HORIZON-CL5-2026-02-D3-22

Underground Thermal Energy Storage in dense urban areas -

Call text (as on F&T portal)

View on F&T portal

Expected Outcome:

Project results are expected to contribute to all of the following expected outcomes:

  • Advanced European innovative knowledge basis and increased technology competitiveness in the area thermal storage;
  • Improved security of the future European renewable-based energy system;
  • Contribution to the decarbonisation of cities and densely populated urban areas with high safety solutions;
  • Significant reduction of LCOHS (Levelised Cost of Heat Storage);
  • Local communities are engaged and their expectations are responded to.
  • Technology developers practice inclusive societal engagement which is early, continuous, and sensitive to the technical specificities (e.g. local resource, subsurface uncertainties) and social challenges (e.g. low public awareness) of underground thermal energy storage technologies in the context of densely populated urban areas.

Scope:

In scope are novel technologies, interfaces, design methods and organisational concepts that result in the most effective and sustainable use of subsurface space in dense urban areas by Underground Thermal Energy Storage (UTES) systems such as ATES, CTES and BTES.

Proposals should consider the integration in the existing energy grids and interaction with other urban uses of the subsurface (e.g., subways, underground utilities, buildings), including energy geostructures of buildings, tunnels, slabs, energy sheet pile walls, etc., with potential geothermal heating, cooling, and sinks or storage opportunities.

Proposals should address the uncertainties in the seasonal energy demand to increase the predictability of the required subsurface space, the interactions among systems for the sake of optimal use of subsurface and thermal efficiency.

Projects are expected to deploy one or more demonstrators and can address, for example, one or more of the following exemplary areas:

  • Optimal utilisation of geothermal resources and thermal energy storage in urban settings, addressing high (above 70 degrees Celsius), medium (30-70 degrees Celsius) and/or low temperatures (10-30 degrees Celsius) and possible requirements for retrofitting of the building stock;
  • Subsurface models for a sustainable underground thermal storage and geothermal use in cities;
  • The integration of heat pumps, advanced thermal storage, and interface with district heating infrastructures to contribute to the thermal and power grid flexibility;
  • Studying the impact of subsurface urban heat islands (SUHI) on the potential of shallow geothermal energy use in cities, using, for instance, long-term subsurface monitoring networks, satellite monitoring and models;
  • Best practices strategies for subsurface land-use plans in European cities; well/borehole placement strategies;
  • Mutual interaction of existing and future neighbouring UTES systems from geotechnical, energy, and regulatory point of view;
  • Management of energy grids on an urban scale and system optimisation thorough digital twins predicting operational, environmental and economic response, as well as the interaction between the storage system and the local grids, under different scenarios;
  • Creation of large (time and scale-wise) open multisensory datasets to foster heat energy storage at the European scale which should adhere to the FAIR data principles, adopt data quality standards, data integration operating procedures and GDPR-compliant data sharing/access good practices developed by the European research infrastructures, where relevant.
  • Use of advanced monitoring systems such as fibre optic sensors, satellite imagery, etc. for monitoring and early detection of adverse impact of UTES at a district scale level and providing measures to mitigate such effects.

Consideration should be given to de-risking solutions, and dedicated support schemes that guide innovative energy storage technologies through to the commercialisation stage. The consortium should assess the current regulatory context and provide recommendations linked to the proposed solutions for shaping future needs (e.g., regulatory, standardisation, permitting). In addition, appropriate local community engagement initiatives as well as expectations and experiences of underground thermal storage infrastructures (and to what extent it varies in dense urban areas) should be explored.

This topic requires citizens engagement and dialogue and the effective contribution of SSH disciplines and the involvement of SSH experts, institutions as well as the inclusion of relevant SSH expertise, in order to produce meaningful and significant effects enhancing the societal impact of the related research activities and ensure the translation of innovation into real-life outputs.

null

Activities are expected to achieve TRL 6-7 by the end of the project – see General Annex B. Activities may start at any TRL.

News flashes

2026-10-09

EVALUATION results

Published: 16 September 2025

Deadline: 17 February 2026

Available budget: EUR 318.000.000

D3-01

D3-02

D3-05

D3-07

D3-08

D3-10

D3-12

D3-13

D3-14

D3-18

D3-19

D3-20

D3-22

D3-24

D4-01

D4-02

D4-03

D4-04

D4-05

D4-06

Number of proposals submitted (including proposals transferred from or to other calls)

35

28

26

74

43

20

19

2

33

12

56

43

20

118

72

75

59

50

56

35

Number of inadmissible proposals

0

1

0

0

1

1

0

0

4

0

0

0

0

0

0

2

2

1

2

0

Number of ineligible proposals

0

1

1

1

0

0

0

0

1

0

30

1

0

2

2

0

0

1

1

7

Number of above-threshold proposals

20

20

11

61

20

8

13

1

17

9

10

21

15

48

34

41

39

20

13

14

Total budget requested for above-threshold proposals

(EUR/millions)

212.82

79.03

79.20

300.18

100.54

64.03

52.10

10.00

33.07

80.71

79.75

202.79

129.23

281,80

169.26

163.30

194.10

98.32

51.96

102.22

Number of proposals retained for funding

3

2

2

3

3

3

2

1

3

2

2

2

2

3

3

3

3

3

3

2

Number of proposals in the reserve list

2

2

2

2

2

2

2

0

2

2

2

2

2

2

2

2

2

2

2

2

Funding threshold[1],[2]

14.50

15.00

13.00

15.00

13.50

14.50

15.00

12.50

14.50

14.00

15.00

15.00

13.00

14.50

14.00

15.00

14.50

14.00

14.00

14.50

Ranking distribution

Number of proposals with scores lower or equal to 15 and higher or equal to 14

9

11

1

10

2

4

7

0

5

2

4

7

0

15

8

11

10

3

3

5

Number of proposals with scores lower than 14 and higher or equal to 13

6

3

2

19

5

3

3

0

5

5

3

7

3

17

3

9

7

3

2

7

Number of proposals with scores lower than 13 and higher or equal to 10

5

6

8

32

13

1

3

1

7

2

3

7

12

16

23

21

22

14

8

2

[1] Proposals with the same score were ranked according to the priority order procedure set out in the call conditions (for HE, in the General Annexes to the Work Programme or specific arrangements in the specific call/topic conditions).

To determine the ranking for ‘Innovation actions’, the score for ‘Impact’ is given a weight of 1.5.

[2] According to the specific condition of HORIZON-CL5-2026-02-D3-01, to ensure a balanced portfolio coverage, grants are awarded to proposals not only in order of ranking but at least also to one proposal that is the highest ranked within the area of liquid advanced biofuels and at least also to one proposal that is the highest ranked within the area of liquid renewable fuels of non-biological origin, provided that proposals attain all thresholds (and subject to available budget).

According to the specific condition of HORIZON-CL5-2026-02-D3-05, to ensure a balanced portfolio coverage, grants are awarded to proposals not only in order of ranking but at least also to one proposal that is the highest ranked within the area of concentrated solar power (CSP) and at least also to one proposal that is the highest ranked within the area of solar thermal heat and/or cold, provided that proposals attain all thresholds (and subject to available budget). Therefore, additional proposals are retained for funding to fulfil this condition.

According to the specific condition of HORIZON-CL5-2026-02-D3-08, to ensure a balanced portfolio coverage, grants are awarded to applications not only in order of ranking, but priority will be given to high-ranking proposals that ensure, collectively, the best coverage of the different European sea basins (Atlantic Ocean, Baltic Sea, Black Sea, North Sea and Mediterranean Sea), provided that the proposals attain all thresholds. Therefore, additional proposals are retained for funding to fulfil this condition.

According to the specific condition of HORIZON-CL5-2026-02-D3-14, to ensure a balanced portfolio coverage, grants are awarded to applications not only in order of ranking but at least also to one project that is the highest ranked within area 1., 2. or 3., provided that the applications attain all thresholds. Therefore, additional proposals are retained for funding to fulfil this condition.

According to the specific condition of HORIZON-CL5-2026-02-D3-24, to ensure a balanced portfolio coverage of both (i) point-source capture and (ii) direct air capture technologies, grants are awarded to not only in order of ranking but at least also to one proposal that is the highest ranked within each area, provided they attain all thresholds (and subject to available budget).

Summary of observer report:

The process was professionally organized and executed with rigor. It was fair, impartial, expertise-driven, and transparently documented at every step. Consensus Reports, the definitive outputs of the evaluation, consistently met high quality standards, closely aligned with the published and communicated guidance, and complied with all applicable rules. Panels were composed to ensure balanced expertise, and newly introduced Vice-Chairs facilitated discussions that were structured, respectful, and evidence-based. Divergent assessments were addressed through focused, criterion-by-criterion debate, and rationales were clearly recorded to ensure traceability.

Robust safeguards supported integrity and consistency. Conflict-of-interest declarations were systematically collected and enforced. Calibration briefings promoted a common understanding of scoring scales and evaluation criteria, enabling consistent judgments across proposals and panels. Quality control mechanisms, including cross-checks, effectively harmonized outcomes without compromising the independence of assessments. Confidentiality was maintained throughout. Access controls in the SEP system and teleconferencing platforms were appropriate, data handling was secure, and sensitive information was treated with due care.

Operationally, the evaluation benefited from clear timelines, timely support to evaluators, and a reliable digital infrastructure. The documentation was complete and accessible, and the SEP system provided full transparency over inputs and decisions. Overall, the exercise adhered to its core principle, namely impartiality, fairness, and confidentiality throughout. The resulting evaluation summary reports and ranking list are consistent, well-reasoned, and aligned with the guiding documents.

We recently informed the applicants about the evaluation results for their proposals.

For questions, please contact the Research Enquiry Service.

2026-10-09

PROPOSAL NUMBERS  

Call HORIZON-CL5-2026-02 has closed on the 17/02/2026 (17:00). 

876 proposals have been submitted. 

The breakdown per topic is: 

  • HORIZON-CL5-2026-02-D3-01: 35 
  • HORIZON-CL5-2026-02-D3-02: 28 
  • HORIZON-CL5-2026-02-D3-05: 26 
  • HORIZON-CL5-2026-02-D3-07: 74 
  • HORIZON-CL5-2026-02-D3-08: 43 
  • HORIZON-CL5-2026-02-D3-10: 20 
  • HORIZON-CL5-2026-02-D3-12: 19 
  • HORIZON-CL5-2026-02-D3-13: 2 
  • HORIZON-CL5-2026-02-D3-14: 33 
  • HORIZON-CL5-2026-02-D3-18: 12 
  • HORIZON-CL5-2026-02-D3-19: 56 
  • HORIZON-CL5-2026-02-D3-20: 43 
  • HORIZON-CL5-2026-02-D3-22: 20 
  • HORIZON-CL5-2026-02-D3-24: 118 
  • HORIZON-CL5-2026-02-D4-01: 71 
  • HORIZON-CL5-2026-02-D4-02: 75 
  • HORIZON-CL5-2026-02-D4-03: 60 
  • HORIZON-CL5-2026-02-D4-04: 50 
  • HORIZON-CL5-2026-02-D4-05: 56 
  • HORIZON-CL5-2026-02-D4-06: 35 

Evaluation results are expected to be communicated in May 2026.

2026-10-09

As call HORIZON-CL5-2026-02 is from the Horizon Europe Work Programme 2025, the following General Annexes apply:

https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/horizon/wp-call/2025/wp-14-general-annexes_horizon-2025_en.pdf

Applicants must use the dedicated versions of the application form template for their proposal that are found in the Electronic Submission Service (see section ‘Start Submission’).

call topic details
Call status: Closed
Opening date: 2025-09-16 (1 year ago)
Closing date: 2026-02-17 (7 months ago)
Procedure: single-stage

Budget: 18,000,000
Expected grants: 2
Contribution: 9,000,000 - 9,000,000
News flashes

This call topic has been appended 3 times by the EC with news.

  • 2026-10-09
    evaluation resultspublished: 16 septembe...
  • 2026-10-09
    proposal numbers  call horizon...
  • 2026-10-09
    as call horizon-cl5-2026-02 is from the...
Source information

Showing the latest information. Found 9 versions of this call topic in the F&T portal.

Information from

  • 2026-06-26_06-40-04
  • 2026-02-24_06-34-32
  • 2026-02-18_06-34-04
  • 2026-01-16_06-32-28
  • 2026-01-15_06-32-16
  • 2025-10-28_15-45-42
  • 2025-07-02_03-30-30
  • 2025-06-07_03-30-09
  • 2025-05-17_03-30-15

Check the differences between the versions.

Annotations

You must be logged in to add annotations
No annotations yet

Events

Hand-picked events relevant to this call topic.

No events yet

There are currently no events linked to this call topic.

Timeline

Track where this call stands in its lifecycle, from work programme to grant signature, and see what's likely to happen next.

Outcome expected · 17 Jul 2026 (2 months ago)

Next: Grant agreement signed, 1 week from now (17 Oct 2026, estimated)

Today

Call published

17 May 2025

Work programme published

16 Jul 2025 · est.

Call opens

16 Sep 2025

Call closes

17 Feb 2026

Outcome expected

17 Jul 2026 · est.

Grant agreement signed

17 Oct 2026 · est.

Preparation Open for submission Evaluation Grant preparation Not yet reached
  1. Call published

    17 May 2025 · 1 year ago

    This topic was first published in TopicTree.

  2. Work programme published Estimated

    16 Jul 2025 · 1 year ago

    Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.

  3. Call opens

    16 Sep 2025 · 1 year ago

    Submissions can be made from this date.

  4. Call closes

    17 Feb 2026 · 7 months ago

    Deadline to submit a proposal.

  5. Outcome expected Estimated

    17 Jul 2026 · 2 months ago

    The maximum time to inform applicants of the evaluation outcome is five months after the call closes.

  6. Grant agreement signed Estimated

    17 Oct 2026 · 1 week from now

    The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Ecosystem bubbles

This call topic is part of the following thematic bubbles.

Not part of a bubble yet

This call topic has not been grouped into an ecosystem bubble.

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal