HORIZON-JU-SNS-2023-STREAM-B-01-03

Communication Infrastructure Technologies and Devices -

About the connections

The graph above was generated based on the following links

Call text (as on F&T portal)

View on F&T portal
Expected Outcome:

The target outcomes address:

  • Development of new access networks, focused on different set of devices, expanding the reach of 6G and reducing its environmental impact. An important outcome relates to solutions making it possible to expand network coverage to 3D coverage scenarios, with troposphere networks allowing to overcome the limitations of today’s 2D networks.
  • Advances in long distance communications, able to provide solutions for diverse sets of high mobility, large area, scenarios, such as UAVs.
  • Availability of solutions enabling the “network of network” approach with capability to support ultra-short distance connectivity scenarios, based on nano things networking, and applicability to specific domains like health care or automotive.
  • Ultra-low energy solutions for devices, including battery free device capabilities.
  • Ultra-low energy and ultra-high capacity solutions for access or end to end connectivity based on optical technologies and their integration within a wireless-optical connectivity continuum.
Objective:

Please refer to the "Specific Challenges and Objectives" section for Stream B in the Work Programme, available under ‘Topic Conditions and Documents - Additional Documents’.

Scope:

The scope covers the design of new systems and components for 6G networks. The focus of this Strand is on several complementary issues mentioned below and applicants may select one or more of these issues:

  • Troposphere Networking: The work addresses Tropospheric Networking as the new network serving all the “things” between the ground and ~20 km altitude and focus on control and communication services for the drone, urban air mobility (future urban transportation systems that move people by air), balloon, aircraft, etc. Application scenarios covering both airplanes and UAVs should be defined and both data and control requirements identified. Solutions that rely on novel device to device (D2D), mesh, and cellular solutions for different types of mobility nodes may be considered, including approaches for unified RAN cellular (or cell free) coverage for both air and ground coverage, including high altitude dynamic beam steering, and efficient network level mobility management. This topic has a transformative potential for the infrastructure strand in general and is considered particularly challenging if supported only by terrestrial technologies.
  • Integration of Optical and Wireless Technologies of advanced light related technologies such as LEDs (light-emitting diodes), lasers, outdoor point-to-point devices (FSO — Free Space Optics), point-to-multipoint commercial applications (Li-Fi — Light Fidelity) or between devices (OCC – Optical Camera Communication) and Fiber Wireless (Fi-Wi), for the design of novel communication schemes, system architectures and protocols, in order to fully integrate these technologies in the communication infrastructure. Hybrid RF/FSO communications and sensing techniques to underpin selected verticals and applications are in scope.
  • Nano-Things Networking: The work addresses technologies to extend connectivity towards micro things, towards the realisation of nano-communications extending the reach of smart control to the level of small/tiny things, including molecules and cells. Materials with software-defined electromagnetic behaviour enable applications, paving the way for programmable wireless environments. The focus is on nanomaterials and nano-network architecture components (nodes, controllers, gateways) opening new prospects of usage of nano-scale things. At the PHY Layer, graphene antennas enable nano-communication within the 0.1 - 10 THz spectral window, which promises unprecedented communication data rates despite the nano-scale. At the MAC Layer, pivotal protocols could target Body Area Network (BAN) applications notably for health and self-monitoring and adapting industrial materials. This research topic should lead to potential transformative impact across the communication ecosystem.
  • Development of low-energy communication solutions: This includes system solutions that consider zero-energy, battery-free and/or disposable devices. The solutions should be able to present system and device integrated solutions relying on the principles of minimising the environmental impact of the expected billions of sensors, including concepts as RF and environmental energy harvesting, simultaneous power transfer and communications systems, eco-friendly and degradable devices (and the optimisation of the 6G system required to fully exploit these devices notwithstanding their expected limitations, providing a joint network/device design paradigm).
  • Packet optical technologies for 6G radio networks: Solutions for optical networks to support 6G cellular networks are being pursued, targeting high-speed, fast reconfigurable, optical enabled radio systems considering integrated solutions for backhaul and fronthaul communication. The focus should be on technologies which will be effective in operational conditions in highly dynamic and customizable environments, guaranteeing its programmability while minimising unnecessary opto-electronics transitions. The research scope covers devices for RAN, including optical processing as an enabling technology, programmable devices, wavelength selectable optical switches, tuneable lasers and filters, as well as an efficient utilisation of packet and optical (spectrum and spatial) resources. It also includes the integration of the aforementioned solutions in an intelligent software management system, able to simplify and optimize the network (e.g. by avoiding IP routing, and low power consumption reconfiguration). It may also include novel switching paradigms.

News flashes

2023-07-31

EVALUATION results (corrigendum):

Published: 15/12/2022

Deadline: 25/04/2023

Available budget: EUR 132 million

The results of the evaluation are as follows:

Number of proposals submitted (including proposals transferred from or to other calls): 112

Number of inadmissible proposals: 0

Number of ineligible proposals: 0

Number of above-threshold proposals: 91

Total budget requested for above-threshold proposals: EUR 422,251,119.57

We recently informed the applicants about the evaluation results for their proposals.

For questions, please contact the Research Enquiry Service.

2023-07-31

EVALUATION results

Published: 15/12/2022

Deadline: 25/04/2023

Available budget: EUR 49 000 000

The results of the evaluation are as follows:

Number of proposals submitted (including proposals transferred from or to other calls): 112

Number of inadmissible proposals: 0

Number of ineligible proposals: 0

Number of above-threshold proposals: 91

Total budget requested for above-threshold proposals: 422,251,119.57 €

We recently informed the applicants about the evaluation results for their proposals.

For questions, please contact the Research Enquiry Service.

2023-07-31

EVALUATION results (corrigendum):

Published: 15/12/2022

Deadline: 25/04/2023

Available budget: EUR 132 million

The results of the evaluation are as follows:

Number of proposals submitted (including proposals transferred from or to other calls): 112

Number of inadmissible proposals: 0

Number of ineligible proposals: 0

Number of above-threshold proposals: 91

Total budget requested for above-threshold proposals: EUR 422,251,119.57

We recently informed the applicants about the evaluation results for their proposals.

For questions, please contact the Research Enquiry Service.

2023-07-31

EVALUATION results

Published: 15/12/2022

Deadline: 25/04/2023

Available budget: EUR 49 000 000

The results of the evaluation are as follows:

Number of proposals submitted (including proposals transferred from or to other calls): 112

Number of inadmissible proposals: 0

Number of ineligible proposals: 0

Number of above-threshold proposals: 91

Total budget requested for above-threshold proposals: 422,251,119.57 €

We recently informed the applicants about the evaluation results for their proposals.

For questions, please contact the Research Enquiry Service.

2023-04-26

PROPOSAL NUMBERS

Call HORIZON-JU-SNS-2023 has closed on the 25 April 2023 at 17.00.00.

112 proposals have been submitted.

The breakdown per topic is:

  • HORIZON-JU-SNS-2023-STREAM-B-01-01: 34 proposals
  • HORIZON-JU-SNS-2023-STREAM-B-01-02: 26 proposals
  • HORIZON-JU-SNS-2023-STREAM-B-01-03: 17 proposals
  • HORIZON-JU-SNS-2023-STREAM-B-01-04: 13 proposals
  • HORIZON-JU-SNS-2023-STREAM-B-01-05: 6 proposals
  • HORIZON-JU-SNS-2023-STREAM-B-01-06: 4 proposals
  • HORIZON-JU-SNS-2023-STREAM-C-01-01: 4 proposals
  • HORIZON-JU-SNS-2023-STREAM-CSA-01: 1 proposal
  • HORIZON-JU-SNS-2023-STREAM-D-01-01: 7 proposals.

Evaluation results are expected to be communicated in July 2023.

2023-04-26

PROPOSAL NUMBERS

Call HORIZON-JU-SNS-2023 has closed on the 25 April 2023 at 17.00.00.

112 proposals have been submitted.

The breakdown per topic is:

  • HORIZON-JU-SNS-2023-STREAM-B-01-01: 34 proposals
  • HORIZON-JU-SNS-2023-STREAM-B-01-02: 26 proposals
  • HORIZON-JU-SNS-2023-STREAM-B-01-03: 17 proposals
  • HORIZON-JU-SNS-2023-STREAM-B-01-04: 13 proposals
  • HORIZON-JU-SNS-2023-STREAM-B-01-05: 6 proposals
  • HORIZON-JU-SNS-2023-STREAM-B-01-06: 4 proposals
  • HORIZON-JU-SNS-2023-STREAM-C-01-01: 4 proposals
  • HORIZON-JU-SNS-2023-STREAM-CSA-01: 1 proposal
  • HORIZON-JU-SNS-2023-STREAM-D-01-01: 7 proposals.

Evaluation results are expected to be communicated in July 2023.

2023-03-21

Following theCouncil Implementing Decision (EU) 2022/2506, as of 16th December 2022, no legal commitments (including the grant agreement itself as well as subcontracts, purchase contracts, financial support to third parties etc.) can be signed with Hungarian public interest trusts established under Hungarian Act IX of 2021 or any entity they maintain.

Affected entities may continue to apply to calls for proposals. However, in case the Council measures are not lifted, such entities are not eligible to participate in any funded role (beneficiaries, affiliated entities, subcontractors, recipients of financial support to third parties). In this case, co-applicants will be invited to remove or replace that entity /or to change its status into associated partner. Tasks and budget may be redistributed accordingly.

2023-03-21

Following theCouncil Implementing Decision (EU) 2022/2506, as of 16th December 2022, no legal commitments (including the grant agreement itself as well as subcontracts, purchase contracts, financial support to third parties etc.) can be signed with Hungarian public interest trusts established under Hungarian Act IX of 2021 or any entity they maintain.

Affected entities may continue to apply to calls for proposals. However, in case the Council measures are not lifted, such entities are not eligible to participate in any funded role (beneficiaries, affiliated entities, subcontractors, recipients of financial support to third parties). In this case, co-applicants will be invited to remove or replace that entity /or to change its status into associated partner. Tasks and budget may be redistributed accordingly.

2023-01-17

Please note that the funding rates in this topic are:100% for non-for-profit organizationsand90% with respect to for-profit organizations. Unfortunately, the maximum funding rate in the budget table is set to 100%. We kindly ask allfor-profit organizationsto make a manual calculation andrequest only 90% of the budget.

2023-01-17
The submission session is now available for: HORIZON-JU-SNS-2023-STREAM-B-01-03(HORIZON-JU-RIA), HORIZON-JU-SNS-2023-STREAM-B-01-05(HORIZON-JU-RIA), HORIZON-JU-SNS-2023-STREAM-B-01-01(HORIZON-JU-RIA), HORIZON-JU-SNS-2023-STREAM-D-01-01(HORIZON-JU-IA), HORIZON-JU-SNS-2023-STREAM-B-01-02(HORIZON-JU-RIA), HORIZON-JU-SNS-2023-STREAM-B-01-04(HORIZON-JU-RIA), HORIZON-JU-SNS-2023-STREAM-B-01-06(HORIZON-JU-RIA), HORIZON-JU-SNS-2023-STREAM-CSA-01(HORIZON-JU-CSA), HORIZON-JU-SNS-2023-STREAM-C-01-01(HORIZON-JU-RIA)
2023-01-17

Please note that the funding rates in this topic are:100% for non-for-profit organizationsand90% with respect to for-profit organizations. Unfortunately, the maximum funding rate in the budget table is set to 100%. We kindly ask allfor-profit organizationsto make a manual calculation andrequest only 90% of the budget.

2023-01-17
The submission session is now available for: HORIZON-JU-SNS-2023-STREAM-B-01-03(HORIZON-JU-RIA), HORIZON-JU-SNS-2023-STREAM-B-01-05(HORIZON-JU-RIA), HORIZON-JU-SNS-2023-STREAM-B-01-01(HORIZON-JU-RIA), HORIZON-JU-SNS-2023-STREAM-D-01-01(HORIZON-JU-IA), HORIZON-JU-SNS-2023-STREAM-B-01-02(HORIZON-JU-RIA), HORIZON-JU-SNS-2023-STREAM-B-01-04(HORIZON-JU-RIA), HORIZON-JU-SNS-2023-STREAM-B-01-06(HORIZON-JU-RIA), HORIZON-JU-SNS-2023-STREAM-CSA-01(HORIZON-JU-CSA), HORIZON-JU-SNS-2023-STREAM-C-01-01(HORIZON-JU-RIA)
call topic details
Call status: Closed
Opening date: 2023-01-17 (3 years ago)
Closing date: 2023-04-25 (2 years ago)
Procedure: single-stage

Budget: 12,000,000
Expected grants: 3
Contribution: 4,000,000 - 4,000,000
News flashes

This call topic has been appended 12 times by the EC with news.

  • 2023-07-31
    evaluation results (corrigendum):publish...
  • 2023-07-31
    evaluation results published: 15/12/2022...
  • 2023-07-31
    evaluation results (corrigendum):publish...
  • 2023-07-31
    evaluation results published: 15/12/2022...
  • 2023-04-26
    proposal numberscall horizon-ju-sns-2023...
  • 2023-04-26
    proposal numberscall horizon-ju-sns-2023...
  • 2023-03-21
    following thecouncil implementing decisi...
  • 2023-03-21
    following thecouncil implementing decisi...
  • 2023-01-17
    please note that the funding rates in th...
  • 2023-01-17
    the submission session is now available...
  • 2023-01-17
    please note that the funding rates in th...
  • 2023-01-17
    the submission session is now available...
Call

HORIZON-JU-SNS-2023

Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.

There are 8 other topics in this call:

Source information

Showing the latest information. Found 3 versions of this call topic in the F&T portal.

Information from

  • 2024-11-04_17-25-38
  • 2024-09-30_21-22-23
  • 2024-03-30_20-31-34

Check the differences between the versions.

Annotations

You must be logged in to add annotations
No annotations yet

Events

This is just a very first implementation, better visualisation coming

Events are added by the ideal-ist NCP community and are hand-picked. If you would like to suggest an event, please contact idealist@ffg.at.

Call topic timeline

What phase of the topic timeline are we in? This timeline contains some suggestions on what are realistic actions you should or could take at this moment. The timeline is based on the information provided by the call topic.
  1. Work programme available

    - 3 years ago

    The call topics are published first in the Work Programme, which is available a while before the call opens. By following up the Work Programme publications, you can get a headstart.

  2. Opening date

    - 3 years ago

    The call opened for submissions.

  3. Closing date

    - 2 years ago

    Deadline for submitting a project.

  4. Time to inform applicants Estimate

    - 2 years ago

    The maximum time to inform applicants (TTI) of the outcome of the evaluation is five months from the call closure date.

  5. Sign grant agreement Estimate

    - 2 years ago

    The maximum time to sign grant agreements (TTG) is three months from the date of informing applicants.

  6. Publication date

    - 1 year ago

    The call was first imported in TopicTree.

  7. Today

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal