HORIZON-CL4-2021-TWIN-TRANSITION-01-11
Automated tools for the valorisation of construction waste (RIA) -
Call text (as on F&T portal)
View on F&T portalExpected Outcome:
Projects are expected to contribute to the following outcomes:
- Increase significantly the construction and demolition waste (CDW) utilisation (at least 80% weight in line with the current waste Directive 2008/98/EC[1] as amended by Directive 2018/851[2]) by cascade approach including re-use, recycle and transformation of waste into secondary products in full cooperation between construction and waste management companies
- Provide new value chain and sustainable business models for construction waste reduction mobilising cross sectorial actors;
- Implement appropriate tracing of material and /or component along the new value chain.
- Increase by 50% the reusability of construction products post demolition and reduce the down cycling of construction waste by facilitating modular dismantling of complex construction products;
- Plan a list of actions for overcoming relevant barriers (e.g. end of waste criteria, lack of trust in secondary products, awareness of circular potential);
- Develop holistic and replicable solutions for more circular and climate neutral construction materials and activities involving upstream and down-stream actors.
Relevant indicators and metrics, with baseline values, should be clearly stated in the proposal.
Scope:
Based on volume, construction and demolition waste (CDW) is the largest waste stream in the EU. Considering that most of the waste share is glass, concrete, steel and aluminium (or other metals), the embodied energy and embodied eq. CO2 emission in the CDW is significant (8.5 MT eq. CO2 for construction in Sweden in 2015). By reusing and recycling CDW in new constructions, the sector would come closer to the targets of becoming fully circular and climate neutral. Precise quantitative and qualitative waste estimation is crucial for waste management. This could be achieved by utilising digital technologies for instance Building Information Modelling (BIM), material and component tracing, dedicated apps for construction/de-construction and optimize site management. Such tools could provide data about material type and composition (e.g. whether there are hazardous materials that require special care) and quantities, and thus an estimation of the logistics needs, cost, etc. and make waste separation easier and faster, e.g. by combining with automated equipment and robots.
Proposals should:
- Develop, test and promote the necessary digital tools for material and/or component tracing and CDW management in different types of construction or demolition sites. The proposed tools should use as far as possible existing databases for waste management;
- Develop automated solutions for de-construction and waste separation process;
- Implement cross-sectorial holistic solutions involving glass, concrete, steel, ceramics, non-ferrous, etc. from the construction product and material side but also waste management, transportation and construction equipment and machinery side;
- Produce all required training material for the proper use of the developed technologies The content should be sufficiently inclusive and encompass the diversity of different users;
- Demonstrate all developed solutions (reutilisation, recycling, transformation, etc.) in at least four implementation sites across different European countries, considering the material recovery, transformation and utilisation;
- Assess the value of the solutions in terms of the additional monetary value/reduction of eq. CO2 emissions produced;
- Besides the new solutions benefits, safety should be considered (on construction issues, hazardous materials, etc.)
- Proposals should consider the development of learning resources for the current and future generations of employees, with the possibility to integrate them in existing curricula and modules for undergraduate level and lifelong learning programmes. The projects should provide contributions to relevant standards or best practices.
- The projects should provide contributions to relevant standards or best practices.
Proposals submitted under this topic should include a business case and exploitation strategy, as outlined in the introduction to this Destination.
In order to achieve the expected outcomes, international cooperation is encouraged, in particular with Asian countries.
null
Activities are expected to start at TRL 4 and achieve TRL 6 by the end of the project – see General Annex B.
[1] Directive 2008/98/EC: https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=celex%3A32008L0098
[2] Directive 2018/851: https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=celex:32018L0851
News flashes
Call for proposals: HORIZON-CL4-2021-TWIN-TRANSITION-01
Deadline: 23 September 2021
Available budget: EUR 403,000,000
Topic code
Type(s) of action
Budget
HORIZON-CL4-2021-TWIN-TRANSITION-01-01
IA
28.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-02
IA
27.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-03
RIA
26.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-05
RIA
20.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-07
IA
18.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-08
IA
24.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-10
IA
15.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-11
RIA
21.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-12
RIA
24.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-14
RIA
28.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-16
CSA
2.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-17
IA
39.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-18
IA
28.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-19
IA
14.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-20
IA
36.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-21
IA
39.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-22
IA
14.00
The Commission has now completed the evaluation of the proposals submitted to the above-mentioned call.
The results of the evaluation are as follows:
Number of proposals submitted (including proposals transferred from or to other calls): 296
Number of inadmissible proposals: 0
Number of ineligible proposals: 1
Number of above-threshold proposals: 205
Total budget requested for above-threshold proposals: EUR 1,534,654,786
We recently informed the applicants about the evaluation results for their proposals.
It is expected that the first grant agreements will be signed by March 2022.
Information on the selected projects will be published on CORDIS [1] after that date.
Please note that the number of proposals that can finally be funded will depend on the finally available budget and the formal selection by the Commission.
Fo For questions, please contact the Research Enquiry Service [2].
[1] Available at http://cordis.europa.eu/projects/home_en.html
[2] Available at http://ec.europa.eu/research/enquiries
Call for proposals: HORIZON-CL4-2021-TWIN-TRANSITION-01
Deadline: 23 September 2021
Available budget: EUR 403,000,000
Topic code
Type(s) of action
Budget
HORIZON-CL4-2021-TWIN-TRANSITION-01-01
IA
28.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-02
IA
27.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-03
RIA
26.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-05
RIA
20.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-07
IA
18.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-08
IA
24.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-10
IA
15.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-11
RIA
21.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-12
RIA
24.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-14
RIA
28.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-16
CSA
2.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-17
IA
39.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-18
IA
28.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-19
IA
14.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-20
IA
36.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-21
IA
39.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-22
IA
14.00
The Commission has now completed the evaluation of the proposals submitted to the above-mentioned call.
The results of the evaluation are as follows:
Number of proposals submitted (including proposals transferred from or to other calls): 296
Number of inadmissible proposals: 0
Number of ineligible proposals: 1
Number of above-threshold proposals: 205
Total budget requested for above-threshold proposals: EUR 1,534,654,786
We recently informed the applicants about the evaluation results for their proposals.
It is expected that the first grant agreements will be signed by March 2022.
Information on the selected projects will be published on CORDIS[1] after that date.
Please note that the number of proposals that can finally be funded will depend on the finally available budget and the formal selection by the Commission.
For questions, please contact the Research Enquiry Service[2].
[1] Available at http://cordis.europa.eu/projects/home_en.html
[2] Available at http://ec.europa.eu/research/enquiries
Call for proposals: HORIZON-CL4-2021-TWIN-TRANSITION-01
Deadline: 23 September 2021
Available budget: EUR 403,000,000
Topic code
Type(s) of action
Budget
HORIZON-CL4-2021-TWIN-TRANSITION-01-01
IA
28.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-02
IA
27.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-03
RIA
26.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-05
RIA
20.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-07
IA
18.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-08
IA
24.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-10
IA
15.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-11
RIA
21.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-12
RIA
24.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-14
RIA
28.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-16
CSA
2.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-17
IA
39.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-18
IA
28.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-19
IA
14.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-20
IA
36.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-21
IA
39.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-22
IA
14.00
The Commission has now completed the evaluation of the proposals submitted to the above-mentioned call.
The results of the evaluation are as follows:
Number of proposals submitted (including proposals transferred from or to other calls): 296
Number of inadmissible proposals: 0
Number of ineligible proposals: 1
Number of above-threshold proposals: 205
Total budget requested for above-threshold proposals: EUR 1,534,654,786
We recently informed the applicants about the evaluation results for their proposals.
It is expected that the first grant agreements will be signed by March 2022.
Information on the selected projects will be published on CORDIS [1] after that date.
Please note that the number of proposals that can finally be funded will depend on the finally available budget and the formal selection by the Commission.
Fo For questions, please contact the Research Enquiry Service [2].
[1] Available at http://cordis.europa.eu/projects/home_en.html
[2] Available at http://ec.europa.eu/research/enquiries
Call for proposals: HORIZON-CL4-2021-TWIN-TRANSITION-01
Deadline: 23 September 2021
Available budget: EUR 403,000,000
Topic code
Type(s) of action
Budget
HORIZON-CL4-2021-TWIN-TRANSITION-01-01
IA
28.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-02
IA
27.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-03
RIA
26.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-05
RIA
20.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-07
IA
18.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-08
IA
24.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-10
IA
15.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-11
RIA
21.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-12
RIA
24.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-14
RIA
28.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-16
CSA
2.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-17
IA
39.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-18
IA
28.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-19
IA
14.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-20
IA
36.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-21
IA
39.00
HORIZON-CL4-2021-TWIN-TRANSITION-01-22
IA
14.00
The Commission has now completed the evaluation of the proposals submitted to the above-mentioned call.
The results of the evaluation are as follows:
Number of proposals submitted (including proposals transferred from or to other calls): 296
Number of inadmissible proposals: 0
Number of ineligible proposals: 1
Number of above-threshold proposals: 205
Total budget requested for above-threshold proposals: EUR 1,534,654,786
We recently informed the applicants about the evaluation results for their proposals.
It is expected that the first grant agreements will be signed by March 2022.
Information on the selected projects will be published on CORDIS[1] after that date.
Please note that the number of proposals that can finally be funded will depend on the finally available budget and the formal selection by the Commission.
For questions, please contact the Research Enquiry Service[2].
[1] Available at http://cordis.europa.eu/projects/home_en.html
[2] Available at http://ec.europa.eu/research/enquiries
Deadline HORIZON-CL4-2021-TWIN-TRANSITION-01: 23.09.2021
A total of 296 proposals were submitted in response to this call.The number of proposals for each topic is shown below:
HORIZON-CL4-2021-TWIN-TRANSITION-01-01: 22
HORIZON-CL4-2021-TWIN-TRANSITION-01-02: 48
HORIZON-CL4-2021-TWIN-TRANSITION-01-03: 39
HORIZON-CL4-2021-TWIN-TRANSITION-01-05: 58
HORIZON-CL4-2021-TWIN-TRANSITION-01-07: 23
HORIZON-CL4-2021-TWIN-TRANSITION-01-08: 21
HORIZON-CL4-2021-TWIN-TRANSITION-01-10: 8
HORIZON-CL4-2021-TWIN-TRANSITION-01-11: 12
HORIZON-CL4-2021-TWIN-TRANSITION-01-12: 16
HORIZON-CL4-2021-TWIN-TRANSITION-01-14: 15
HORIZON-CL4-2021-TWIN-TRANSITION-01-16: 2
HORIZON-CL4-2021-TWIN-TRANSITION-01-17: 7
HORIZON-CL4-2021-TWIN-TRANSITION-01-18: 2
HORIZON-CL4-2021-TWIN-TRANSITION-01-19: 6
HORIZON-CL4-2021-TWIN-TRANSITION-01-20: 8
HORIZON-CL4-2021-TWIN-TRANSITION-01-21: 8
HORIZON-CL4-2021-TWIN-TRANSITION-01-22: 1
Deadline HORIZON-CL4-2021-TWIN-TRANSITION-01: 23.09.2021
A total of 296 proposals were submitted in response to this call.The number of proposals for each topic is shown below:
HORIZON-CL4-2021-TWIN-TRANSITION-01-01: 22
HORIZON-CL4-2021-TWIN-TRANSITION-01-02: 48
HORIZON-CL4-2021-TWIN-TRANSITION-01-03: 39
HORIZON-CL4-2021-TWIN-TRANSITION-01-05: 58
HORIZON-CL4-2021-TWIN-TRANSITION-01-07: 23
HORIZON-CL4-2021-TWIN-TRANSITION-01-08: 21
HORIZON-CL4-2021-TWIN-TRANSITION-01-10: 8
HORIZON-CL4-2021-TWIN-TRANSITION-01-11: 12
HORIZON-CL4-2021-TWIN-TRANSITION-01-12: 16
HORIZON-CL4-2021-TWIN-TRANSITION-01-14: 15
HORIZON-CL4-2021-TWIN-TRANSITION-01-16: 2
HORIZON-CL4-2021-TWIN-TRANSITION-01-17: 7
HORIZON-CL4-2021-TWIN-TRANSITION-01-18: 2
HORIZON-CL4-2021-TWIN-TRANSITION-01-19: 6
HORIZON-CL4-2021-TWIN-TRANSITION-01-20: 8
HORIZON-CL4-2021-TWIN-TRANSITION-01-21: 8
HORIZON-CL4-2021-TWIN-TRANSITION-01-22: 1
Opening date: 2021-06-22 (5 years ago)
Closing date: 2021-09-23 (5 years ago)
Procedure: single-stage
Budget: 21,000,000
Expected grants: 3
Contribution: 6,000,000 - 10,000,000
This call topic has been appended 8 times by the EC with news.
-
2022-01-10
call for proposals: horizon-cl4-2021-twi... -
2022-01-10
 call for proposals: horizon-cl4-20... -
2022-01-10
call for proposals: horizon-cl4-2021-twi... -
2022-01-10
 call for proposals: horizon-cl4-20... -
2021-10-04
deadline horizon-cl4-2021-twin-transitio... -
2021-10-04
deadline horizon-cl4-2021-twin-transitio... -
2021-06-22
the submission session is now available... -
2021-06-22
the submission session is now available...
HORIZON-CL4-2021-TWIN-TRANSITION-01
Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.
There are 16 other topics in this call:
- HORIZON-CL4-2021-TWIN-TRANSITION-01-01
- HORIZON-CL4-2021-TWIN-TRANSITION-01-02
- HORIZON-CL4-2021-TWIN-TRANSITION-01-03
- HORIZON-CL4-2021-TWIN-TRANSITION-01-05
- HORIZON-CL4-2021-TWIN-TRANSITION-01-07
- HORIZON-CL4-2021-TWIN-TRANSITION-01-08
- HORIZON-CL4-2021-TWIN-TRANSITION-01-10
- HORIZON-CL4-2021-TWIN-TRANSITION-01-12
- HORIZON-CL4-2021-TWIN-TRANSITION-01-14
- HORIZON-CL4-2021-TWIN-TRANSITION-01-16
- HORIZON-CL4-2021-TWIN-TRANSITION-01-17
- HORIZON-CL4-2021-TWIN-TRANSITION-01-18
- HORIZON-CL4-2021-TWIN-TRANSITION-01-19
- HORIZON-CL4-2021-TWIN-TRANSITION-01-20
- HORIZON-CL4-2021-TWIN-TRANSITION-01-21
- HORIZON-CL4-2021-TWIN-TRANSITION-01-22
Showing the latest information. Found 198 versions of this call topic in the F&T portal.
Information from
- 2026-10-06_09-42-20
- 2026-10-06_09-34-57
- 2026-10-05_09-39-06
- 2026-10-05_09-31-20
- 2026-10-04_09-36-46
- 2026-10-04_09-29-55
- 2026-10-03_09-38-43
- 2026-10-03_09-30-53
- 2026-10-02_09-43-07
- 2026-10-02_09-31-25
- 2026-10-01_09-47-20
- 2026-10-01_09-35-16
- 2026-09-29_10-35-27
- 2026-09-29_10-20-57
- 2026-09-28_10-37-51
- 2026-09-28_10-21-22
- 2026-09-27_10-34-43
- 2026-09-27_10-19-24
- 2026-09-26_10-30-27
- 2026-09-26_10-15-37
- 2026-09-25_10-31-10
- 2026-09-25_10-15-53
- 2026-09-24_10-37-03
- 2026-09-24_10-21-02
- 2026-09-23_10-28-39
- 2026-09-23_10-14-25
- 2026-09-22_10-30-06
- 2026-09-22_10-15-03
- 2026-09-21_10-23-19
- 2026-09-21_10-08-28
- 2026-09-20_10-23-20
- 2026-09-20_10-09-06
- 2026-09-19_10-19-50
- 2026-09-19_10-05-21
- 2026-09-18_10-26-21
- 2026-09-18_10-11-49
- 2026-09-17_10-21-06
- 2026-09-17_10-06-42
- 2026-09-16_10-18-15
- 2026-09-16_10-04-02
- 2026-09-15_10-21-51
- 2026-09-15_10-07-01
- 2026-09-14_10-19-49
- 2026-09-14_10-05-08
- 2026-09-13_10-17-54
- 2026-09-13_10-03-07
- 2026-09-12_10-20-45
- 2026-09-12_10-06-07
- 2026-09-11_10-23-30
- 2026-09-11_10-09-20
- 2026-09-10_10-19-35
- 2026-09-10_10-05-23
- 2026-09-09_10-24-03
- 2026-09-09_10-09-55
- 2026-09-08_10-19-55
- 2026-09-08_10-05-13
- 2026-09-07_10-19-48
- 2026-09-07_10-04-00
- 2026-09-06_10-13-23
- 2026-09-06_09-59-21
- 2026-09-05_10-11-44
- 2026-09-05_09-57-40
- 2026-09-04_10-12-17
- 2026-09-04_09-57-49
- 2026-09-03_10-07-09
- 2026-09-03_09-55-51
- 2026-09-02_10-12-42
- 2026-09-02_09-57-40
- 2026-09-01_10-07-55
- 2026-09-01_09-55-52
- 2026-08-31_10-16-11
- 2026-08-31_10-01-46
- 2026-08-30_10-05-32
- 2026-08-30_09-51-51
- 2026-08-29_10-06-37
- 2026-08-29_09-53-19
- 2026-08-28_10-09-34
- 2026-08-28_09-55-52
- 2026-08-27_09-57-17
- 2026-08-27_09-43-44
- 2026-08-25_10-02-50
- 2026-08-25_09-49-21
- 2026-08-24_09-57-01
- 2026-08-24_09-45-11
- 2026-08-23_09-54-41
- 2026-08-23_09-42-10
- 2026-08-22_09-58-17
- 2026-08-22_09-45-21
- 2026-08-21_09-47-30
- 2026-08-21_09-35-59
- 2026-08-20_09-53-48
- 2026-08-20_09-42-18
- 2026-08-19_09-54-11
- 2026-08-19_09-42-57
- 2026-08-18_09-49-33
- 2026-08-18_09-36-42
- 2026-08-17_09-51-40
- 2026-08-17_09-38-42
- 2026-08-16_09-43-23
- 2026-08-16_09-30-21
- 2026-08-15_09-57-27
- 2026-08-15_09-45-02
- 2026-08-14_09-47-22
- 2026-08-14_09-36-37
- 2026-08-13_09-43-22
- 2026-08-13_09-30-19
- 2026-08-12_09-42-08
- 2026-08-12_09-29-49
- 2026-08-11_09-42-07
- 2026-08-11_09-30-41
- 2026-08-10_09-43-33
- 2026-08-10_09-32-37
- 2026-08-09_09-37-08
- 2026-08-09_09-26-31
- 2026-08-08_09-36-42
- 2026-08-08_09-25-46
- 2026-08-07_09-36-08
- 2026-08-07_09-25-36
- 2026-08-06_09-38-30
- 2026-08-06_09-26-16
- 2026-08-05_09-37-54
- 2026-08-05_09-26-38
- 2026-08-04_09-36-44
- 2026-08-04_09-25-45
- 2026-08-03_09-35-53
- 2026-08-03_09-25-00
- 2026-08-02_09-32-53
- 2026-08-02_09-20-47
- 2026-08-01_09-32-35
- 2026-08-01_09-21-27
- 2026-07-31_09-34-09
- 2026-07-31_09-22-08
- 2026-07-30_09-31-21
- 2026-07-30_09-19-04
- 2026-07-29_09-32-59
- 2026-07-29_09-21-59
- 2026-07-28_09-31-40
- 2026-07-28_09-20-59
- 2026-07-27_09-24-49
- 2026-07-27_09-13-46
- 2026-07-26_09-19-56
- 2026-07-26_09-09-29
- 2026-07-25_09-20-23
- 2026-07-25_09-10-31
- 2026-07-24_09-25-45
- 2026-07-24_09-13-49
- 2026-07-23_09-21-18
- 2026-07-23_09-11-08
- 2026-07-22_09-23-36
- 2026-07-22_09-13-24
- 2026-07-21_09-23-40
- 2026-07-21_09-12-28
- 2026-07-20_09-22-15
- 2026-07-20_09-11-50
- 2026-07-19_09-23-26
- 2026-07-19_09-11-29
- 2026-07-18_09-20-05
- 2026-07-18_09-09-40
- 2026-07-17_09-18-56
- 2026-07-17_09-08-20
- 2026-07-16_08-49-05
- 2026-07-16_08-39-55
- 2026-07-15_08-50-57
- 2026-07-15_08-41-46
- 2026-07-14_08-47-27
- 2026-07-14_08-38-25
- 2026-07-13_08-48-14
- 2026-07-13_08-39-54
- 2026-07-12_08-46-46
- 2026-07-12_08-38-50
- 2026-07-11_08-45-24
- 2026-07-11_08-37-23
- 2026-07-10_08-44-00
- 2026-07-10_08-36-08
- 2026-07-09_08-45-18
- 2026-07-09_08-37-33
- 2026-07-08_08-45-00
- 2026-07-08_08-37-00
- 2026-07-07_08-43-46
- 2026-07-07_08-35-45
- 2026-07-06_08-43-45
- 2026-07-06_08-36-06
- 2026-07-05_08-38-17
- 2026-07-05_08-31-05
- 2026-07-04_08-37-35
- 2026-07-04_08-30-23
- 2026-07-03_08-39-50
- 2026-07-02_08-31-16
- 2026-06-30_09-31-41
- 2026-06-29_11-36-15
- 2026-06-29_09-35-26
- 2026-06-28_09-33-44
- 2026-06-28_09-16-57
- 2026-06-27_09-34-28
- 2026-06-27_09-17-42
- 2026-06-27_09-14-40
- 2026-02-19_07-26-11
- 2024-03-30_14-18-07
Check the differences between the versions.
Annotations
Events
Hand-picked events relevant to this call topic.
No events yet
There are currently no events linked to this call topic.
Timeline
Call published · 30 Sep 2024 (2 years ago)
All expected milestones for this call have passed.
Call opens
22 Jun 2021
Call closes
23 Sep 2021
Outcome expected
23 Feb 2022 · est.
Work programme published
11 Mar 2022 · est.
Grant agreement signed
23 May 2022 · est.
Call published
30 Sep 2024
-
Call opens
22 Jun 2021 · 5 years ago
Submissions can be made from this date.
-
Call closes
23 Sep 2021 · 5 years ago
Deadline to submit a proposal.
-
Outcome expected Estimated
23 Feb 2022 · 4 years ago
The maximum time to inform applicants of the evaluation outcome is five months after the call closes.
-
Work programme published Estimated
11 Mar 2022 · 4 years ago
Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.
-
Grant agreement signed Estimated
23 May 2022 · 4 years ago
The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.
-
Call published
30 Sep 2024 · 2 years ago
This topic was first published in TopicTree.
Funded Projects
Loading...
Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)
Ecosystem bubbles
This call topic is part of the following thematic bubbles.