HORIZON-JU-SNS-2023-STREAM-B-01-05
Microelectronics-based Solutions for 6G Networks -
About the connections
The graph above was generated based on the following links
Call text (as on F&T portal)
View on F&T portal- Increased capabilities of European microelectronics industry to provide solutions for communication networks and devices (beyond the today 4% of global markets), in line with the findings of the CoreNect CSA[1].
- Available solutions for devices at various levels of the device data processing chain, from baseband and mixed-signal processing to RF and Antenna system and considering new spectrum that may be needed for 6G.
- Availability of validated hardware solutions that may be used, especially from a physical layer radio perspective, in the context of the 6G standardisation with strong partnership between the microelectronics and communication industrial actors.
- Availability of open solutions that may support further innovation at any level, from the end devices to core 6G network components.
- Availability of solutions that will offer significant energy reduction for 6G communication systems.
- Availability of detailed technology and subsystem characterisation that can be further leveraged from a full development perspective under the KDT JU, in view of materialising the 6G-IA and AENEAS MoU agreement[2].
Please refer to the "Specific Challenges and Objectives" section for Stream B in the Work Programme, available under ‘Topic Conditions and Documents - Additional Documents’.
Scope:The focus of this Strand is on several complementary issues mentioned below and applicants may select one or more of these issues:
- Improved and more energy- and cost- efficient radio hardware for 6G RAN solutions for any ranges from below 6 GHz up to THz supported by implementations requiring integration of heterogeneous technologies, very wideband transceivers (>5GHz at Baseband), low impairments in general, low EVM support of moderate to high spectral efficiency that are potentially capable of joint communication and sensing, broadband same frequency full-duplex RF frontends for massive MIMO, reconfigurable surfaces, multi-band or multi-octave transceivers, high linearity, low phase noise, low impairments in general, also possibly addressing NTN environments requirements for low/medium earth orbit.
- Beamforming and multi-user technologies for any ranges from below 6 GHz up to THz including indicatively topics like Wideband beamforming, True time delay, Solutions for beam squint, Run-time calibration, Hybrid beamforming and MIMO, THz antenna systems (e.g., lens arrays and intelligent reflecting surfaces) that overcome the high path loss of THz bands that can be integrated by 6G networks to meet the new demanding KPIs.
- Antenna and packaging technologies and materials for 6G RAN solutions for any ranges from below 6 GHz up to THz including topics like On-chip antennas, Lens-integrated antennas, Planar and conformal antenna arrays, Integrated waveguides, Low loss distribution networks, Beamforming and MIMO, Meta-materials and meta-surfaces, human friendly radio systems (handle increased density, higher frequency ranges, control EMF).
Topics beyond the above scope may also be considered as long as they are complementary, relevant for the development of 6G networks and clear synergy with KDT topics is established in the proposals.
Applicants are encouraged to validate the aforementioned technologies in a system context, i.e. including power-efficient and ultra-fast ADC and DAC converters suitable for the aforementioned frequency bands, and an optimized use of advanced/heterogeneous computing platforms for baseband processing (e.g. based on general-purpose processors, GPUs, FPGAs, ASICs and combinations thereof), with the purpose of providing ultra-low latency, energy efficiency and optimised performance in the radio access network and the edge-to-cloud continuum.
[1] CoreNect Roadmap: see https://www.corenect.eu/roadmap
News flashes
EVALUATION results (corrigendum):
Published: 15/12/2022
Deadline: 25/04/2023
Available budget: EUR 132 million
The results of the evaluation are as follows:
Number of proposals submitted (including proposals transferred from or to other calls): 112
Number of inadmissible proposals: 0
Number of ineligible proposals: 0
Number of above-threshold proposals: 91
Total budget requested for above-threshold proposals: EUR 422,251,119.57
We recently informed the applicants about the evaluation results for their proposals.
For questions, please contact the Research Enquiry Service.
EVALUATION results
Published: 15/12/2022
Deadline: 25/04/2023
Available budget: EUR 49 000 000
The results of the evaluation are as follows:
Number of proposals submitted (including proposals transferred from or to other calls): 112
Number of inadmissible proposals: 0
Number of ineligible proposals: 0
Number of above-threshold proposals: 91
Total budget requested for above-threshold proposals: 422,251,119.57 €
We recently informed the applicants about the evaluation results for their proposals.
For questions, please contact the Research Enquiry Service.
EVALUATION results (corrigendum):
Published: 15/12/2022
Deadline: 25/04/2023
Available budget: EUR 132 million
The results of the evaluation are as follows:
Number of proposals submitted (including proposals transferred from or to other calls): 112
Number of inadmissible proposals: 0
Number of ineligible proposals: 0
Number of above-threshold proposals: 91
Total budget requested for above-threshold proposals: EUR 422,251,119.57
We recently informed the applicants about the evaluation results for their proposals.
For questions, please contact the Research Enquiry Service.
EVALUATION results
Published: 15/12/2022
Deadline: 25/04/2023
Available budget: EUR 49 000 000
The results of the evaluation are as follows:
Number of proposals submitted (including proposals transferred from or to other calls): 112
Number of inadmissible proposals: 0
Number of ineligible proposals: 0
Number of above-threshold proposals: 91
Total budget requested for above-threshold proposals: 422,251,119.57 €
We recently informed the applicants about the evaluation results for their proposals.
For questions, please contact the Research Enquiry Service.
PROPOSAL NUMBERS
Call HORIZON-JU-SNS-2023 has closed on the 25 April 2023 at 17.00.00.
112 proposals have been submitted.
The breakdown per topic is:
- HORIZON-JU-SNS-2023-STREAM-B-01-01: 34 proposals
- HORIZON-JU-SNS-2023-STREAM-B-01-02: 26 proposals
- HORIZON-JU-SNS-2023-STREAM-B-01-03: 17 proposals
- HORIZON-JU-SNS-2023-STREAM-B-01-04: 13 proposals
- HORIZON-JU-SNS-2023-STREAM-B-01-05: 6 proposals
- HORIZON-JU-SNS-2023-STREAM-B-01-06: 4 proposals
- HORIZON-JU-SNS-2023-STREAM-C-01-01: 4 proposals
- HORIZON-JU-SNS-2023-STREAM-CSA-01: 1 proposal
- HORIZON-JU-SNS-2023-STREAM-D-01-01: 7 proposals.
Evaluation results are expected to be communicated in July 2023.
PROPOSAL NUMBERS
Call HORIZON-JU-SNS-2023 has closed on the 25 April 2023 at 17.00.00.
112 proposals have been submitted.
The breakdown per topic is:
- HORIZON-JU-SNS-2023-STREAM-B-01-01: 34 proposals
- HORIZON-JU-SNS-2023-STREAM-B-01-02: 26 proposals
- HORIZON-JU-SNS-2023-STREAM-B-01-03: 17 proposals
- HORIZON-JU-SNS-2023-STREAM-B-01-04: 13 proposals
- HORIZON-JU-SNS-2023-STREAM-B-01-05: 6 proposals
- HORIZON-JU-SNS-2023-STREAM-B-01-06: 4 proposals
- HORIZON-JU-SNS-2023-STREAM-C-01-01: 4 proposals
- HORIZON-JU-SNS-2023-STREAM-CSA-01: 1 proposal
- HORIZON-JU-SNS-2023-STREAM-D-01-01: 7 proposals.
Evaluation results are expected to be communicated in July 2023.
Following theCouncil Implementing Decision (EU) 2022/2506, as of 16th December 2022, no legal commitments (including the grant agreement itself as well as subcontracts, purchase contracts, financial support to third parties etc.) can be signed with Hungarian public interest trusts established under Hungarian Act IX of 2021 or any entity they maintain.
Affected entities may continue to apply to calls for proposals. However, in case the Council measures are not lifted, such entities are not eligible to participate in any funded role (beneficiaries, affiliated entities, subcontractors, recipients of financial support to third parties). In this case, co-applicants will be invited to remove or replace that entity /or to change its status into associated partner. Tasks and budget may be redistributed accordingly.
Following theCouncil Implementing Decision (EU) 2022/2506, as of 16th December 2022, no legal commitments (including the grant agreement itself as well as subcontracts, purchase contracts, financial support to third parties etc.) can be signed with Hungarian public interest trusts established under Hungarian Act IX of 2021 or any entity they maintain.
Affected entities may continue to apply to calls for proposals. However, in case the Council measures are not lifted, such entities are not eligible to participate in any funded role (beneficiaries, affiliated entities, subcontractors, recipients of financial support to third parties). In this case, co-applicants will be invited to remove or replace that entity /or to change its status into associated partner. Tasks and budget may be redistributed accordingly.
Please note that the funding rates in this topic are:100% for non-for-profit organizationsand90% with respect to for-profit organizations. Unfortunately, the maximum funding rate in the budget table is set to 100%. We kindly ask allfor-profit organizationsto make a manual calculation andrequest only 90% of the budget.
Please note that the funding rates in this topic are:100% for non-for-profit organizationsand90% with respect to for-profit organizations. Unfortunately, the maximum funding rate in the budget table is set to 100%. We kindly ask allfor-profit organizationsto make a manual calculation andrequest only 90% of the budget.
Opening date: 2023-01-17 (3 years ago)
Closing date: 2023-04-25 (2 years ago)
Procedure: single-stage
Budget: 15,000,000
Expected grants: 3
Contribution: 5,000,000 - 5,000,000
This call topic has been appended 12 times by the EC with news.
-
2023-07-31
evaluation results (corrigendum):publish... -
2023-07-31
evaluation results published: 15/12/2022... -
2023-07-31
evaluation results (corrigendum):publish... -
2023-07-31
evaluation results published: 15/12/2022... -
2023-04-26
proposal numberscall horizon-ju-sns-2023... -
2023-04-26
proposal numberscall horizon-ju-sns-2023... -
2023-03-21
following thecouncil implementing decisi... -
2023-03-21
following thecouncil implementing decisi... -
2023-01-17
please note that the funding rates in th... -
2023-01-17
the submission session is now available... -
2023-01-17
please note that the funding rates in th... -
2023-01-17
the submission session is now available...
HORIZON-JU-SNS-2023
Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.
There are 8 other topics in this call:
Showing the latest information. Found 3 versions of this call topic in the F&T portal.
Information from
- 2024-11-04_17-25-38
- 2024-09-30_21-22-23
- 2024-07-04_15-01-30
Check the differences between the versions.
Annotations
Events
Events are added by the ideal-ist NCP community and are hand-picked. If you would like to suggest an event, please contact idealist@ffg.at.
Call topic timeline
-
Work programme available
- 3 years agoThe call topics are published first in the Work Programme, which is available a while before the call opens. By following up the Work Programme publications, you can get a headstart.
-
Opening date
- 3 years agoThe call opened for submissions.
-
Closing date
- 2 years agoDeadline for submitting a project.
-
Time to inform applicants Estimate
- 2 years agoThe maximum time to inform applicants (TTI) of the outcome of the evaluation is five months from the call closure date.
-
Sign grant agreement Estimate
- 2 years agoThe maximum time to sign grant agreements (TTG) is three months from the date of informing applicants.
-
Publication date
- 1 year agoThe call was first imported in TopicTree.
-
Today
Funded Projects
Loading...
Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)