-03-30_14-21-24

Annotations

You must be logged in to add annotations
No annotations yet

Events

Hand-picked events relevant to this call topic.

No events yet

There are currently no events linked to this call topic.

Timeline

Track where this call stands in its lifecycle, from work programme to grant signature, and see what's likely to happen next.

Call published · 30 Sep 2024 (2 years ago)

All expected milestones for this call have passed.

Today

Work programme published

14 Aug 2015 · est.

Call opens

20 Oct 2015

Call closes

12 Apr 2016

Outcome expected

12 Sep 2016 · est.

Grant agreement signed

12 Dec 2016 · est.

Call published

30 Sep 2024

Preparation Open for submission Evaluation Grant preparation Not yet reached
  1. Work programme published Estimated

    14 Aug 2015 · 11 years ago

    Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.

  2. Call opens

    20 Oct 2015 · 10 years ago

    Submissions can be made from this date.

  3. Call closes

    12 Apr 2016 · 10 years ago

    Deadline to submit a proposal.

  4. Outcome expected Estimated

    12 Sep 2016 · 10 years ago

    The maximum time to inform applicants of the evaluation outcome is five months after the call closes.

  5. Grant agreement signed Estimated

    12 Dec 2016 · 9 years ago

    The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.

  6. Call published

    30 Sep 2024 · 2 years ago

    This topic was first published in TopicTree.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Ecosystem bubbles

This call topic is part of the following thematic bubbles.

1 bubble

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal