HORIZON-CL4-2023-SPACE-01-21

Low cost high thrust propulsion for European strategic space launchers - technologies maturation including ground system tests -

Call text (as on F&T portal)

View on F&T portal

Expected Outcome:

Projects are expected to contribute to the following outcomes:

Contribution to the overarching objective of launch cost/price reduction by 50% by 2030 (with respect to A6/VegaC cost/price 2021 economic conditions), for the benefit of EU Space programmes implementation and going towards reinforcing Europe‘s independent capacity to access to space.

  • Innovation acceleration of enabling technologies (maturing, prototyping, on ground tests)
  • Selection of most promising technologies for cost-reduction possibilities in the current European launchers
  • Cost reduction investigation and demonstration.

These outcomes will contribute to enhance Europe's open strategic autonomy and sector competitiveness, in line with the Expected Impact of the destination.

Scope:

Cost reduction and improving flexibility of European launch systems are the main challenges in order to foster European industry competitiveness on the global market.

The propulsion systems represent a significant part of launch system costs. It is necessary to mature new or optimised low cost effective (lower number of parts, better operability), high performance (high thrust to weight ratio, high specific impulse) and green propulsion concepts, technologies and propellants for high thrust engines.

The activities should address:

  • Maturation of enabling technologies, building blocks, tools and processes including maintenance/overhaul and safety, up to TRL5/6 and subsystem tests including prototyping and integrated ground tests at subsystems level by 2025;
  • Demonstration of the above technologies by subsystems and engine on-ground demonstration tests by 2026 to reach TRL 7.

The matured technologies, building blocks, tools and processes should be applicable to strategic launchers able to launch EU Space Programme components, with the objective of enabling operational capacities by 2030 and preferably earlier for current launch solutions. The tests should be appropriate to this objective.

The proposed activities must also support Europe's non-dependence objective and include the assessment of costs reduction investigations and test results towards the overarching objective mentioned in the expected outcomes.

The activities will address one or several of the following areas:

  • low-cost propulsion,
  • throttlability,
  • HMS - Health Monitoring Systems,
  • controllers taking advantage of AI,
  • reduced number of parts with extensive application of Additive manufacturing, or new composite technologies,
  • maintenance/overhaul,
  • associated fluidics.

The activities should include as many as technologies possible in each area to maximise the number of matured technologies to be submitted to integrated tests at subsystem level and integration of subsystem (all technologies together) for engine firing tests by 2026.

All the activities should be complementary and coherent with the ESA on-going or future activities in particular those decided at the last ESA Ministerial held in November 2019 and planned to be decided at the ESA Ministerial planned in November 2022.

Proposals should provide all IPR dependencies and dependencies with other on-going activities, and detail the implementation, the reporting and the organisational as well as steering measures that will be taken to ensure that the proposed activities can be implemented and can achieve all the expected outcomes within the project schedule and budget.

In this topic the integration of the gender dimension (sex and gender analysis) in research and innovation content is not a mandatory requirement.

null

Activities are expected to achieve TRL 7 by the end of the project – The reference TRL definition is the ISO 16290:2013 applicable to the space sector.

News flashes

2023-07-24

 An overview of the HORIZON-CL4-2023-SPACE-01 evaluation results (Flash Call Info) is now available under the link.

2023-07-24

 An overview of the HORIZON-CL4-2023-SPACE-01 evaluation results (Flash Call Info) is now available under the link.

2023-03-28

 

Call HORIZON-CL4-2023-SPACE-01 has closed on the 28/03/2023.

 

142 proposals have been submitted.

 

The breakdown per topic is:

• HORIZON-CL4-2023-SPACE-01-11: 11 proposals

• HORIZON-CL4-2023-SPACE-01-12: 38 proposals

• HORIZON-CL4-2023-SPACE-01-13: 1 proposal

• HORIZON-CL4-2023-SPACE-01-21: 1 proposal

• HORIZON-CL4-2023-SPACE-01-22: 17 proposals

• HORIZON-CL4-2023-SPACE-01-23: 4 proposals

• HORIZON-CL4-2023-SPACE-01-31: 4 proposals

• HORIZON-CL4-2023-SPACE-01-32: 5 proposals

• HORIZON-CL4-2023-SPACE-01-33: 0 proposals

• HORIZON-CL4-2023-SPACE-01-34: 3 proposals

• HORIZON-CL4-2023-SPACE-01-62: 7 proposals

• HORIZON-CL4-2023-SPACE-01-63: 1 proposal

• HORIZON-CL4-2023-SPACE-01-71: 37 proposals

• HORIZON-CL4-2023-SPACE-01-72: 13 proposals

 

Evaluation results are expected to be communicated in the 2nd half of July 2023.

 
2023-03-28

 

Call HORIZON-CL4-2023-SPACE-01 has closed on the 28/03/2023.

 

142 proposals have been submitted.

 

The breakdown per topic is:

• HORIZON-CL4-2023-SPACE-01-11: 11 proposals

• HORIZON-CL4-2023-SPACE-01-12: 38 proposals

• HORIZON-CL4-2023-SPACE-01-13: 1 proposal

• HORIZON-CL4-2023-SPACE-01-21: 1 proposal

• HORIZON-CL4-2023-SPACE-01-22: 17 proposals

• HORIZON-CL4-2023-SPACE-01-23: 4 proposals

• HORIZON-CL4-2023-SPACE-01-31: 4 proposals

• HORIZON-CL4-2023-SPACE-01-32: 5 proposals

• HORIZON-CL4-2023-SPACE-01-33: 0 proposals

• HORIZON-CL4-2023-SPACE-01-34: 3 proposals

• HORIZON-CL4-2023-SPACE-01-62: 7 proposals

• HORIZON-CL4-2023-SPACE-01-63: 1 proposal

• HORIZON-CL4-2023-SPACE-01-71: 37 proposals

• HORIZON-CL4-2023-SPACE-01-72: 13 proposals

 

Evaluation results are expected to be communicated in the 2nd half of July 2023.

 
2022-12-23
The submission session is now available for: HORIZON-CL4-2023-SPACE-01-63(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-33(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-32(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-34(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-62(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-72(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-31(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-71(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-23(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-21(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-22(HORIZON-RIA)
2022-12-23
The submission session is now available for: HORIZON-CL4-2023-SPACE-01-63(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-33(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-32(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-34(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-62(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-72(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-31(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-71(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-23(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-21(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-22(HORIZON-RIA)
2022-12-22
The submission session is now available for: HORIZON-CL4-2023-SPACE-01-63(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-33(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-11(HORIZON-IA), HORIZON-CL4-2023-SPACE-01-12(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-32(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-34(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-62(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-72(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-31(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-71(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-23(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-13(HORIZON-CSA)
2022-12-22
The submission session is now available for: HORIZON-CL4-2023-SPACE-01-63(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-33(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-11(HORIZON-IA), HORIZON-CL4-2023-SPACE-01-12(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-32(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-34(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-62(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-72(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-31(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-71(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-23(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-13(HORIZON-CSA)
call topic details
Call status: Closed
Opening date: 2022-12-22 (3 years ago)
Closing date: 2023-03-28 (3 years ago)
Procedure: single-stage

Budget: 20,000,000
Expected grants: 1
Contribution: 20,000,000 - 20,000,000
News flashes

This call topic has been appended 8 times by the EC with news.

  • 2023-07-24
     an overview of the horizon-cl4-202...
  • 2023-07-24
     an overview of the horizon-cl4-202...
  • 2023-03-28
     call horizon-cl4-2023-space-01 has...
  • 2023-03-28
     call horizon-cl4-2023-space-01 has...
  • 2022-12-23
    the submission session is now available...
  • 2022-12-23
    the submission session is now available...
  • 2022-12-22
    the submission session is now available...
  • 2022-12-22
    the submission session is now available...
Source information

Showing the latest information. Found 204 versions of this call topic in the F&T portal.

Information from

  • 2026-10-08_08-27-25
  • 2026-10-08_08-26-49
  • 2026-10-07_08-23-01
  • 2026-10-07_08-22-34
  • 2026-10-06_08-25-01
  • 2026-10-06_08-24-37
  • 2026-10-05_08-20-57
  • 2026-10-05_08-20-36
  • 2026-10-04_08-22-39
  • 2026-10-04_08-22-13
  • 2026-10-03_08-20-45
  • 2026-10-03_08-20-26
  • 2026-10-02_08-26-24
  • 2026-10-02_08-21-28
  • 2026-10-01_08-28-41
  • 2026-10-01_08-24-00
  • 2026-09-29_09-02-40
  • 2026-09-29_08-56-06
  • 2026-09-28_09-01-53
  • 2026-09-28_08-55-43
  • 2026-09-27_09-01-29
  • 2026-09-27_08-54-31
  • 2026-09-26_08-57-53
  • 2026-09-26_08-51-11
  • 2026-09-25_08-58-54
  • 2026-09-25_08-52-51
  • 2026-09-24_09-02-21
  • 2026-09-24_08-55-21
  • 2026-09-23_08-56-13
  • 2026-09-23_08-50-04
  • 2026-09-22_08-56-45
  • 2026-09-22_08-50-11
  • 2026-09-21_08-52-35
  • 2026-09-21_08-46-04
  • 2026-09-20_08-54-07
  • 2026-09-20_08-47-23
  • 2026-09-19_08-50-36
  • 2026-09-19_08-44-32
  • 2026-09-18_08-56-13
  • 2026-09-18_08-50-08
  • 2026-09-17_08-51-18
  • 2026-09-17_08-45-07
  • 2026-09-16_08-48-55
  • 2026-09-16_08-42-29
  • 2026-09-15_08-51-06
  • 2026-09-15_08-44-18
  • 2026-09-14_08-50-09
  • 2026-09-14_08-43-51
  • 2026-09-13_08-48-23
  • 2026-09-13_08-42-22
  • 2026-09-12_08-51-55
  • 2026-09-12_08-46-00
  • 2026-09-11_08-50-38
  • 2026-09-11_08-44-51
  • 2026-09-10_08-49-29
  • 2026-09-10_08-43-34
  • 2026-09-09_08-50-24
  • 2026-09-09_08-44-24
  • 2026-09-08_08-47-39
  • 2026-09-08_08-42-16
  • 2026-09-07_08-48-01
  • 2026-09-07_08-41-58
  • 2026-09-06_08-46-43
  • 2026-09-06_08-40-42
  • 2026-09-05_08-44-53
  • 2026-09-05_08-39-06
  • 2026-09-04_08-43-23
  • 2026-09-04_08-37-39
  • 2026-09-03_08-43-31
  • 2026-09-03_08-37-51
  • 2026-09-02_08-44-36
  • 2026-09-02_08-39-15
  • 2026-09-01_08-44-00
  • 2026-09-01_08-38-44
  • 2026-08-31_08-47-27
  • 2026-08-31_08-42-16
  • 2026-08-30_08-37-14
  • 2026-08-30_08-31-47
  • 2026-08-29_08-39-33
  • 2026-08-29_08-34-38
  • 2026-08-28_08-43-42
  • 2026-08-28_08-38-20
  • 2026-08-27_08-32-21
  • 2026-08-27_08-26-59
  • 2026-08-25_08-39-14
  • 2026-08-25_08-33-52
  • 2026-08-24_08-34-14
  • 2026-08-24_08-29-07
  • 2026-08-23_08-32-12
  • 2026-08-23_08-26-48
  • 2026-08-22_08-33-19
  • 2026-08-22_08-28-06
  • 2026-08-21_08-27-06
  • 2026-08-21_08-22-04
  • 2026-08-20_08-31-45
  • 2026-08-20_08-26-49
  • 2026-08-19_08-30-31
  • 2026-08-19_08-25-50
  • 2026-08-18_08-25-37
  • 2026-08-18_08-20-41
  • 2026-08-17_08-26-48
  • 2026-08-17_08-22-06
  • 2026-08-16_08-21-32
  • 2026-08-16_08-16-57
  • 2026-08-14_08-25-18
  • 2026-08-14_08-20-02
  • 2026-08-13_08-21-39
  • 2026-08-13_08-17-21
  • 2026-08-12_08-21-25
  • 2026-08-12_08-16-16
  • 2026-08-11_08-22-57
  • 2026-08-11_08-18-16
  • 2026-08-10_08-19-17
  • 2026-08-10_08-14-44
  • 2026-08-09_08-18-36
  • 2026-08-09_08-14-07
  • 2026-08-08_08-16-39
  • 2026-08-08_08-12-46
  • 2026-08-07_08-15-59
  • 2026-08-07_08-11-28
  • 2026-08-06_08-16-27
  • 2026-08-06_08-12-04
  • 2026-08-05_08-18-00
  • 2026-08-05_08-13-40
  • 2026-08-04_08-18-07
  • 2026-08-04_08-13-57
  • 2026-08-03_08-16-27
  • 2026-08-03_08-11-56
  • 2026-08-02_08-14-32
  • 2026-08-02_08-10-25
  • 2026-08-01_08-16-40
  • 2026-08-01_08-12-02
  • 2026-07-31_08-14-38
  • 2026-07-31_08-10-28
  • 2026-07-30_08-13-00
  • 2026-07-30_08-08-41
  • 2026-07-29_08-14-47
  • 2026-07-29_08-10-53
  • 2026-07-28_08-13-56
  • 2026-07-28_08-09-46
  • 2026-07-27_08-09-15
  • 2026-07-27_08-04-53
  • 2026-07-26_08-06-49
  • 2026-07-26_08-02-25
  • 2026-07-25_08-06-55
  • 2026-07-25_08-03-07
  • 2026-07-24_08-07-29
  • 2026-07-24_08-03-37
  • 2026-07-23_08-07-53
  • 2026-07-23_08-03-30
  • 2026-07-22_08-09-33
  • 2026-07-22_08-05-06
  • 2026-07-21_08-05-36
  • 2026-07-21_08-01-42
  • 2026-07-20_08-05-52
  • 2026-07-20_08-02-06
  • 2026-07-19_08-06-56
  • 2026-07-19_08-02-44
  • 2026-07-18_08-06-08
  • 2026-07-18_08-02-11
  • 2026-07-17_08-05-51
  • 2026-07-17_08-01-27
  • 2026-07-16_07-46-17
  • 2026-07-16_07-43-23
  • 2026-07-15_07-46-24
  • 2026-07-15_07-42-59
  • 2026-07-14_07-44-51
  • 2026-07-14_07-41-48
  • 2026-07-13_07-45-37
  • 2026-07-13_07-42-42
  • 2026-07-12_07-45-11
  • 2026-07-12_07-42-27
  • 2026-07-11_07-44-16
  • 2026-07-11_07-41-09
  • 2026-07-10_07-44-22
  • 2026-07-10_07-41-12
  • 2026-07-09_07-44-25
  • 2026-07-09_07-41-16
  • 2026-07-08_07-43-56
  • 2026-07-08_07-41-03
  • 2026-07-07_07-43-50
  • 2026-07-06_07-41-18
  • 2026-07-05_07-40-26
  • 2026-07-04_07-39-27
  • 2026-07-03_07-42-08
  • 2026-07-03_07-39-01
  • 2026-07-02_07-40-49
  • 2026-07-02_07-38-09
  • 2026-07-01_08-01-40
  • 2026-07-01_08-01-07
  • 2026-06-30_09-49-17
  • 2026-06-30_07-58-10
  • 2026-06-29_11-35-09
  • 2026-06-29_08-01-33
  • 2026-06-28_09-32-18
  • 2026-06-28_07-56-06
  • 2026-06-27_09-32-50
  • 2026-06-27_07-56-24
  • 2026-06-27_07-55-59
  • 2026-02-18_07-04-45
  • 2025-06-07_03-33-28
  • 2024-11-04_17-25-46
  • 2024-09-30_21-22-15
  • 2024-03-30_14-18-19

Check the differences between the versions.

Annotations

You must be logged in to add annotations
No annotations yet

Events

Hand-picked events relevant to this call topic.

No events yet

There are currently no events linked to this call topic.

Timeline

Track where this call stands in its lifecycle, from work programme to grant signature, and see what's likely to happen next.

Call published · 30 Sep 2024 (2 years ago)

All expected milestones for this call have passed.

Today

Work programme published

07 Oct 2022 · est.

Call opens

22 Dec 2022

Call closes

28 Mar 2023

Outcome expected

28 Aug 2023 · est.

Grant agreement signed

28 Nov 2023 · est.

Call published

30 Sep 2024

Preparation Open for submission Evaluation Grant preparation Not yet reached
  1. Work programme published Estimated

    07 Oct 2022 · 4 years ago

    Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.

  2. Call opens

    22 Dec 2022 · 3 years ago

    Submissions can be made from this date.

  3. Call closes

    28 Mar 2023 · 3 years ago

    Deadline to submit a proposal.

  4. Outcome expected Estimated

    28 Aug 2023 · 3 years ago

    The maximum time to inform applicants of the evaluation outcome is five months after the call closes.

  5. Grant agreement signed Estimated

    28 Nov 2023 · 2 years ago

    The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.

  6. Call published

    30 Sep 2024 · 2 years ago

    This topic was first published in TopicTree.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Ecosystem bubbles

This call topic is part of the following thematic bubbles.

Not part of a bubble yet

This call topic has not been grouped into an ecosystem bubble.

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal