Closed HORIZON-CL4-2023-TWIN-TRANSITION-01-33 HORIZON

Electrification of high temperature heating systems (Processes4Planet Partnership) (IA)

Call text (as on F&T portal)

View on F&T portal

Expected Outcome:

Projects outcomes will enable achieving the objectives of the Processes4Planet partnership, and the transition of the process industry towards climate neutrality, by developing new electrified processes, ensuring process flexibility, and capturing the full potential of renewable energy (related to P4Planet operational objective 1).

Projects are expected to contribute to the following outcomes:

  • Demonstrate the use of advanced electric heating technologies for high temperature demand systems in the process industry;
  • Prove the effectiveness of the technologies towards GHG emission avoidance;
  • Reduce process emissions of high temperature heating systems by at least 30% compared to current state of the art levels of the process with fossil-based heating system;
  • Enable the integration of renewable electricity in the process industries to substitute fossil fuels for heating, thereby contributing to the independence from fossil fuel and fossil fuel imports as put forward in the REPowerEU Plan[1];
  • Showcase the scalability and the cost efficiency of the proposed solutions;
  • Enable the economic viability of the entire unit to compete with the existing state of the art of fossil-based heating systems and increase of the competitiveness and resilience of the European process industry.

Scope:

High temperature (over 400 °C) industrial heating systems, powered by fossil fuel combustion, are responsible for 20% of process industries GHG emissions. The topic focuses on the sustainable electrification of high temperature heating systems, for example, industrial furnaces, kilns and crackers among others. Electrification of these heating systems with renewable electricity could represent a major reduction of the related GHG emissions.

The proposals should:

  • Integrate existing highly efficient technologies, e.g., induction heating, hybrid operation between electric heating and zero-carbon fuel heating microwave and plasma technologies, electric resistances, and/or the combination with digital technologies or hybrid modelling; this may include the development of high temperature heat storage for flexible usage of electricity (load shifting) or renewable electricity production (production fluctuation);
  • Take a holistic approach which may include aspects such as advanced materials requirements and appropriate equipment design;
  • Improve the process safety, flexibility, and ease of process control;
  • Showcase the improved performance through at least one realistic use case that can be replicable in more than one process industry sector with demonstrable economic return.

The inclusion of a GHG avoidance methodology[2] is recommended and should provide detailed descriptions of baselines and projected emissions reduction.

Proposals submitted under this topic should include a strong business case and sound exploitation strategy, as outlined in the introduction to this Destination. As a project output a more elaborated exploitation plan should be developed including preliminary plans for scalability, commercialisation, and deployment (feasibility study, business plan and financial model) indicating the possible funding sources to be potentially used (e.g., Innovation Fund, InvestEU, ESIF). Societal and environmental impact and implications for the workplace (such as skills, organisational change) should be outlined.

Research must build on existing standards or contribute to standardisation. Where relevant, interoperability for data sharing should be addressed.

Proposals should build on or seek collaboration with existing projects and develop synergies with other relevant European, national or regional initiatives, funding programs and platforms and are encouraged to consider the use of their expected outcomes in a wider approach that might benefit the establishment of Hubs for Circularity.

This topic implements the co-programmed European partnership Processes4Planet.

null

Activities are expected to start at TRL 5 and achieve TRL 7 by the end of the project – see General Annex B.

[1] COM/2022/230 final

[2] That could follow Innovation Fund methodology: https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/innovfund/wp-call/2021/call-annex_c_innovfund-lsc-2021_en.pdf

News flashes

2023-08-11

EVALUATION RESULTS

Call for proposals: HORIZON-CL4-2023-TWIN-TRANSITION-01

Deadline: 20 April 2023

Available budget: EUR 334,270,000.00

The results of the evaluation are as follows:

Number of proposals submitted (including proposals transferred from or to other calls): 210

Number of inadmissible proposals: 3

Number of ineligible proposals: 5

Number of above-threshold proposals: 155

Total budget requested for above-threshold proposals: EUR 1,123,924,110.83

We recently informed the applicants about the evaluation results for their proposals.

Please note that the number of proposals that can finally be funded will depend on the finally available budget and the formal selection by the Commission.

For questions, please contact the Research Enquiry Service.

 

2023-08-11

EVALUATION RESULTS

Call for proposals: HORIZON-CL4-2023-TWIN-TRANSITION-01

Deadline: 20 April 2023

Available budget: EUR 334,270,000.00

The results of the evaluation are as follows:

Number of proposals submitted (including proposals transferred from or to other calls): 210

Number of inadmissible proposals: 3

Number of ineligible proposals: 5

Number of above-threshold proposals: 155

Total budget requested for above-threshold proposals: EUR 1,123,924,110.83

We recently informed the applicants about the evaluation results for their proposals.

Please note that the number of proposals that can finally be funded will depend on the finally available budget and the formal selection by the Commission.

For questions, please contact the Research Enquiry Service.

 

2023-04-26

PROPOSAL NUMBERS

Call HORIZON-CL4-2023-TWIN-TRANSITION-01 has closed on the 20th April 2023.

210 proposals have been submitted.

The breakdown per topic is:

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-02             51: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-04             31: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-07             42: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-08             04: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-31             14: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-33             06: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-36             06: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-37             06: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-40             14: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-42             26: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-43             02: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-45             08: proposals

 

Evaluation results are expected to be communicated in July 2023

2023-04-26

PROPOSAL NUMBERS

Call HORIZON-CL4-2023-TWIN-TRANSITION-01 has closed on the 20th April 2023.

210 proposals have been submitted.

The breakdown per topic is:

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-02             51: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-04             31: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-07             42: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-08             04: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-31             14: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-33             06: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-36             06: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-37             06: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-40             14: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-42             26: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-43             02: proposals

·       HORIZON-CL4-2023-TWIN-TRANSITION-01-45             08: proposals

 

Evaluation results are expected to be communicated in July 2023

2022-12-08
The submission session is now available for: HORIZON-CL4-2023-TWIN-TRANSITION-01-33(HORIZON-IA), HORIZON-CL4-2023-TWIN-TRANSITION-01-31(HORIZON-RIA), HORIZON-CL4-2023-TWIN-TRANSITION-01-02(HORIZON-IA), HORIZON-CL4-2023-TWIN-TRANSITION-01-43(HORIZON-IA), HORIZON-CL4-2023-TWIN-TRANSITION-01-45(HORIZON-RIA), HORIZON-CL4-2023-TWIN-TRANSITION-01-37(HORIZON-IA), HORIZON-CL4-2023-TWIN-TRANSITION-01-07(HORIZON-RIA), HORIZON-CL4-2023-TWIN-TRANSITION-01-36(HORIZON-RIA), HORIZON-CL4-2023-TWIN-TRANSITION-01-40(HORIZON-RIA), HORIZON-CL4-2023-TWIN-TRANSITION-01-42(HORIZON-RIA), HORIZON-CL4-2023-TWIN-TRANSITION-01-08(HORIZON-CSA), HORIZON-CL4-2023-TWIN-TRANSITION-01-04(HORIZON-IA)
2022-12-08
The submission session is now available for: HORIZON-CL4-2023-TWIN-TRANSITION-01-33(HORIZON-IA), HORIZON-CL4-2023-TWIN-TRANSITION-01-31(HORIZON-RIA), HORIZON-CL4-2023-TWIN-TRANSITION-01-02(HORIZON-IA), HORIZON-CL4-2023-TWIN-TRANSITION-01-43(HORIZON-IA), HORIZON-CL4-2023-TWIN-TRANSITION-01-45(HORIZON-RIA), HORIZON-CL4-2023-TWIN-TRANSITION-01-37(HORIZON-IA), HORIZON-CL4-2023-TWIN-TRANSITION-01-07(HORIZON-RIA), HORIZON-CL4-2023-TWIN-TRANSITION-01-36(HORIZON-RIA), HORIZON-CL4-2023-TWIN-TRANSITION-01-40(HORIZON-RIA), HORIZON-CL4-2023-TWIN-TRANSITION-01-42(HORIZON-RIA), HORIZON-CL4-2023-TWIN-TRANSITION-01-08(HORIZON-CSA), HORIZON-CL4-2023-TWIN-TRANSITION-01-04(HORIZON-IA)
call topic details
Call status: Closed
Opening date: 2022-12-08 (3 years ago)
Closing date: 2023-04-20 (3 years ago)
Procedure: single-stage

Budget: 35,670,000
Expected grants: 3
Contribution: 12,000,000 - 15,000,000
News flashes

This call topic has been appended 6 times by the EC with news.

  • 2023-08-11
    evaluation results call for proposals: h...
  • 2023-08-11
    evaluation results call for proposals: h...
  • 2023-04-26
    proposal numberscall horizon-cl4-2023-tw...
  • 2023-04-26
    proposal numberscall horizon-cl4-2023-tw...
  • 2022-12-08
    the submission session is now available...
  • 2022-12-08
    the submission session is now available...
Source information

Showing the latest information. Found 213 versions of this call topic in the F&T portal.

Information from

  • 2026-10-12_08-37-41
  • 2026-10-12_08-34-52
  • 2026-10-11_08-36-49
  • 2026-10-11_08-34-07
  • 2026-10-09_08-36-00
  • 2026-10-09_08-33-12
  • 2026-10-08_08-39-27
  • 2026-10-08_08-36-35
  • 2026-10-07_08-36-43
  • 2026-10-07_08-32-07
  • 2026-10-06_08-36-36
  • 2026-10-06_08-33-43
  • 2026-10-05_08-34-25
  • 2026-10-05_08-29-59
  • 2026-10-04_08-33-43
  • 2026-10-04_08-31-06
  • 2026-10-03_08-32-22
  • 2026-10-03_08-29-29
  • 2026-10-02_08-31-12
  • 2026-10-02_08-31-04
  • 2026-10-01_08-33-32
  • 2026-10-01_08-33-21
  • 2026-09-29_09-08-22
  • 2026-09-29_09-08-12
  • 2026-09-28_09-07-49
  • 2026-09-28_09-07-40
  • 2026-09-27_09-07-29
  • 2026-09-27_09-07-13
  • 2026-09-26_09-03-33
  • 2026-09-26_09-03-27
  • 2026-09-25_09-04-34
  • 2026-09-25_09-04-28
  • 2026-09-24_09-08-15
  • 2026-09-24_09-08-00
  • 2026-09-23_09-01-57
  • 2026-09-23_09-01-41
  • 2026-09-22_09-02-31
  • 2026-09-22_09-02-21
  • 2026-09-21_08-58-24
  • 2026-09-21_08-58-12
  • 2026-09-20_08-59-50
  • 2026-09-20_08-59-37
  • 2026-09-19_08-56-05
  • 2026-09-19_08-55-54
  • 2026-09-18_09-02-05
  • 2026-09-18_09-01-54
  • 2026-09-17_08-56-52
  • 2026-09-17_08-56-39
  • 2026-09-16_08-54-20
  • 2026-09-16_08-54-14
  • 2026-09-15_08-56-53
  • 2026-09-15_08-56-37
  • 2026-09-14_08-55-45
  • 2026-09-14_08-55-33
  • 2026-09-13_08-54-00
  • 2026-09-13_08-53-48
  • 2026-09-12_08-57-22
  • 2026-09-12_08-57-12
  • 2026-09-11_08-56-12
  • 2026-09-11_08-56-01
  • 2026-09-10_08-55-16
  • 2026-09-10_08-55-07
  • 2026-09-09_08-56-14
  • 2026-09-09_08-56-01
  • 2026-09-08_08-53-32
  • 2026-09-08_08-53-19
  • 2026-09-07_08-53-40
  • 2026-09-07_08-53-29
  • 2026-09-06_08-52-07
  • 2026-09-06_08-51-59
  • 2026-09-05_08-50-21
  • 2026-09-05_08-50-07
  • 2026-09-04_08-49-07
  • 2026-09-04_08-48-54
  • 2026-09-03_08-48-39
  • 2026-09-03_08-48-28
  • 2026-09-02_08-50-05
  • 2026-09-02_08-49-55
  • 2026-09-01_08-49-57
  • 2026-09-01_08-49-46
  • 2026-08-31_08-53-26
  • 2026-08-31_08-53-16
  • 2026-08-30_08-42-45
  • 2026-08-30_08-42-33
  • 2026-08-29_08-45-41
  • 2026-08-29_08-45-29
  • 2026-08-28_08-50-01
  • 2026-08-28_08-49-49
  • 2026-08-27_08-38-27
  • 2026-08-27_08-38-21
  • 2026-08-25_08-44-29
  • 2026-08-25_08-44-24
  • 2026-08-24_08-40-07
  • 2026-08-24_08-39-58
  • 2026-08-23_08-37-22
  • 2026-08-23_08-37-14
  • 2026-08-22_08-38-49
  • 2026-08-22_08-38-38
  • 2026-08-21_08-32-43
  • 2026-08-21_08-32-32
  • 2026-08-20_08-37-50
  • 2026-08-20_08-37-36
  • 2026-08-19_08-36-15
  • 2026-08-19_08-36-03
  • 2026-08-18_08-31-03
  • 2026-08-18_08-30-49
  • 2026-08-17_08-32-32
  • 2026-08-17_08-32-23
  • 2026-08-16_08-26-57
  • 2026-08-16_08-26-45
  • 2026-08-15_08-42-05
  • 2026-08-15_08-42-01
  • 2026-08-14_08-30-31
  • 2026-08-14_08-30-19
  • 2026-08-13_08-26-53
  • 2026-08-13_08-26-43
  • 2026-08-12_08-26-19
  • 2026-08-12_08-26-08
  • 2026-08-11_08-28-43
  • 2026-08-11_08-28-31
  • 2026-08-10_08-26-07
  • 2026-08-10_08-25-45
  • 2026-08-09_08-24-11
  • 2026-08-09_08-24-01
  • 2026-08-08_08-21-58
  • 2026-08-08_08-21-47
  • 2026-08-07_08-21-21
  • 2026-08-07_08-21-20
  • 2026-08-06_08-22-01
  • 2026-08-06_08-21-51
  • 2026-08-05_08-23-49
  • 2026-08-05_08-23-36
  • 2026-08-04_08-23-55
  • 2026-08-04_08-23-43
  • 2026-08-03_08-21-56
  • 2026-08-03_08-21-45
  • 2026-08-02_08-20-03
  • 2026-08-02_08-19-54
  • 2026-08-01_08-21-46
  • 2026-08-01_08-21-34
  • 2026-07-31_08-20-04
  • 2026-07-31_08-19-55
  • 2026-07-30_08-18-31
  • 2026-07-30_08-18-21
  • 2026-07-29_08-20-23
  • 2026-07-29_08-20-14
  • 2026-07-28_08-19-41
  • 2026-07-28_08-19-28
  • 2026-07-27_08-14-06
  • 2026-07-27_08-13-56
  • 2026-07-26_08-11-43
  • 2026-07-26_08-11-33
  • 2026-07-25_08-12-13
  • 2026-07-25_08-12-04
  • 2026-07-24_08-12-54
  • 2026-07-24_08-12-43
  • 2026-07-23_08-12-45
  • 2026-07-23_08-12-34
  • 2026-07-22_08-14-21
  • 2026-07-22_08-14-13
  • 2026-07-21_08-11-00
  • 2026-07-21_08-10-50
  • 2026-07-20_08-11-08
  • 2026-07-20_08-11-02
  • 2026-07-19_08-11-45
  • 2026-07-19_08-11-34
  • 2026-07-18_08-11-39
  • 2026-07-18_08-11-29
  • 2026-07-17_08-10-47
  • 2026-07-17_08-10-41
  • 2026-07-16_07-50-29
  • 2026-07-16_07-50-22
  • 2026-07-15_07-50-10
  • 2026-07-15_07-50-06
  • 2026-07-14_07-48-49
  • 2026-07-14_07-48-43
  • 2026-07-13_07-49-45
  • 2026-07-13_07-49-41
  • 2026-07-12_07-49-09
  • 2026-07-12_07-49-02
  • 2026-07-11_07-47-47
  • 2026-07-11_07-47-41
  • 2026-07-10_07-47-56
  • 2026-07-10_07-47-48
  • 2026-07-09_07-48-00
  • 2026-07-09_07-47-57
  • 2026-07-08_07-47-40
  • 2026-07-08_07-47-34
  • 2026-07-07_07-47-22
  • 2026-07-07_07-47-15
  • 2026-07-06_07-48-05
  • 2026-07-06_07-48-03
  • 2026-07-05_07-44-03
  • 2026-07-05_07-43-56
  • 2026-07-04_07-45-34
  • 2026-07-04_07-45-31
  • 2026-07-03_07-45-39
  • 2026-07-03_07-45-32
  • 2026-07-02_07-44-27
  • 2026-07-02_07-44-22
  • 2026-07-01_08-16-26
  • 2026-07-01_08-12-22
  • 2026-06-30_09-49-35
  • 2026-06-30_08-11-29
  • 2026-06-29_11-35-25
  • 2026-06-29_08-14-47
  • 2026-06-28_09-32-38
  • 2026-06-28_08-06-30
  • 2026-06-27_09-33-19
  • 2026-06-27_08-07-04
  • 2026-06-27_08-04-29
  • 2026-02-18_07-05-56
  • 2024-03-30_14-17-38

Check the differences between the versions.

Annotations

You must be logged in to add annotations
No annotations yet

Events

Hand-picked events relevant to this call topic.

No events yet

There are currently no events linked to this call topic.

Timeline

Track where this call stands in its lifecycle, from work programme to grant signature, and see what's likely to happen next.

Call published · 30 Sep 2024 (2 years ago)

All expected milestones for this call have passed.

Today

Work programme published

07 Oct 2022 · est.

Call opens

08 Dec 2022

Call closes

20 Apr 2023

Outcome expected

20 Sep 2023 · est.

Grant agreement signed

20 Dec 2023 · est.

Call published

30 Sep 2024

Preparation Open for submission Evaluation Grant preparation Not yet reached
  1. Work programme published Estimated

    07 Oct 2022 · 4 years ago

    Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.

  2. Call opens

    08 Dec 2022 · 3 years ago

    Submissions can be made from this date.

  3. Call closes

    20 Apr 2023 · 3 years ago

    Deadline to submit a proposal.

  4. Outcome expected Estimated

    20 Sep 2023 · 3 years ago

    The maximum time to inform applicants of the evaluation outcome is five months after the call closes.

  5. Grant agreement signed Estimated

    20 Dec 2023 · 2 years ago

    The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.

  6. Call published

    30 Sep 2024 · 2 years ago

    This topic was first published in TopicTree.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Ecosystem bubbles

This call topic is part of the following thematic bubbles.

Not part of a bubble yet

This call topic has not been grouped into an ecosystem bubble.

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal