Closed HORIZON-CL4-2023-TWIN-TRANSITION-01-31 HORIZON

Energy efficiency breakthroughs in the process industries (Processes4Planet partnership) (RIA)

Call text (as on F&T portal)

View on F&T portal

Expected Outcome:

Projects outcomes will enable achievement of the objectives of Processes4Planet partnership by designing and digitising industrial processes for a maximum energy efficiency, ensuring process flexibility and capturing the full potential of renewable energy (related to P4Planet operational objectives 1 and 5).

Projects are expected to contribute to the following outcomes:

  • Increase the energy efficiency of energy intensive industrial processes by reducing energy use by at least 30% and the process as compared to current state of the art;
  • Enable the techno-economic feasibility of novel technologies and processes, validated and demonstrated at suitable scale against state of the art of industrial processes;
  • Enable the potential of an increased use of renewable energy;
  • Contribute to achieving EU climate neutrality goal and becoming independent from fossil fuel and fossil fuel imports as put forward in the REPowerEU Plan[1].

Scope:

To decarbonise the energy-intensive industries both, the availability of affordable renewable energy, and the increase of the industrial processes energy efficiency, will be needed. Today‘s energy efficiency improvements in conventional plants are about 1-2% annually. The use of digital technologies in process optimisation has the potential to further reduce this energy demand. However, digital technologies alone cannot achieve the required change in the process industries’ energy efficiency, the combination of digital technologies with highly energy efficient process breakthroughs is required.

Proposals under this topic should:

  • Focus on the development of highly efficient technological breakthroughs for the innovation of the most energy intensive parts of specific processes;
  • Demonstrate the decrease in energy intensity of output level (intermediate, final product);
  • Integrate novel digital technologies from the fields of distributed process control and data driven AI based optimisation;
  • Demonstrate and evaluate energy efficiency gains, where relevant in optimal interaction with energy flexibility and integration of renewables.

The proposals should include energy efficiency, techno-economic and life-cycle assessments considering the overall process.

Proposals submitted under this topic should include a business case and exploitation strategy, as outlined in the introduction to this Destination.

Proposals should build on or seek collaboration with existing projects and develop synergies with other relevant European, national or regional initiatives, funding programmes and platforms. Proposals are encouraged to consider outcomes from the projects carried out in the call DT-SPIRE-06-2019: Digital technologies for improved performance in cognitive production plants.

This topic implements the co-programmed European partnership Processes4Planet.

null

Activities are expected to start at TRL 4 and achieve TRL 6 by the end of the project – see General Annex B.

[1] COM/2022/230 final

News flashes

2023-08-11

EVALUATION RESULTS

Call for proposals: HORIZON-CL4-2023-TWIN-TRANSITION-01

Deadline: 20 April 2023

Available budget: EUR 334,270,000.00

The results of the evaluation are as follows:

Number of proposals submitted (including proposals transferred from or to other calls): 210

Number of inadmissible proposals: 3

Number of ineligible proposals: 5

Number of above-threshold proposals: 155

Total budget requested for above-threshold proposals: EUR 1,123,924,110.83

We recently informed the applicants about the evaluation results for their proposals.

Please note that the number of proposals that can finally be funded will depend on the finally available budget and the formal selection by the Commission.

For questions, please contact the Research Enquiry Service.

 

2023-08-11

EVALUATION RESULTS

Call for proposals: HORIZON-CL4-2023-TWIN-TRANSITION-01

Deadline: 20 April 2023

Available budget: EUR 334,270,000.00

The results of the evaluation are as follows:

Number of proposals submitted (including proposals transferred from or to other calls): 210

Number of inadmissible proposals: 3

Number of ineligible proposals: 5

Number of above-threshold proposals: 155

Total budget requested for above-threshold proposals: EUR 1,123,924,110.83

We recently informed the applicants about the evaluation results for their proposals.

Please note that the number of proposals that can finally be funded will depend on the finally available budget and the formal selection by the Commission.

For questions, please contact the Research Enquiry Service.

 

2023-04-26

PROPOSAL NUMBERS

Call HORIZON-CL4-2023-TWIN-TRANSITION-01 has closed on the 20th April 2023.

210 proposals have been submitted.

The breakdown per topic is:

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-02             51: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-04             31: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-07             42: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-08             04: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-31             14: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-33             06: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-36             06: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-37             06: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-40             14: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-42             26: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-43             02: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-45             08: proposals

 

Evaluation results are expected to be communicated in July 2023

2023-04-26

PROPOSAL NUMBERS

Call HORIZON-CL4-2023-TWIN-TRANSITION-01 has closed on the 20th April 2023.

210 proposals have been submitted.

The breakdown per topic is:

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-02             51: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-04             31: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-07             42: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-08             04: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-31             14: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-33             06: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-36             06: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-37             06: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-40             14: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-42             26: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-43             02: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-45             08: proposals

 

Evaluation results are expected to be communicated in July 2023

2023-01-24

We would like to draw your attention to an update of the “Detailed Budget Table”  Excel template. A new template has been republished for your kind consideration and use.

An additional paragraph has been added to the instructions tab, explaining how to save the detailed budget table and how to upload it in the submission system:

“After you completed this Excel workbook, you must also complete the table ‘Budget for the proposal’ in Part A of the proposal, entering the requested EU contribution for each participant. Fill the Part A budget table using the total for each participant from the sheet ‘Lump sum breakdown’ in this Excel workbook. The format of this Excel workbook is .xlsm because it uses macros to generate sheets and make calculations automatically. Always save it as .xlsm. However, this format cannot be uploaded to the submission system for security reasons. Therefore, to submit the completed workbook, save a copy as an .xlsx or .xls document (and not as .xlsm) and upload it to the proposal submission tool at Step 5 of the submission process. Always keep a copy of the original .xlsm file. To save the workbook as .xlsx document, use the action button in the sheet “Instructions”. Alternatively, click on “File” and then “Save as”; in the “Save as” dialog box, choose “.xlsx” or “.xls” from the “Save as type” dropdown list.”

You can still use the template initially available in the submission system if you wish to, but please be aware of the instructions on how to upload and save the file.

2023-01-24

We would like to draw your attention to an update of the “Detailed Budget Table”  Excel template. A new template has been republished for your kind consideration and use.

An additional paragraph has been added to the instructions tab, explaining how to save the detailed budget table and how to upload it in the submission system:

“After you completed this Excel workbook, you must also complete the table ‘Budget for the proposal’ in Part A of the proposal, entering the requested EU contribution for each participant. Fill the Part A budget table using the total for each participant from the sheet ‘Lump sum breakdown’ in this Excel workbook. The format of this Excel workbook is .xlsm because it uses macros to generate sheets and make calculations automatically. Always save it as .xlsm. However, this format cannot be uploaded to the submission system for security reasons. Therefore, to submit the completed workbook, save a copy as an .xlsx or .xls document (and not as .xlsm) and upload it to the proposal submission tool at Step 5 of the submission process. Always keep a copy of the original .xlsm file. To save the workbook as .xlsx document, use the action button in the sheet “Instructions”. Alternatively, click on “File” and then “Save as”; in the “Save as” dialog box, choose “.xlsx” or “.xls” from the “Save as type” dropdown list.”

You can still use the template initially available in the submission system if you wish to, but please be aware of the instructions on how to upload and save the file.

2022-12-08
The submission session is now available for: HORIZON-CL4-2023-TWIN-TRANSITION-01-33(HORIZON-IA), HORIZON-CL4-2023-TWIN-TRANSITION-01-31(HORIZON-RIA), HORIZON-CL4-2023-TWIN-TRANSITION-01-02(HORIZON-IA), HORIZON-CL4-2023-TWIN-TRANSITION-01-43(HORIZON-IA), HORIZON-CL4-2023-TWIN-TRANSITION-01-45(HORIZON-RIA), HORIZON-CL4-2023-TWIN-TRANSITION-01-37(HORIZON-IA), HORIZON-CL4-2023-TWIN-TRANSITION-01-07(HORIZON-RIA), HORIZON-CL4-2023-TWIN-TRANSITION-01-36(HORIZON-RIA), HORIZON-CL4-2023-TWIN-TRANSITION-01-40(HORIZON-RIA), HORIZON-CL4-2023-TWIN-TRANSITION-01-42(HORIZON-RIA), HORIZON-CL4-2023-TWIN-TRANSITION-01-08(HORIZON-CSA), HORIZON-CL4-2023-TWIN-TRANSITION-01-04(HORIZON-IA)
2022-12-08
The submission session is now available for: HORIZON-CL4-2023-TWIN-TRANSITION-01-33(HORIZON-IA), HORIZON-CL4-2023-TWIN-TRANSITION-01-31(HORIZON-RIA), HORIZON-CL4-2023-TWIN-TRANSITION-01-02(HORIZON-IA), HORIZON-CL4-2023-TWIN-TRANSITION-01-43(HORIZON-IA), HORIZON-CL4-2023-TWIN-TRANSITION-01-45(HORIZON-RIA), HORIZON-CL4-2023-TWIN-TRANSITION-01-37(HORIZON-IA), HORIZON-CL4-2023-TWIN-TRANSITION-01-07(HORIZON-RIA), HORIZON-CL4-2023-TWIN-TRANSITION-01-36(HORIZON-RIA), HORIZON-CL4-2023-TWIN-TRANSITION-01-40(HORIZON-RIA), HORIZON-CL4-2023-TWIN-TRANSITION-01-42(HORIZON-RIA), HORIZON-CL4-2023-TWIN-TRANSITION-01-08(HORIZON-CSA), HORIZON-CL4-2023-TWIN-TRANSITION-01-04(HORIZON-IA)
call topic details
Call status: Closed
Opening date: 2022-12-08 (3 years ago)
Closing date: 2023-04-20 (3 years ago)
Procedure: single-stage

Budget: 32,000,000
Expected grants: 3
Contribution: 8,000,000 - 10,000,000
News flashes

This call topic has been appended 8 times by the EC with news.

  • 2023-08-11
    evaluation results call for proposals: h...
  • 2023-08-11
    evaluation results call for proposals: h...
  • 2023-04-26
    proposal numberscall horizon-cl4-2023-tw...
  • 2023-04-26
    proposal numberscall horizon-cl4-2023-tw...
  • 2023-01-24
    we would like to draw your attention to...
  • 2023-01-24
    we would like to draw your attention to...
  • 2022-12-08
    the submission session is now available...
  • 2022-12-08
    the submission session is now available...
Source information

Showing the latest information. Found 213 versions of this call topic in the F&T portal.

Information from

  • 2026-10-12_08-37-42
  • 2026-10-12_08-34-48
  • 2026-10-11_08-36-49
  • 2026-10-11_08-34-06
  • 2026-10-09_08-36-07
  • 2026-10-09_08-33-07
  • 2026-10-08_08-39-30
  • 2026-10-08_08-36-34
  • 2026-10-07_08-36-41
  • 2026-10-07_08-32-04
  • 2026-10-06_08-36-40
  • 2026-10-06_08-33-41
  • 2026-10-05_08-34-22
  • 2026-10-05_08-29-54
  • 2026-10-04_08-33-44
  • 2026-10-04_08-31-04
  • 2026-10-03_08-32-25
  • 2026-10-03_08-29-28
  • 2026-10-02_08-32-13
  • 2026-10-02_08-31-03
  • 2026-10-01_08-34-35
  • 2026-10-01_08-33-20
  • 2026-09-29_09-09-38
  • 2026-09-29_09-08-11
  • 2026-09-28_09-09-00
  • 2026-09-28_09-07-40
  • 2026-09-27_09-08-43
  • 2026-09-27_09-07-12
  • 2026-09-26_09-04-48
  • 2026-09-26_09-03-26
  • 2026-09-25_09-05-51
  • 2026-09-25_09-04-27
  • 2026-09-24_09-09-17
  • 2026-09-24_09-08-00
  • 2026-09-23_09-02-47
  • 2026-09-23_09-01-41
  • 2026-09-22_09-03-40
  • 2026-09-22_09-02-21
  • 2026-09-21_08-59-24
  • 2026-09-21_08-58-12
  • 2026-09-20_09-00-48
  • 2026-09-20_08-59-36
  • 2026-09-19_08-56-55
  • 2026-09-19_08-55-53
  • 2026-09-18_09-03-00
  • 2026-09-18_09-01-53
  • 2026-09-17_08-57-51
  • 2026-09-17_08-56-38
  • 2026-09-16_08-55-24
  • 2026-09-16_08-54-13
  • 2026-09-15_08-57-53
  • 2026-09-15_08-56-37
  • 2026-09-14_08-56-33
  • 2026-09-14_08-55-32
  • 2026-09-13_08-54-54
  • 2026-09-13_08-53-48
  • 2026-09-12_08-58-21
  • 2026-09-12_08-57-11
  • 2026-09-11_08-57-03
  • 2026-09-11_08-56-01
  • 2026-09-10_08-56-16
  • 2026-09-10_08-55-06
  • 2026-09-09_08-57-12
  • 2026-09-09_08-56-01
  • 2026-09-08_08-54-24
  • 2026-09-08_08-53-19
  • 2026-09-07_08-54-40
  • 2026-09-07_08-53-27
  • 2026-09-06_08-53-06
  • 2026-09-06_08-51-59
  • 2026-09-05_08-51-13
  • 2026-09-05_08-50-07
  • 2026-09-04_08-50-04
  • 2026-09-04_08-48-53
  • 2026-09-03_08-49-54
  • 2026-09-03_08-48-28
  • 2026-09-02_08-51-06
  • 2026-09-02_08-49-54
  • 2026-09-01_08-50-48
  • 2026-09-01_08-49-45
  • 2026-08-31_08-54-26
  • 2026-08-31_08-53-15
  • 2026-08-30_08-43-37
  • 2026-08-30_08-42-33
  • 2026-08-29_08-46-31
  • 2026-08-29_08-45-29
  • 2026-08-28_08-51-00
  • 2026-08-28_08-49-48
  • 2026-08-27_08-39-23
  • 2026-08-27_08-38-20
  • 2026-08-25_08-45-49
  • 2026-08-25_08-44-24
  • 2026-08-24_08-41-13
  • 2026-08-24_08-39-58
  • 2026-08-23_08-38-31
  • 2026-08-23_08-37-14
  • 2026-08-22_08-39-56
  • 2026-08-22_08-38-37
  • 2026-08-21_08-33-51
  • 2026-08-21_08-32-31
  • 2026-08-20_08-38-59
  • 2026-08-20_08-37-35
  • 2026-08-19_08-37-29
  • 2026-08-19_08-36-02
  • 2026-08-18_08-32-14
  • 2026-08-18_08-30-48
  • 2026-08-17_08-33-43
  • 2026-08-17_08-32-22
  • 2026-08-16_08-27-50
  • 2026-08-16_08-26-45
  • 2026-08-15_08-43-14
  • 2026-08-15_08-42-00
  • 2026-08-14_08-31-20
  • 2026-08-14_08-30-18
  • 2026-08-13_08-27-48
  • 2026-08-13_08-26-43
  • 2026-08-12_08-27-09
  • 2026-08-12_08-26-08
  • 2026-08-11_08-29-34
  • 2026-08-11_08-28-30
  • 2026-08-10_08-26-58
  • 2026-08-10_08-25-39
  • 2026-08-09_08-25-01
  • 2026-08-09_08-24-00
  • 2026-08-08_08-23-16
  • 2026-08-08_08-21-46
  • 2026-08-07_08-22-25
  • 2026-08-07_08-21-20
  • 2026-08-06_08-22-57
  • 2026-08-06_08-21-50
  • 2026-08-05_08-24-40
  • 2026-08-05_08-23-36
  • 2026-08-04_08-25-11
  • 2026-08-04_08-23-43
  • 2026-08-03_08-23-07
  • 2026-08-03_08-21-44
  • 2026-08-02_08-21-07
  • 2026-08-02_08-19-53
  • 2026-08-01_08-22-56
  • 2026-08-01_08-21-34
  • 2026-07-31_08-20-55
  • 2026-07-31_08-19-54
  • 2026-07-30_08-19-15
  • 2026-07-30_08-18-20
  • 2026-07-29_08-21-12
  • 2026-07-29_08-20-13
  • 2026-07-28_08-20-25
  • 2026-07-28_08-19-28
  • 2026-07-27_08-15-10
  • 2026-07-27_08-13-56
  • 2026-07-26_08-12-52
  • 2026-07-26_08-11-33
  • 2026-07-25_08-13-01
  • 2026-07-25_08-12-03
  • 2026-07-24_08-13-59
  • 2026-07-24_08-12-42
  • 2026-07-23_08-13-42
  • 2026-07-23_08-12-33
  • 2026-07-22_08-15-15
  • 2026-07-22_08-14-13
  • 2026-07-21_08-12-13
  • 2026-07-21_08-10-50
  • 2026-07-20_08-11-57
  • 2026-07-20_08-11-02
  • 2026-07-19_08-12-32
  • 2026-07-19_08-11-34
  • 2026-07-18_08-12-30
  • 2026-07-18_08-11-28
  • 2026-07-17_08-11-36
  • 2026-07-17_08-10-41
  • 2026-07-16_07-51-05
  • 2026-07-16_07-50-22
  • 2026-07-15_07-51-07
  • 2026-07-15_07-50-07
  • 2026-07-14_07-49-41
  • 2026-07-14_07-48-42
  • 2026-07-13_07-50-23
  • 2026-07-13_07-49-40
  • 2026-07-12_07-49-58
  • 2026-07-12_07-49-01
  • 2026-07-11_07-48-37
  • 2026-07-11_07-47-41
  • 2026-07-10_07-48-47
  • 2026-07-10_07-47-47
  • 2026-07-09_07-48-52
  • 2026-07-09_07-47-56
  • 2026-07-08_07-48-35
  • 2026-07-08_07-47-34
  • 2026-07-07_07-48-14
  • 2026-07-07_07-47-15
  • 2026-07-06_07-48-43
  • 2026-07-06_07-48-04
  • 2026-07-05_07-44-47
  • 2026-07-05_07-43-56
  • 2026-07-04_07-46-06
  • 2026-07-04_07-45-30
  • 2026-07-03_07-46-10
  • 2026-07-03_07-45-32
  • 2026-07-02_07-45-01
  • 2026-07-02_07-44-22
  • 2026-07-01_08-14-32
  • 2026-07-01_08-12-22
  • 2026-06-30_09-49-36
  • 2026-06-30_08-11-54
  • 2026-06-29_11-35-25
  • 2026-06-29_08-15-06
  • 2026-06-28_09-32-38
  • 2026-06-28_08-07-02
  • 2026-06-27_09-33-19
  • 2026-06-27_08-07-29
  • 2026-06-27_08-04-29
  • 2026-02-18_07-05-56
  • 2024-03-30_14-17-51

Check the differences between the versions.

Annotations

You must be logged in to add annotations
No annotations yet

Events

Hand-picked events relevant to this call topic.

No events yet

There are currently no events linked to this call topic.

Timeline

Track where this call stands in its lifecycle, from work programme to grant signature, and see what's likely to happen next.

Call published · 30 Sep 2024 (2 years ago)

All expected milestones for this call have passed.

Today

Work programme published

07 Oct 2022 · est.

Call opens

08 Dec 2022

Call closes

20 Apr 2023

Outcome expected

20 Sep 2023 · est.

Grant agreement signed

20 Dec 2023 · est.

Call published

30 Sep 2024

Preparation Open for submission Evaluation Grant preparation Not yet reached
  1. Work programme published Estimated

    07 Oct 2022 · 4 years ago

    Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.

  2. Call opens

    08 Dec 2022 · 3 years ago

    Submissions can be made from this date.

  3. Call closes

    20 Apr 2023 · 3 years ago

    Deadline to submit a proposal.

  4. Outcome expected Estimated

    20 Sep 2023 · 3 years ago

    The maximum time to inform applicants of the evaluation outcome is five months after the call closes.

  5. Grant agreement signed Estimated

    20 Dec 2023 · 2 years ago

    The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.

  6. Call published

    30 Sep 2024 · 2 years ago

    This topic was first published in TopicTree.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Ecosystem bubbles

This call topic is part of the following thematic bubbles.

Not part of a bubble yet

This call topic has not been grouped into an ecosystem bubble.

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal