HORIZON-CL4-2023-SPACE-01-22

New space transportation solutions and services -

Call text (as on F&T portal)

View on F&T portal

Expected Outcome:

Projects are expected to contribute to the following outcomes:

  • Contribute to EU Green Deal objective through the reduction of the environmental impact of space transportation and to be prepared for the upcoming REACH regulations, especially with respect to the use of hydrazine and its derivatives, focusing on commercial market as a driver for business growth.
  • Contribute to expand commercial space transportation offer and services with new space transportation solutions. The objective is to contribute to double the accessible new space transportation service market to European industry by 2030.
  • Design and performance studies as well as business cases (demonstration of economical viability).
  • Matured technologies up to TRL5-6 including functional test on ground.

These outcomes will contribute to enhance the sector competitiveness, in line with the Expected Impact of the destination.

Scope:

There are emerging opportunities in space transportation out of which some are recently started to being seized by European actors characterised by new uses of space (e.g. small satellites, larger constellations and payload recovery) new destinations (e.g. direct GEO, re-entry from LEO).

The expected proposed activities should contribute to the maturation up to TRL5-6 of enabling new technologies and subsystems (including common building blocks) in the field of green propulsion, micro launchers and associated launch facilities, kick stage, orbital propulsion and distancing, attitude and landing, re-entry solutions, smart satellite deployment systems/dispensers, for space transportation including also new routes up to Lunar orbit or surface.

The maturation could go up to subsystem and system [1] level technology demonstration and must include at least one of the following areas and linked technologies:

  • Technologies for recovery of Space Transport vehicles elements:
    • Technologies to be matured in order to allow the re-entry of launcher elements through the entire atmospheric flight domain from in-orbit up to soft landing on earth: Controlled hypersonic flight, the highly dynamic decent and landing maneuvre, aerodynamics and aerothermal design, attitude control system, actuators and propulsion system, advanced GNC design, propellant management/sloshing and system transient dynamics, low cost re-entry protection system, low cost, low weight and high performance structures.
    • Technologies enabling recovery, high reuse and limited refurbishment need of launcher fairing: low cost and scalable concept design, structure with early consideration of manufacturing, distancing devices, recovery means solution, demonstrators for recovery and maintenance/overhaul.
    • Technologies maturation for micro launcher first stage and booster stage. reusability concepts that have a strong potential for cost reduction.
  • Space Transportation technologies in support to In-orbit servicing systems:
    • Technologies allowing the in orbit reuse of a green and sustainable cryogenic elements for multiple operations and missions in-orbit: green propulsion and green Kick stage, versatile operation of cryogenic upper stages as on-orbits platforms, cryogenic propellant management for long duration missions, high multi-restart capability for in-space cryogenic engines, in-orbits cryogenics tanks, electric pumps for in-space propulsion, in-space refueling for cryogenic systems, interface and connection to in-space solutions, innovative low cost materials for in-space applications, attitude control systems (RACS), advanced avionics, GNC (Guidance, Navigation and Control).

All the activities should be complementary and coherent with the ESA on-going or future activities in particular those decided at the last ESA Ministerial held in November 2019 and planned to be decided at the ESA Ministerial planned in November 2022.

Proposals should provide all IPR dependencies and dependencies with other on-going activities, and detail the implementation, the reporting and the organisational as well as steering measures that will be taken to ensure that the proposed activities can be implemented and can achieve all the expected outcomes within the project schedule and budget.

In this topic the integration of the gender dimension (sex and gender analysis) in research and innovation content is not a mandatory requirement.

null

Activities are expected to achieve TRL 5-6 by the end of the project – The reference TRL definition is the ISO 16290:2013 applicable to the space sector.

[1] This excludes full launcher development

News flashes

2023-07-24

 An overview of the HORIZON-CL4-2023-SPACE-01 evaluation results (Flash Call Info) is now available under the link.

2023-07-24

 An overview of the HORIZON-CL4-2023-SPACE-01 evaluation results (Flash Call Info) is now available under the link.

2023-03-28

 

Call HORIZON-CL4-2023-SPACE-01 has closed on the 28/03/2023.

 

142 proposals have been submitted.

 

The breakdown per topic is:

• HORIZON-CL4-2023-SPACE-01-11: 11 proposals

• HORIZON-CL4-2023-SPACE-01-12: 38 proposals

• HORIZON-CL4-2023-SPACE-01-13: 1 proposal

• HORIZON-CL4-2023-SPACE-01-21: 1 proposal

• HORIZON-CL4-2023-SPACE-01-22: 17 proposals

• HORIZON-CL4-2023-SPACE-01-23: 4 proposals

• HORIZON-CL4-2023-SPACE-01-31: 4 proposals

• HORIZON-CL4-2023-SPACE-01-32: 5 proposals

• HORIZON-CL4-2023-SPACE-01-33: 0 proposals

• HORIZON-CL4-2023-SPACE-01-34: 3 proposals

• HORIZON-CL4-2023-SPACE-01-62: 7 proposals

• HORIZON-CL4-2023-SPACE-01-63: 1 proposal

• HORIZON-CL4-2023-SPACE-01-71: 37 proposals

• HORIZON-CL4-2023-SPACE-01-72: 13 proposals

 

Evaluation results are expected to be communicated in the 2nd half of July 2023.

 
2023-03-28

 

Call HORIZON-CL4-2023-SPACE-01 has closed on the 28/03/2023.

 

142 proposals have been submitted.

 

The breakdown per topic is:

• HORIZON-CL4-2023-SPACE-01-11: 11 proposals

• HORIZON-CL4-2023-SPACE-01-12: 38 proposals

• HORIZON-CL4-2023-SPACE-01-13: 1 proposal

• HORIZON-CL4-2023-SPACE-01-21: 1 proposal

• HORIZON-CL4-2023-SPACE-01-22: 17 proposals

• HORIZON-CL4-2023-SPACE-01-23: 4 proposals

• HORIZON-CL4-2023-SPACE-01-31: 4 proposals

• HORIZON-CL4-2023-SPACE-01-32: 5 proposals

• HORIZON-CL4-2023-SPACE-01-33: 0 proposals

• HORIZON-CL4-2023-SPACE-01-34: 3 proposals

• HORIZON-CL4-2023-SPACE-01-62: 7 proposals

• HORIZON-CL4-2023-SPACE-01-63: 1 proposal

• HORIZON-CL4-2023-SPACE-01-71: 37 proposals

• HORIZON-CL4-2023-SPACE-01-72: 13 proposals

 

Evaluation results are expected to be communicated in the 2nd half of July 2023.

 
2022-12-23
The submission session is now available for: HORIZON-CL4-2023-SPACE-01-63(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-33(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-32(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-34(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-62(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-72(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-31(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-71(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-23(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-21(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-22(HORIZON-RIA)
2022-12-23
The submission session is now available for: HORIZON-CL4-2023-SPACE-01-63(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-33(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-32(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-34(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-62(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-72(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-31(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-71(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-23(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-21(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-22(HORIZON-RIA)
2022-12-22
The submission session is now available for: HORIZON-CL4-2023-SPACE-01-63(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-33(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-11(HORIZON-IA), HORIZON-CL4-2023-SPACE-01-12(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-32(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-34(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-62(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-72(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-31(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-71(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-23(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-13(HORIZON-CSA)
2022-12-22
The submission session is now available for: HORIZON-CL4-2023-SPACE-01-63(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-33(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-11(HORIZON-IA), HORIZON-CL4-2023-SPACE-01-12(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-32(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-34(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-62(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-72(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-31(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-71(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-23(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-13(HORIZON-CSA)
call topic details
Call status: Closed
Opening date: 2022-12-22 (3 years ago)
Closing date: 2023-03-28 (3 years ago)
Procedure: single-stage

Budget: 23,100,000
Expected grants: 4
Contribution: 4,000,000 - 10,000,000
News flashes

This call topic has been appended 8 times by the EC with news.

  • 2023-07-24
     an overview of the horizon-cl4-202...
  • 2023-07-24
     an overview of the horizon-cl4-202...
  • 2023-03-28
     call horizon-cl4-2023-space-01 has...
  • 2023-03-28
     call horizon-cl4-2023-space-01 has...
  • 2022-12-23
    the submission session is now available...
  • 2022-12-23
    the submission session is now available...
  • 2022-12-22
    the submission session is now available...
  • 2022-12-22
    the submission session is now available...
Source information

Showing the latest information. Found 208 versions of this call topic in the F&T portal.

Information from

  • 2026-10-08_08-27-02
  • 2026-10-08_08-26-48
  • 2026-10-07_08-23-15
  • 2026-10-07_08-22-33
  • 2026-10-06_08-25-09
  • 2026-10-06_08-24-36
  • 2026-10-05_08-21-06
  • 2026-10-05_08-20-35
  • 2026-10-04_08-22-45
  • 2026-10-04_08-22-11
  • 2026-10-03_08-21-04
  • 2026-10-03_08-20-25
  • 2026-10-02_08-25-05
  • 2026-10-02_08-21-28
  • 2026-10-01_08-27-22
  • 2026-10-01_08-24-01
  • 2026-09-29_09-00-48
  • 2026-09-29_08-56-07
  • 2026-09-28_09-00-17
  • 2026-09-28_08-55-43
  • 2026-09-27_08-59-22
  • 2026-09-27_08-54-32
  • 2026-09-26_08-56-00
  • 2026-09-26_08-51-12
  • 2026-09-25_08-57-13
  • 2026-09-25_08-52-51
  • 2026-09-24_09-00-36
  • 2026-09-24_08-55-21
  • 2026-09-23_08-54-37
  • 2026-09-23_08-50-04
  • 2026-09-22_08-55-17
  • 2026-09-22_08-50-11
  • 2026-09-21_08-50-52
  • 2026-09-21_08-46-05
  • 2026-09-20_08-52-33
  • 2026-09-20_08-47-24
  • 2026-09-19_08-48-59
  • 2026-09-19_08-44-33
  • 2026-09-18_08-54-31
  • 2026-09-18_08-50-08
  • 2026-09-17_08-49-37
  • 2026-09-17_08-45-08
  • 2026-09-16_08-47-30
  • 2026-09-16_08-42-30
  • 2026-09-15_08-49-29
  • 2026-09-15_08-44-18
  • 2026-09-14_08-48-35
  • 2026-09-14_08-43-51
  • 2026-09-13_08-46-45
  • 2026-09-13_08-42-22
  • 2026-09-12_08-50-22
  • 2026-09-12_08-46-00
  • 2026-09-11_08-49-04
  • 2026-09-11_08-44-51
  • 2026-09-10_08-47-58
  • 2026-09-10_08-43-35
  • 2026-09-09_08-48-49
  • 2026-09-09_08-44-24
  • 2026-09-08_08-46-09
  • 2026-09-08_08-42-17
  • 2026-09-07_08-46-31
  • 2026-09-07_08-41-58
  • 2026-09-06_08-45-11
  • 2026-09-06_08-40-42
  • 2026-09-05_08-43-17
  • 2026-09-05_08-39-07
  • 2026-09-04_08-41-48
  • 2026-09-04_08-37-40
  • 2026-09-03_08-42-07
  • 2026-09-03_08-37-50
  • 2026-09-02_08-43-05
  • 2026-09-02_08-39-15
  • 2026-09-01_08-42-14
  • 2026-09-01_08-38-44
  • 2026-08-31_08-46-22
  • 2026-08-31_08-42-16
  • 2026-08-30_08-35-47
  • 2026-08-30_08-31-47
  • 2026-08-29_08-38-31
  • 2026-08-29_08-34-38
  • 2026-08-28_08-42-41
  • 2026-08-28_08-38-19
  • 2026-08-27_08-31-14
  • 2026-08-27_08-26-59
  • 2026-08-25_08-37-37
  • 2026-08-25_08-33-53
  • 2026-08-24_08-33-05
  • 2026-08-24_08-29-08
  • 2026-08-23_08-30-47
  • 2026-08-23_08-26-49
  • 2026-08-22_08-31-46
  • 2026-08-22_08-28-05
  • 2026-08-21_08-25-20
  • 2026-08-21_08-22-03
  • 2026-08-20_08-29-50
  • 2026-08-20_08-26-48
  • 2026-08-19_08-28-38
  • 2026-08-19_08-25-50
  • 2026-08-18_08-23-26
  • 2026-08-18_08-20-41
  • 2026-08-17_08-25-37
  • 2026-08-17_08-22-06
  • 2026-08-16_08-19-40
  • 2026-08-16_08-16-57
  • 2026-08-14_08-23-49
  • 2026-08-14_08-20-02
  • 2026-08-13_08-20-40
  • 2026-08-13_08-17-22
  • 2026-08-12_08-20-05
  • 2026-08-12_08-16-16
  • 2026-08-11_08-21-13
  • 2026-08-11_08-18-16
  • 2026-08-10_08-17-41
  • 2026-08-10_08-14-41
  • 2026-08-09_08-16-45
  • 2026-08-09_08-14-08
  • 2026-08-08_08-15-42
  • 2026-08-08_08-12-45
  • 2026-08-07_08-14-05
  • 2026-08-07_08-11-28
  • 2026-08-06_08-14-42
  • 2026-08-06_08-12-05
  • 2026-08-05_08-16-24
  • 2026-08-05_08-13-40
  • 2026-08-04_08-16-29
  • 2026-08-04_08-13-58
  • 2026-08-03_08-15-28
  • 2026-08-03_08-11-57
  • 2026-08-02_08-13-26
  • 2026-08-02_08-10-25
  • 2026-08-01_08-14-33
  • 2026-08-01_08-12-03
  • 2026-07-31_08-13-41
  • 2026-07-31_08-10-29
  • 2026-07-30_08-11-53
  • 2026-07-30_08-08-41
  • 2026-07-29_08-13-12
  • 2026-07-29_08-10-53
  • 2026-07-28_08-12-56
  • 2026-07-28_08-09-47
  • 2026-07-27_08-07-12
  • 2026-07-27_08-04-54
  • 2026-07-26_08-05-28
  • 2026-07-26_08-02-25
  • 2026-07-25_08-05-34
  • 2026-07-25_08-03-08
  • 2026-07-24_08-05-57
  • 2026-07-24_08-03-38
  • 2026-07-23_08-05-54
  • 2026-07-23_08-03-30
  • 2026-07-22_08-08-07
  • 2026-07-22_08-05-06
  • 2026-07-21_08-04-33
  • 2026-07-21_08-01-41
  • 2026-07-20_08-04-25
  • 2026-07-20_08-02-07
  • 2026-07-19_08-05-35
  • 2026-07-19_08-02-45
  • 2026-07-18_08-05-15
  • 2026-07-18_08-02-10
  • 2026-07-17_08-03-52
  • 2026-07-17_08-01-28
  • 2026-07-16_07-45-08
  • 2026-07-16_07-43-23
  • 2026-07-15_07-44-56
  • 2026-07-15_07-42-59
  • 2026-07-14_07-44-07
  • 2026-07-14_07-41-48
  • 2026-07-13_07-44-32
  • 2026-07-13_07-42-42
  • 2026-07-12_07-44-03
  • 2026-07-12_07-42-27
  • 2026-07-11_07-42-56
  • 2026-07-11_07-41-10
  • 2026-07-10_07-43-19
  • 2026-07-10_07-41-13
  • 2026-07-09_07-43-03
  • 2026-07-09_07-41-16
  • 2026-07-08_07-42-46
  • 2026-07-08_07-41-03
  • 2026-07-07_07-42-47
  • 2026-07-07_07-40-42
  • 2026-07-06_07-43-30
  • 2026-07-06_07-41-19
  • 2026-07-05_07-39-25
  • 2026-07-05_07-37-43
  • 2026-07-04_07-41-17
  • 2026-07-04_07-39-27
  • 2026-07-03_07-41-07
  • 2026-07-03_07-39-00
  • 2026-07-02_07-39-46
  • 2026-07-02_07-38-09
  • 2026-07-01_08-02-50
  • 2026-07-01_08-01-07
  • 2026-06-30_09-49-17
  • 2026-06-30_08-00-14
  • 2026-06-29_11-35-08
  • 2026-06-29_08-03-41
  • 2026-06-28_09-32-18
  • 2026-06-28_07-57-37
  • 2026-06-27_09-32-51
  • 2026-06-27_07-57-59
  • 2026-06-27_07-56-00
  • 2026-02-18_07-04-48
  • 2025-06-07_03-33-29
  • 2024-11-04_17-25-46
  • 2024-09-30_21-22-15
  • 2024-03-30_14-18-53

Check the differences between the versions.

Annotations

You must be logged in to add annotations
No annotations yet

Events

Hand-picked events relevant to this call topic.

No events yet

There are currently no events linked to this call topic.

Timeline

Track where this call stands in its lifecycle, from work programme to grant signature, and see what's likely to happen next.

Call published · 30 Sep 2024 (2 years ago)

All expected milestones for this call have passed.

Today

Work programme published

07 Oct 2022 · est.

Call opens

22 Dec 2022

Call closes

28 Mar 2023

Outcome expected

28 Aug 2023 · est.

Grant agreement signed

28 Nov 2023 · est.

Call published

30 Sep 2024

Preparation Open for submission Evaluation Grant preparation Not yet reached
  1. Work programme published Estimated

    07 Oct 2022 · 4 years ago

    Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.

  2. Call opens

    22 Dec 2022 · 3 years ago

    Submissions can be made from this date.

  3. Call closes

    28 Mar 2023 · 3 years ago

    Deadline to submit a proposal.

  4. Outcome expected Estimated

    28 Aug 2023 · 3 years ago

    The maximum time to inform applicants of the evaluation outcome is five months after the call closes.

  5. Grant agreement signed Estimated

    28 Nov 2023 · 2 years ago

    The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.

  6. Call published

    30 Sep 2024 · 2 years ago

    This topic was first published in TopicTree.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Ecosystem bubbles

This call topic is part of the following thematic bubbles.

Not part of a bubble yet

This call topic has not been grouped into an ecosystem bubble.

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal