HORIZON-CL4-2021-TWIN-TRANSITION-01-11

Automated tools for the valorisation of construction waste (RIA) -

Call text (as on F&T portal)

View on F&T portal

Expected Outcome:

Projects are expected to contribute to the following outcomes:

  • Increase significantly the construction and demolition waste (CDW) utilisation (at least 80% weight in line with the current waste Directive 2008/98/EC[1] as amended by Directive 2018/851[2]) by cascade approach including re-use, recycle and transformation of waste into secondary products in full cooperation between construction and waste management companies
  • Provide new value chain and sustainable business models for construction waste reduction mobilising cross sectorial actors;
  • Implement appropriate tracing of material and /or component along the new value chain.
  • Increase by 50% the reusability of construction products post demolition and reduce the down cycling of construction waste by facilitating modular dismantling of complex construction products;
  • Plan a list of actions for overcoming relevant barriers (e.g. end of waste criteria, lack of trust in secondary products, awareness of circular potential);
  • Develop holistic and replicable solutions for more circular and climate neutral construction materials and activities involving upstream and down-stream actors.

Relevant indicators and metrics, with baseline values, should be clearly stated in the proposal.

Scope:

Based on volume, construction and demolition waste (CDW) is the largest waste stream in the EU. Considering that most of the waste share is glass, concrete, steel and aluminium (or other metals), the embodied energy and embodied eq. CO2 emission in the CDW is significant (8.5 MT eq. CO2 for construction in Sweden in 2015). By reusing and recycling CDW in new constructions, the sector would come closer to the targets of becoming fully circular and climate neutral. Precise quantitative and qualitative waste estimation is crucial for waste management. This could be achieved by utilising digital technologies for instance Building Information Modelling (BIM), material and component tracing, dedicated apps for construction/de-construction and optimize site management. Such tools could provide data about material type and composition (e.g. whether there are hazardous materials that require special care) and quantities, and thus an estimation of the logistics needs, cost, etc. and make waste separation easier and faster, e.g. by combining with automated equipment and robots.

Proposals should:

  • Develop, test and promote the necessary digital tools for material and/or component tracing and CDW management in different types of construction or demolition sites. The proposed tools should use as far as possible existing databases for waste management;
  • Develop automated solutions for de-construction and waste separation process;
  • Implement cross-sectorial holistic solutions involving glass, concrete, steel, ceramics, non-ferrous, etc. from the construction product and material side but also waste management, transportation and construction equipment and machinery side;
  • Produce all required training material for the proper use of the developed technologies The content should be sufficiently inclusive and encompass the diversity of different users;
  • Demonstrate all developed solutions (reutilisation, recycling, transformation, etc.) in at least four implementation sites across different European countries, considering the material recovery, transformation and utilisation;
  • Assess the value of the solutions in terms of the additional monetary value/reduction of eq. CO2 emissions produced;
  • Besides the new solutions benefits, safety should be considered (on construction issues, hazardous materials, etc.)
  • Proposals should consider the development of learning resources for the current and future generations of employees, with the possibility to integrate them in existing curricula and modules for undergraduate level and lifelong learning programmes. The projects should provide contributions to relevant standards or best practices.
  • The projects should provide contributions to relevant standards or best practices.

Proposals submitted under this topic should include a business case and exploitation strategy, as outlined in the introduction to this Destination.

In order to achieve the expected outcomes, international cooperation is encouraged, in particular with Asian countries.

null

Activities are expected to start at TRL 4 and achieve TRL 6 by the end of the project – see General Annex B.

[1] Directive 2008/98/EC: https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=celex%3A32008L0098

[2] Directive 2018/851: https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=celex:32018L0851

News flashes

2022-01-10

Call for proposals: HORIZON-CL4-2021-TWIN-TRANSITION-01      

Deadline: 23 September 2021

 Available budget: EUR 403,000,000

Topic code

Type(s) of action

Budget

HORIZON-CL4-2021-TWIN-TRANSITION-01-01

IA

28.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-02

IA

27.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-03

RIA

26.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-05

RIA

20.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-07

IA

18.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-08

IA

24.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-10

IA

15.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-11

RIA

21.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-12

RIA

24.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-14

RIA

28.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-16

CSA

2.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-17

IA

39.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-18

IA

28.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-19

IA

14.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-20

IA

36.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-21

IA

39.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-22

IA

14.00

The Commission has now completed the evaluation of the proposals submitted to the above-mentioned call.

 The results of the evaluation are as follows:

            Number of proposals submitted (including proposals transferred from or to other calls): 296

Number of inadmissible proposals: 0

Number of ineligible proposals: 1

Number of above-threshold proposals: 205

Total budget requested for above-threshold proposals: EUR 1,534,654,786

We recently informed the applicants about the evaluation results for their proposals.

It is expected that the first grant agreements will be signed by March 2022.

Information on the selected projects will be published on CORDIS [1] after that date.

 

      Please note that the number of proposals that can finally be funded will depend on the finally available budget and the formal selection by the Commission.

Fo  For questions, please contact the Research Enquiry Service [2].

[1]      Available at http://cordis.europa.eu/projects/home_en.html

 

[2]      Available at http://ec.europa.eu/research/enquiries

2022-01-10

 Call for proposals: HORIZON-CL4-2021-TWIN-TRANSITION-01      

Deadline: 23 September 2021

Available budget: EUR 403,000,000

Topic code

Type(s) of action

Budget

HORIZON-CL4-2021-TWIN-TRANSITION-01-01

IA

28.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-02

IA

27.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-03

RIA

26.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-05

RIA

20.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-07

IA

18.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-08

IA

24.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-10

IA

15.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-11

RIA

21.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-12

RIA

24.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-14

RIA

28.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-16

CSA

2.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-17

IA

39.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-18

IA

28.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-19

IA

14.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-20

IA

36.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-21

IA

39.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-22

IA

14.00

The Commission has now completed the evaluation of the proposals submitted to the above-mentioned call.

The results of the evaluation are as follows:

            Number of proposals submitted (including proposals transferred from or to other calls): 296

Number of inadmissible proposals: 0

Number of ineligible proposals: 1

Number of above-threshold proposals: 205

Total budget requested for above-threshold proposals: EUR 1,534,654,786

We recently informed the applicants about the evaluation results for their proposals.

It is expected that the first grant agreements will be signed by March 2022.

Information on the selected projects will be published on CORDIS[1] after that date.

 

Please note that the number of proposals that can finally be funded will depend on the finally available budget and the formal selection by the Commission.

For questions, please contact the Research Enquiry Service[2].

 

[1]      Available at http://cordis.europa.eu/projects/home_en.html

[2]      Available at http://ec.europa.eu/research/enquiries

2022-01-10

Call for proposals: HORIZON-CL4-2021-TWIN-TRANSITION-01      

Deadline: 23 September 2021

 Available budget: EUR 403,000,000

Topic code

Type(s) of action

Budget

HORIZON-CL4-2021-TWIN-TRANSITION-01-01

IA

28.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-02

IA

27.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-03

RIA

26.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-05

RIA

20.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-07

IA

18.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-08

IA

24.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-10

IA

15.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-11

RIA

21.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-12

RIA

24.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-14

RIA

28.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-16

CSA

2.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-17

IA

39.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-18

IA

28.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-19

IA

14.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-20

IA

36.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-21

IA

39.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-22

IA

14.00

The Commission has now completed the evaluation of the proposals submitted to the above-mentioned call.

 The results of the evaluation are as follows:

            Number of proposals submitted (including proposals transferred from or to other calls): 296

Number of inadmissible proposals: 0

Number of ineligible proposals: 1

Number of above-threshold proposals: 205

Total budget requested for above-threshold proposals: EUR 1,534,654,786

We recently informed the applicants about the evaluation results for their proposals.

It is expected that the first grant agreements will be signed by March 2022.

Information on the selected projects will be published on CORDIS [1] after that date.

 

      Please note that the number of proposals that can finally be funded will depend on the finally available budget and the formal selection by the Commission.

Fo  For questions, please contact the Research Enquiry Service [2].

[1]      Available at http://cordis.europa.eu/projects/home_en.html

 

[2]      Available at http://ec.europa.eu/research/enquiries

2022-01-10

 Call for proposals: HORIZON-CL4-2021-TWIN-TRANSITION-01      

Deadline: 23 September 2021

Available budget: EUR 403,000,000

Topic code

Type(s) of action

Budget

HORIZON-CL4-2021-TWIN-TRANSITION-01-01

IA

28.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-02

IA

27.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-03

RIA

26.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-05

RIA

20.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-07

IA

18.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-08

IA

24.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-10

IA

15.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-11

RIA

21.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-12

RIA

24.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-14

RIA

28.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-16

CSA

2.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-17

IA

39.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-18

IA

28.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-19

IA

14.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-20

IA

36.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-21

IA

39.00

HORIZON-CL4-2021-TWIN-TRANSITION-01-22

IA

14.00

The Commission has now completed the evaluation of the proposals submitted to the above-mentioned call.

The results of the evaluation are as follows:

            Number of proposals submitted (including proposals transferred from or to other calls): 296

Number of inadmissible proposals: 0

Number of ineligible proposals: 1

Number of above-threshold proposals: 205

Total budget requested for above-threshold proposals: EUR 1,534,654,786

We recently informed the applicants about the evaluation results for their proposals.

It is expected that the first grant agreements will be signed by March 2022.

Information on the selected projects will be published on CORDIS[1] after that date.

 

Please note that the number of proposals that can finally be funded will depend on the finally available budget and the formal selection by the Commission.

For questions, please contact the Research Enquiry Service[2].

 

[1]      Available at http://cordis.europa.eu/projects/home_en.html

[2]      Available at http://ec.europa.eu/research/enquiries

2021-10-04

Deadline HORIZON-CL4-2021-TWIN-TRANSITION-01: 23.09.2021

A total of 296 proposals were submitted in response to this call.The number of proposals for each topic is shown below:

HORIZON-CL4-2021-TWIN-TRANSITION-01-01: 22

HORIZON-CL4-2021-TWIN-TRANSITION-01-02: 48

HORIZON-CL4-2021-TWIN-TRANSITION-01-03: 39

HORIZON-CL4-2021-TWIN-TRANSITION-01-05: 58

HORIZON-CL4-2021-TWIN-TRANSITION-01-07: 23

HORIZON-CL4-2021-TWIN-TRANSITION-01-08: 21

HORIZON-CL4-2021-TWIN-TRANSITION-01-10: 8

HORIZON-CL4-2021-TWIN-TRANSITION-01-11: 12

HORIZON-CL4-2021-TWIN-TRANSITION-01-12: 16

HORIZON-CL4-2021-TWIN-TRANSITION-01-14: 15

HORIZON-CL4-2021-TWIN-TRANSITION-01-16: 2

HORIZON-CL4-2021-TWIN-TRANSITION-01-17: 7

HORIZON-CL4-2021-TWIN-TRANSITION-01-18: 2

HORIZON-CL4-2021-TWIN-TRANSITION-01-19: 6

HORIZON-CL4-2021-TWIN-TRANSITION-01-20: 8

HORIZON-CL4-2021-TWIN-TRANSITION-01-21: 8

HORIZON-CL4-2021-TWIN-TRANSITION-01-22: 1

 

2021-10-04

Deadline HORIZON-CL4-2021-TWIN-TRANSITION-01: 23.09.2021

A total of 296 proposals were submitted in response to this call.The number of proposals for each topic is shown below:

HORIZON-CL4-2021-TWIN-TRANSITION-01-01: 22

HORIZON-CL4-2021-TWIN-TRANSITION-01-02: 48

HORIZON-CL4-2021-TWIN-TRANSITION-01-03: 39

HORIZON-CL4-2021-TWIN-TRANSITION-01-05: 58

HORIZON-CL4-2021-TWIN-TRANSITION-01-07: 23

HORIZON-CL4-2021-TWIN-TRANSITION-01-08: 21

HORIZON-CL4-2021-TWIN-TRANSITION-01-10: 8

HORIZON-CL4-2021-TWIN-TRANSITION-01-11: 12

HORIZON-CL4-2021-TWIN-TRANSITION-01-12: 16

HORIZON-CL4-2021-TWIN-TRANSITION-01-14: 15

HORIZON-CL4-2021-TWIN-TRANSITION-01-16: 2

HORIZON-CL4-2021-TWIN-TRANSITION-01-17: 7

HORIZON-CL4-2021-TWIN-TRANSITION-01-18: 2

HORIZON-CL4-2021-TWIN-TRANSITION-01-19: 6

HORIZON-CL4-2021-TWIN-TRANSITION-01-20: 8

HORIZON-CL4-2021-TWIN-TRANSITION-01-21: 8

HORIZON-CL4-2021-TWIN-TRANSITION-01-22: 1

 

2021-06-22
The submission session is now available for: HORIZON-CL4-2021-TWIN-TRANSITION-01-14(HORIZON-RIA), HORIZON-CL4-2021-TWIN-TRANSITION-01-02(HORIZON-IA), HORIZON-CL4-2021-TWIN-TRANSITION-01-16(HORIZON-CSA), HORIZON-CL4-2021-TWIN-TRANSITION-01-12(HORIZON-RIA), HORIZON-CL4-2021-TWIN-TRANSITION-01-17(HORIZON-IA), HORIZON-CL4-2021-TWIN-TRANSITION-01-21(HORIZON-IA), HORIZON-CL4-2021-TWIN-TRANSITION-01-20(HORIZON-IA), HORIZON-CL4-2021-TWIN-TRANSITION-01-22(HORIZON-IA), HORIZON-CL4-2021-TWIN-TRANSITION-01-18(HORIZON-IA), HORIZON-CL4-2021-TWIN-TRANSITION-01-03(HORIZON-RIA), HORIZON-CL4-2021-TWIN-TRANSITION-01-07(HORIZON-IA), HORIZON-CL4-2021-TWIN-TRANSITION-01-19(HORIZON-IA), HORIZON-CL4-2021-TWIN-TRANSITION-01-01(HORIZON-IA), HORIZON-CL4-2021-TWIN-TRANSITION-01-08(HORIZON-IA), HORIZON-CL4-2021-TWIN-TRANSITION-01-11(HORIZON-RIA), HORIZON-CL4-2021-TWIN-TRANSITION-01-10(HORIZON-IA), HORIZON-CL4-2021-TWIN-TRANSITION-01-05(HORIZON-RIA)
2021-06-22
The submission session is now available for: HORIZON-CL4-2021-TWIN-TRANSITION-01-14(HORIZON-RIA), HORIZON-CL4-2021-TWIN-TRANSITION-01-02(HORIZON-IA), HORIZON-CL4-2021-TWIN-TRANSITION-01-16(HORIZON-CSA), HORIZON-CL4-2021-TWIN-TRANSITION-01-12(HORIZON-RIA), HORIZON-CL4-2021-TWIN-TRANSITION-01-17(HORIZON-IA), HORIZON-CL4-2021-TWIN-TRANSITION-01-21(HORIZON-IA), HORIZON-CL4-2021-TWIN-TRANSITION-01-20(HORIZON-IA), HORIZON-CL4-2021-TWIN-TRANSITION-01-22(HORIZON-IA), HORIZON-CL4-2021-TWIN-TRANSITION-01-18(HORIZON-IA), HORIZON-CL4-2021-TWIN-TRANSITION-01-03(HORIZON-RIA), HORIZON-CL4-2021-TWIN-TRANSITION-01-07(HORIZON-IA), HORIZON-CL4-2021-TWIN-TRANSITION-01-19(HORIZON-IA), HORIZON-CL4-2021-TWIN-TRANSITION-01-01(HORIZON-IA), HORIZON-CL4-2021-TWIN-TRANSITION-01-08(HORIZON-IA), HORIZON-CL4-2021-TWIN-TRANSITION-01-11(HORIZON-RIA), HORIZON-CL4-2021-TWIN-TRANSITION-01-10(HORIZON-IA), HORIZON-CL4-2021-TWIN-TRANSITION-01-05(HORIZON-RIA)
call topic details
Call status: Closed
Opening date: 2021-06-22 (5 years ago)
Closing date: 2021-09-23 (5 years ago)
Procedure: single-stage

Budget: 21,000,000
Expected grants: 3
Contribution: 6,000,000 - 10,000,000
News flashes

This call topic has been appended 8 times by the EC with news.

  • 2022-01-10
    call for proposals: horizon-cl4-2021-twi...
  • 2022-01-10
     call for proposals: horizon-cl4-20...
  • 2022-01-10
    call for proposals: horizon-cl4-2021-twi...
  • 2022-01-10
     call for proposals: horizon-cl4-20...
  • 2021-10-04
    deadline horizon-cl4-2021-twin-transitio...
  • 2021-10-04
    deadline horizon-cl4-2021-twin-transitio...
  • 2021-06-22
    the submission session is now available...
  • 2021-06-22
    the submission session is now available...
Source information

Showing the latest information. Found 198 versions of this call topic in the F&T portal.

Information from

  • 2026-10-06_09-42-20
  • 2026-10-06_09-34-57
  • 2026-10-05_09-39-06
  • 2026-10-05_09-31-20
  • 2026-10-04_09-36-46
  • 2026-10-04_09-29-55
  • 2026-10-03_09-38-43
  • 2026-10-03_09-30-53
  • 2026-10-02_09-43-07
  • 2026-10-02_09-31-25
  • 2026-10-01_09-47-20
  • 2026-10-01_09-35-16
  • 2026-09-29_10-35-27
  • 2026-09-29_10-20-57
  • 2026-09-28_10-37-51
  • 2026-09-28_10-21-22
  • 2026-09-27_10-34-43
  • 2026-09-27_10-19-24
  • 2026-09-26_10-30-27
  • 2026-09-26_10-15-37
  • 2026-09-25_10-31-10
  • 2026-09-25_10-15-53
  • 2026-09-24_10-37-03
  • 2026-09-24_10-21-02
  • 2026-09-23_10-28-39
  • 2026-09-23_10-14-25
  • 2026-09-22_10-30-06
  • 2026-09-22_10-15-03
  • 2026-09-21_10-23-19
  • 2026-09-21_10-08-28
  • 2026-09-20_10-23-20
  • 2026-09-20_10-09-06
  • 2026-09-19_10-19-50
  • 2026-09-19_10-05-21
  • 2026-09-18_10-26-21
  • 2026-09-18_10-11-49
  • 2026-09-17_10-21-06
  • 2026-09-17_10-06-42
  • 2026-09-16_10-18-15
  • 2026-09-16_10-04-02
  • 2026-09-15_10-21-51
  • 2026-09-15_10-07-01
  • 2026-09-14_10-19-49
  • 2026-09-14_10-05-08
  • 2026-09-13_10-17-54
  • 2026-09-13_10-03-07
  • 2026-09-12_10-20-45
  • 2026-09-12_10-06-07
  • 2026-09-11_10-23-30
  • 2026-09-11_10-09-20
  • 2026-09-10_10-19-35
  • 2026-09-10_10-05-23
  • 2026-09-09_10-24-03
  • 2026-09-09_10-09-55
  • 2026-09-08_10-19-55
  • 2026-09-08_10-05-13
  • 2026-09-07_10-19-48
  • 2026-09-07_10-04-00
  • 2026-09-06_10-13-23
  • 2026-09-06_09-59-21
  • 2026-09-05_10-11-44
  • 2026-09-05_09-57-40
  • 2026-09-04_10-12-17
  • 2026-09-04_09-57-49
  • 2026-09-03_10-07-09
  • 2026-09-03_09-55-51
  • 2026-09-02_10-12-42
  • 2026-09-02_09-57-40
  • 2026-09-01_10-07-55
  • 2026-09-01_09-55-52
  • 2026-08-31_10-16-11
  • 2026-08-31_10-01-46
  • 2026-08-30_10-05-32
  • 2026-08-30_09-51-51
  • 2026-08-29_10-06-37
  • 2026-08-29_09-53-19
  • 2026-08-28_10-09-34
  • 2026-08-28_09-55-52
  • 2026-08-27_09-57-17
  • 2026-08-27_09-43-44
  • 2026-08-25_10-02-50
  • 2026-08-25_09-49-21
  • 2026-08-24_09-57-01
  • 2026-08-24_09-45-11
  • 2026-08-23_09-54-41
  • 2026-08-23_09-42-10
  • 2026-08-22_09-58-17
  • 2026-08-22_09-45-21
  • 2026-08-21_09-47-30
  • 2026-08-21_09-35-59
  • 2026-08-20_09-53-48
  • 2026-08-20_09-42-18
  • 2026-08-19_09-54-11
  • 2026-08-19_09-42-57
  • 2026-08-18_09-49-33
  • 2026-08-18_09-36-42
  • 2026-08-17_09-51-40
  • 2026-08-17_09-38-42
  • 2026-08-16_09-43-23
  • 2026-08-16_09-30-21
  • 2026-08-15_09-57-27
  • 2026-08-15_09-45-02
  • 2026-08-14_09-47-22
  • 2026-08-14_09-36-37
  • 2026-08-13_09-43-22
  • 2026-08-13_09-30-19
  • 2026-08-12_09-42-08
  • 2026-08-12_09-29-49
  • 2026-08-11_09-42-07
  • 2026-08-11_09-30-41
  • 2026-08-10_09-43-33
  • 2026-08-10_09-32-37
  • 2026-08-09_09-37-08
  • 2026-08-09_09-26-31
  • 2026-08-08_09-36-42
  • 2026-08-08_09-25-46
  • 2026-08-07_09-36-08
  • 2026-08-07_09-25-36
  • 2026-08-06_09-38-30
  • 2026-08-06_09-26-16
  • 2026-08-05_09-37-54
  • 2026-08-05_09-26-38
  • 2026-08-04_09-36-44
  • 2026-08-04_09-25-45
  • 2026-08-03_09-35-53
  • 2026-08-03_09-25-00
  • 2026-08-02_09-32-53
  • 2026-08-02_09-20-47
  • 2026-08-01_09-32-35
  • 2026-08-01_09-21-27
  • 2026-07-31_09-34-09
  • 2026-07-31_09-22-08
  • 2026-07-30_09-31-21
  • 2026-07-30_09-19-04
  • 2026-07-29_09-32-59
  • 2026-07-29_09-21-59
  • 2026-07-28_09-31-40
  • 2026-07-28_09-20-59
  • 2026-07-27_09-24-49
  • 2026-07-27_09-13-46
  • 2026-07-26_09-19-56
  • 2026-07-26_09-09-29
  • 2026-07-25_09-20-23
  • 2026-07-25_09-10-31
  • 2026-07-24_09-25-45
  • 2026-07-24_09-13-49
  • 2026-07-23_09-21-18
  • 2026-07-23_09-11-08
  • 2026-07-22_09-23-36
  • 2026-07-22_09-13-24
  • 2026-07-21_09-23-40
  • 2026-07-21_09-12-28
  • 2026-07-20_09-22-15
  • 2026-07-20_09-11-50
  • 2026-07-19_09-23-26
  • 2026-07-19_09-11-29
  • 2026-07-18_09-20-05
  • 2026-07-18_09-09-40
  • 2026-07-17_09-18-56
  • 2026-07-17_09-08-20
  • 2026-07-16_08-49-05
  • 2026-07-16_08-39-55
  • 2026-07-15_08-50-57
  • 2026-07-15_08-41-46
  • 2026-07-14_08-47-27
  • 2026-07-14_08-38-25
  • 2026-07-13_08-48-14
  • 2026-07-13_08-39-54
  • 2026-07-12_08-46-46
  • 2026-07-12_08-38-50
  • 2026-07-11_08-45-24
  • 2026-07-11_08-37-23
  • 2026-07-10_08-44-00
  • 2026-07-10_08-36-08
  • 2026-07-09_08-45-18
  • 2026-07-09_08-37-33
  • 2026-07-08_08-45-00
  • 2026-07-08_08-37-00
  • 2026-07-07_08-43-46
  • 2026-07-07_08-35-45
  • 2026-07-06_08-43-45
  • 2026-07-06_08-36-06
  • 2026-07-05_08-38-17
  • 2026-07-05_08-31-05
  • 2026-07-04_08-37-35
  • 2026-07-04_08-30-23
  • 2026-07-03_08-39-50
  • 2026-07-02_08-31-16
  • 2026-06-30_09-31-41
  • 2026-06-29_11-36-15
  • 2026-06-29_09-35-26
  • 2026-06-28_09-33-44
  • 2026-06-28_09-16-57
  • 2026-06-27_09-34-28
  • 2026-06-27_09-17-42
  • 2026-06-27_09-14-40
  • 2026-02-19_07-26-11
  • 2024-03-30_14-18-07

Check the differences between the versions.

Annotations

You must be logged in to add annotations
No annotations yet

Events

Hand-picked events relevant to this call topic.

No events yet

There are currently no events linked to this call topic.

Timeline

Track where this call stands in its lifecycle, from work programme to grant signature, and see what's likely to happen next.

Call published · 30 Sep 2024 (2 years ago)

All expected milestones for this call have passed.

Today

Call opens

22 Jun 2021

Call closes

23 Sep 2021

Outcome expected

23 Feb 2022 · est.

Work programme published

11 Mar 2022 · est.

Grant agreement signed

23 May 2022 · est.

Call published

30 Sep 2024

Preparation Open for submission Evaluation Grant preparation Not yet reached
  1. Call opens

    22 Jun 2021 · 5 years ago

    Submissions can be made from this date.

  2. Call closes

    23 Sep 2021 · 5 years ago

    Deadline to submit a proposal.

  3. Outcome expected Estimated

    23 Feb 2022 · 4 years ago

    The maximum time to inform applicants of the evaluation outcome is five months after the call closes.

  4. Work programme published Estimated

    11 Mar 2022 · 4 years ago

    Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.

  5. Grant agreement signed Estimated

    23 May 2022 · 4 years ago

    The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.

  6. Call published

    30 Sep 2024 · 2 years ago

    This topic was first published in TopicTree.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Ecosystem bubbles

This call topic is part of the following thematic bubbles.

1 bubble

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal