Sustainable and efficient industrial water consumption: through energy and solute recovery (Processes4Planet partnership) (RIA)
Call text (as on F&T portal)
View on F&T portalExpected Outcome:
Projects outcomes will enable achieving the objectives of Processes4Planet partnership by designing industrial processes for the maximum resource (water) efficiency and developing new process to ensure full valorisation of process industries wastewater, recycled water, energy, and solute recovery (P4Planet operational objectives 5 and 7).
Projects are expected to contribute to the following outcomes:
- Demonstrate sustainable industrial water consumption based on new technologies for energy and solute recovery;
- Enable full circular use of water in process industry thus reducing industry dependence and utilisation of fresh water;
- Enable the techno-economic feasibility of the processes and technologies for water treatment and recycling particularly when combined with energy and waste reduction strategies to compete with the existing state of the art;
- Maximise the recovery of substances and energy present in the wastewater streams;
- Demonstrate contribution to EU climate neutrality goal.
Scope:
Wastewater discharge from industry has decreased over decades. This is a consequence of increased regulation (e.g., Industrial Emissions Directive, IED; the European Pollutant Release and Transfer Register, E-PRTR), improvements in treatment and the implementation of best available techniques. Amongst process industries, pulp and paper, steel and chemicals have high wastewater discharges. The Processes4Planet target is to demonstrate the potential for 90% of wastewater reuse by 2030. A breakthrough in wastewater reduction could be envisaged, by combining existing technologies and novel water treatment technologies and reuse with process intensification, energy recovery and excess heat use e.g., integrated processes with separation systems will reduce water and energy consumption and the amount of final industrial wastewater produced. In addition, industrial waste waters often contain significant amounts of valuable solutes (e.g., organic matter, salts, phosphates, etc.) which are not optimally valorised.
The proposals should:
- Combine existing and novel water treatment technologies and re-use with process intensification;
- Use in combination smart monitoring technologies including affordable long lasting and reliable sensors and AI driven devices, integrated system risk management models and decision support tools and technologies for water re-use in process industries;
- Seek to integrate advanced digital tools for the optimisation of their process, such as Digital twins;
- Propose new technologies for recovering valuable solutes present in wastewater (metals, organic compounds, etc.) and for eliminating hazardous substances (e.g., micro and nano particles, toxic substances).
The proposals should include energy efficiency, techno-economic and life-cycle assessments considering the overall process. In order to maximize impact, technologies in the proposals should not be focused on one sector, but the proposed solution should be applicable in different types of industries; elements related to the replicability and scalability of the technology should be provided. Proposals are encouraged to consider outcomes from the Horizon 2020 topic CE-SPIRE-07-2020: Preserving fresh water: recycling industrial waters industry.
In addition, the topic could explore synergies with the Ocean and Waters and the Soil missions.
Proposals should build on or seek collaboration with existing projects and develop synergies with other relevant European, national or regional initiatives, funding programmes and platforms. Proposals are encouraged to consider the use of their expected outcomes in a wider approach that might benefit the establishment of Hubs for Circularity.
International cooperation can be considered specially with countries advanced in the field that could bring mutual benefit from different perspectives.
This topic implements the co-programmed European partnership Processes4Planet.
null
Activities are expected to start at TRL 4 and achieve TRL 6 by the end of the project – see General Annex B.
News flashes
EVALUATION RESULTS
Call for proposals: HORIZON-CL4-2023-TWIN-TRANSITION-01
Deadline: 20 April 2023
Available budget: EUR 334,270,000.00
The results of the evaluation are as follows:
Number of proposals submitted (including proposals transferred from or to other calls): 210
Number of inadmissible proposals: 3
Number of ineligible proposals: 5
Number of above-threshold proposals: 155
Total budget requested for above-threshold proposals: EUR 1,123,924,110.83
We recently informed the applicants about the evaluation results for their proposals.
Please note that the number of proposals that can finally be funded will depend on the finally available budget and the formal selection by the Commission.
For questions, please contact the Research Enquiry Service.
EVALUATION RESULTS
Call for proposals: HORIZON-CL4-2023-TWIN-TRANSITION-01
Deadline: 20 April 2023
Available budget: EUR 334,270,000.00
The results of the evaluation are as follows:
Number of proposals submitted (including proposals transferred from or to other calls): 210
Number of inadmissible proposals: 3
Number of ineligible proposals: 5
Number of above-threshold proposals: 155
Total budget requested for above-threshold proposals: EUR 1,123,924,110.83
We recently informed the applicants about the evaluation results for their proposals.
Please note that the number of proposals that can finally be funded will depend on the finally available budget and the formal selection by the Commission.
For questions, please contact the Research Enquiry Service.
PROPOSAL NUMBERS
Call HORIZON-CL4-2023-TWIN-TRANSITION-01 has closed on the 20th April 2023.
210 proposals have been submitted.
The breakdown per topic is:
· HORIZON-CL4-2023-TWIN-TRANSITION-01-02 51: proposals
· HORIZON-CL4-2023-TWIN-TRANSITION-01-04 31: proposals
· HORIZON-CL4-2023-TWIN-TRANSITION-01-07 42: proposals
· HORIZON-CL4-2023-TWIN-TRANSITION-01-08 04: proposals
· HORIZON-CL4-2023-TWIN-TRANSITION-01-31 14: proposals
· HORIZON-CL4-2023-TWIN-TRANSITION-01-33 06: proposals
· HORIZON-CL4-2023-TWIN-TRANSITION-01-36 06: proposals
· HORIZON-CL4-2023-TWIN-TRANSITION-01-37 06: proposals
· HORIZON-CL4-2023-TWIN-TRANSITION-01-40 14: proposals
· HORIZON-CL4-2023-TWIN-TRANSITION-01-42 26: proposals
· HORIZON-CL4-2023-TWIN-TRANSITION-01-43 02: proposals
· HORIZON-CL4-2023-TWIN-TRANSITION-01-45 08: proposals
Evaluation results are expected to be communicated in July 2023
PROPOSAL NUMBERS
Call HORIZON-CL4-2023-TWIN-TRANSITION-01 has closed on the 20th April 2023.
210 proposals have been submitted.
The breakdown per topic is:
· HORIZON-CL4-2023-TWIN-TRANSITION-01-02 51: proposals
· HORIZON-CL4-2023-TWIN-TRANSITION-01-04 31: proposals
· HORIZON-CL4-2023-TWIN-TRANSITION-01-07 42: proposals
· HORIZON-CL4-2023-TWIN-TRANSITION-01-08 04: proposals
· HORIZON-CL4-2023-TWIN-TRANSITION-01-31 14: proposals
· HORIZON-CL4-2023-TWIN-TRANSITION-01-33 06: proposals
· HORIZON-CL4-2023-TWIN-TRANSITION-01-36 06: proposals
· HORIZON-CL4-2023-TWIN-TRANSITION-01-37 06: proposals
· HORIZON-CL4-2023-TWIN-TRANSITION-01-40 14: proposals
· HORIZON-CL4-2023-TWIN-TRANSITION-01-42 26: proposals
· HORIZON-CL4-2023-TWIN-TRANSITION-01-43 02: proposals
· HORIZON-CL4-2023-TWIN-TRANSITION-01-45 08: proposals
Evaluation results are expected to be communicated in July 2023
Opening date: 2022-12-08 (3 years ago)
Closing date: 2023-04-20 (3 years ago)
Procedure: single-stage
Budget: 30,000,000
Expected grants: 3
Contribution: 10,000,000 - 12,000,000
This call topic has been appended 6 times by the EC with news.
-
2023-08-11
evaluation results call for proposals: h... -
2023-08-11
evaluation results call for proposals: h... -
2023-04-26
proposal numberscall horizon-cl4-2023-tw... -
2023-04-26
proposal numberscall horizon-cl4-2023-tw... -
2022-12-08
the submission session is now available... -
2022-12-08
the submission session is now available...
HORIZON-CL4-2023-TWIN-TRANSITION-01
Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.
There are 11 other topics in this call:
- HORIZON-CL4-2023-TWIN-TRANSITION-01-02
- HORIZON-CL4-2023-TWIN-TRANSITION-01-04
- HORIZON-CL4-2023-TWIN-TRANSITION-01-07
- HORIZON-CL4-2023-TWIN-TRANSITION-01-08
- HORIZON-CL4-2023-TWIN-TRANSITION-01-31
- HORIZON-CL4-2023-TWIN-TRANSITION-01-33
- HORIZON-CL4-2023-TWIN-TRANSITION-01-36
- HORIZON-CL4-2023-TWIN-TRANSITION-01-37
- HORIZON-CL4-2023-TWIN-TRANSITION-01-42
- HORIZON-CL4-2023-TWIN-TRANSITION-01-43
- HORIZON-CL4-2023-TWIN-TRANSITION-01-45
Showing the latest information. Found 213 versions of this call topic in the F&T portal.
Information from
- 2026-10-12_08-35-02
- 2026-10-12_08-34-53
- 2026-10-11_08-34-09
- 2026-10-11_08-34-07
- 2026-10-09_08-33-23
- 2026-10-09_08-33-15
- 2026-10-08_08-36-47
- 2026-10-08_08-36-36
- 2026-10-07_08-37-26
- 2026-10-07_08-32-09
- 2026-10-06_08-33-56
- 2026-10-06_08-33-46
- 2026-10-05_08-35-07
- 2026-10-05_08-30-02
- 2026-10-04_08-31-09
- 2026-10-04_08-31-05
- 2026-10-03_08-29-44
- 2026-10-03_08-29-31
- 2026-10-02_08-34-08
- 2026-10-02_08-31-03
- 2026-10-01_08-36-27
- 2026-10-01_08-33-20
- 2026-09-29_09-11-58
- 2026-09-29_09-08-12
- 2026-09-28_09-11-19
- 2026-09-28_09-07-40
- 2026-09-27_09-11-04
- 2026-09-27_09-07-12
- 2026-09-26_09-07-22
- 2026-09-26_09-03-27
- 2026-09-25_09-08-04
- 2026-09-25_09-04-27
- 2026-09-24_09-11-36
- 2026-09-24_09-08-00
- 2026-09-23_09-05-08
- 2026-09-23_09-01-41
- 2026-09-22_09-06-03
- 2026-09-22_09-02-21
- 2026-09-21_09-01-45
- 2026-09-21_08-58-12
- 2026-09-20_09-03-04
- 2026-09-20_08-59-37
- 2026-09-19_08-59-12
- 2026-09-19_08-55-54
- 2026-09-18_09-05-15
- 2026-09-18_09-01-54
- 2026-09-17_09-00-04
- 2026-09-17_08-56-38
- 2026-09-16_08-57-55
- 2026-09-16_08-54-13
- 2026-09-15_09-00-13
- 2026-09-15_08-56-37
- 2026-09-14_08-58-54
- 2026-09-14_08-55-33
- 2026-09-13_08-56-57
- 2026-09-13_08-53-48
- 2026-09-12_09-00-29
- 2026-09-12_08-57-12
- 2026-09-11_08-59-21
- 2026-09-11_08-56-01
- 2026-09-10_08-58-27
- 2026-09-10_08-55-07
- 2026-09-09_08-59-23
- 2026-09-09_08-56-01
- 2026-09-08_08-56-28
- 2026-09-08_08-53-19
- 2026-09-07_08-57-01
- 2026-09-07_08-53-28
- 2026-09-06_08-55-15
- 2026-09-06_08-51-59
- 2026-09-05_08-53-19
- 2026-09-05_08-50-07
- 2026-09-04_08-52-18
- 2026-09-04_08-48-53
- 2026-09-03_08-52-16
- 2026-09-03_08-48-27
- 2026-09-02_08-53-00
- 2026-09-02_08-49-54
- 2026-09-01_08-52-53
- 2026-09-01_08-49-46
- 2026-08-31_08-56-39
- 2026-08-31_08-53-15
- 2026-08-30_08-45-44
- 2026-08-30_08-42-33
- 2026-08-29_08-48-41
- 2026-08-29_08-45-29
- 2026-08-28_08-53-10
- 2026-08-28_08-49-48
- 2026-08-27_08-41-29
- 2026-08-27_08-38-21
- 2026-08-25_08-48-06
- 2026-08-25_08-44-24
- 2026-08-24_08-43-31
- 2026-08-24_08-39-58
- 2026-08-23_08-40-51
- 2026-08-23_08-37-14
- 2026-08-22_08-42-08
- 2026-08-22_08-38-37
- 2026-08-21_08-36-12
- 2026-08-21_08-32-31
- 2026-08-20_08-41-11
- 2026-08-20_08-37-36
- 2026-08-19_08-39-48
- 2026-08-19_08-36-03
- 2026-08-18_08-34-32
- 2026-08-18_08-30-48
- 2026-08-17_08-35-53
- 2026-08-17_08-32-22
- 2026-08-16_08-29-53
- 2026-08-16_08-26-45
- 2026-08-15_08-45-26
- 2026-08-15_08-42-00
- 2026-08-14_08-33-25
- 2026-08-14_08-30-19
- 2026-08-13_08-29-42
- 2026-08-13_08-26-43
- 2026-08-12_08-29-05
- 2026-08-12_08-26-08
- 2026-08-11_08-31-48
- 2026-08-11_08-28-30
- 2026-08-10_08-29-06
- 2026-08-10_08-25-39
- 2026-08-09_08-27-04
- 2026-08-09_08-24-00
- 2026-08-08_08-25-20
- 2026-08-08_08-21-46
- 2026-08-07_08-24-38
- 2026-08-07_08-21-09
- 2026-08-06_08-24-55
- 2026-08-06_08-21-51
- 2026-08-05_08-26-51
- 2026-08-05_08-23-36
- 2026-08-04_08-27-14
- 2026-08-04_08-23-43
- 2026-08-03_08-25-12
- 2026-08-03_08-21-44
- 2026-08-02_08-23-08
- 2026-08-02_08-19-53
- 2026-08-01_08-24-56
- 2026-08-01_08-21-34
- 2026-07-31_08-22-50
- 2026-07-31_08-19-54
- 2026-07-30_08-21-22
- 2026-07-30_08-18-21
- 2026-07-29_08-23-11
- 2026-07-29_08-20-14
- 2026-07-28_08-22-33
- 2026-07-28_08-19-28
- 2026-07-27_08-17-18
- 2026-07-27_08-13-56
- 2026-07-26_08-15-03
- 2026-07-26_08-11-33
- 2026-07-25_08-15-15
- 2026-07-25_08-12-03
- 2026-07-24_08-16-21
- 2026-07-24_08-12-43
- 2026-07-23_08-15-31
- 2026-07-23_08-12-34
- 2026-07-22_08-17-14
- 2026-07-22_08-14-13
- 2026-07-21_08-14-14
- 2026-07-21_08-10-50
- 2026-07-20_08-13-45
- 2026-07-20_08-11-02
- 2026-07-19_08-14-23
- 2026-07-19_08-11-34
- 2026-07-18_08-14-29
- 2026-07-18_08-11-28
- 2026-07-17_08-13-27
- 2026-07-17_08-10-41
- 2026-07-16_07-52-35
- 2026-07-16_07-50-22
- 2026-07-15_07-52-35
- 2026-07-15_07-50-06
- 2026-07-14_07-51-07
- 2026-07-14_07-48-42
- 2026-07-13_07-51-54
- 2026-07-13_07-49-41
- 2026-07-12_07-51-33
- 2026-07-12_07-49-02
- 2026-07-11_07-50-12
- 2026-07-11_07-47-41
- 2026-07-10_07-50-10
- 2026-07-10_07-47-47
- 2026-07-09_07-50-20
- 2026-07-09_07-47-57
- 2026-07-08_07-50-02
- 2026-07-08_07-47-34
- 2026-07-07_07-49-51
- 2026-07-07_07-47-15
- 2026-07-06_07-50-13
- 2026-07-06_07-48-03
- 2026-07-05_07-46-11
- 2026-07-05_07-43-56
- 2026-07-04_07-47-19
- 2026-07-04_07-45-31
- 2026-07-03_07-47-35
- 2026-07-03_07-45-32
- 2026-07-02_07-46-26
- 2026-07-02_07-44-22
- 2026-07-01_08-13-37
- 2026-07-01_08-12-22
- 2026-06-30_09-49-36
- 2026-06-30_08-09-55
- 2026-06-29_11-35-25
- 2026-06-29_08-13-08
- 2026-06-28_09-32-39
- 2026-06-28_08-05-14
- 2026-06-27_09-33-19
- 2026-06-27_08-05-40
- 2026-06-27_08-04-29
- 2026-02-18_07-05-57
- 2024-03-30_14-19-09
Check the differences between the versions.
Annotations
Events
Hand-picked events relevant to this call topic.
No events yet
There are currently no events linked to this call topic.
Timeline
Call published · 30 Sep 2024 (2 years ago)
All expected milestones for this call have passed.
Work programme published
07 Oct 2022 · est.
Call opens
08 Dec 2022
Call closes
20 Apr 2023
Outcome expected
20 Sep 2023 · est.
Grant agreement signed
20 Dec 2023 · est.
Call published
30 Sep 2024
-
Work programme published Estimated
07 Oct 2022 · 4 years ago
Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.
-
Call opens
08 Dec 2022 · 3 years ago
Submissions can be made from this date.
-
Call closes
20 Apr 2023 · 3 years ago
Deadline to submit a proposal.
-
Outcome expected Estimated
20 Sep 2023 · 3 years ago
The maximum time to inform applicants of the evaluation outcome is five months after the call closes.
-
Grant agreement signed Estimated
20 Dec 2023 · 2 years ago
The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.
-
Call published
30 Sep 2024 · 2 years ago
This topic was first published in TopicTree.
Funded Projects
Loading...
Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)
Ecosystem bubbles
This call topic is part of the following thematic bubbles.