HORIZON-CL4-2023-SPACE-01-62

Quantum Communication Technologies for space systems -

Related topics

Drag to rearrange · hover a topic or connection to preview why it's linked, click to pin that panel open

Topics in this graph

Bold node = current topic · node color = call status · hover for details, click to pin · smaller, lighter topics are two steps away

Call text (as on F&T portal)

View on F&T portal

Expected Outcome:

  • Support the EU space policy and the EU initiative to establish the Union Secure Connectivity Programme and foster the development of ultra-secure EU services based on or using space systems
  • Ensure the EU sovereignty and non-dependence for the development of capacities leading to the availability of ultra-secure services based on Quantum Key Distribution (QKD).
  • Enhance the TRL of the critical components necessary to build QKD space systems and foster the development of the associated QKD standards.

These outcomes will contribute to securing the autonomy of supply for critical technologies and equipment for QKD space systems in the EU and foster the EU's space sector competitiveness by developing the associated ecosystem, in line with the Expected Impact of the destination. Security aspects shall be considered in all targeted developments.

Proposals must address all the above-mentioned, expected outcomes.

Two proposals will be selected under this call.

Scope:

The scope of this topic is the development of the critical components and technologies necessary to build a space quantum key distribution system. Based on the principle that any component used to generate, store, transmit, receive, decode, or use quantum information is considered a critical component, the scope of this topic covers all the critical hardware and software components necessary for the quantum key distribution function to be implemented via a satellite payload, as well as the corresponding optical ground station. Proposals will consider both Prepare and Measure (P&M) and Entangled protocols. In addition, proposals should address the issue of standardisation for QKD space systems. Proposals should propose and implement the development of international space QKD standards in existing standardisation bodies working groups (e.g. (e.g. ETSI, European Telecommunications Standards Institute) or propose and implement the creation of new standardisation activities through the creation of additional working groups.

In this topic the integration of the gender dimension (sex and gender analysis) in research and innovation content is not a mandatory requirement.

null

Activities are expected to achieve TRL 5-6 by the end of the project – The reference TRL definition is the ISO 16290:2013 applicable to the space sector.

News flashes

2023-07-24

 An overview of the HORIZON-CL4-2023-SPACE-01 evaluation results (Flash Call Info) is now available under the link.

2023-07-24

 An overview of the HORIZON-CL4-2023-SPACE-01 evaluation results (Flash Call Info) is now available under the link.

2023-03-28

 

Call HORIZON-CL4-2023-SPACE-01 has closed on the 28/03/2023.

 

142 proposals have been submitted.

 

The breakdown per topic is:

• HORIZON-CL4-2023-SPACE-01-11: 11 proposals

• HORIZON-CL4-2023-SPACE-01-12: 38 proposals

• HORIZON-CL4-2023-SPACE-01-13: 1 proposal

• HORIZON-CL4-2023-SPACE-01-21: 1 proposal

• HORIZON-CL4-2023-SPACE-01-22: 17 proposals

• HORIZON-CL4-2023-SPACE-01-23: 4 proposals

• HORIZON-CL4-2023-SPACE-01-31: 4 proposals

• HORIZON-CL4-2023-SPACE-01-32: 5 proposals

• HORIZON-CL4-2023-SPACE-01-33: 0 proposals

• HORIZON-CL4-2023-SPACE-01-34: 3 proposals

• HORIZON-CL4-2023-SPACE-01-62: 7 proposals

• HORIZON-CL4-2023-SPACE-01-63: 1 proposal

• HORIZON-CL4-2023-SPACE-01-71: 37 proposals

• HORIZON-CL4-2023-SPACE-01-72: 13 proposals

 

Evaluation results are expected to be communicated in the 2nd half of July 2023.

 
2023-03-28

 

Call HORIZON-CL4-2023-SPACE-01 has closed on the 28/03/2023.

 

142 proposals have been submitted.

 

The breakdown per topic is:

• HORIZON-CL4-2023-SPACE-01-11: 11 proposals

• HORIZON-CL4-2023-SPACE-01-12: 38 proposals

• HORIZON-CL4-2023-SPACE-01-13: 1 proposal

• HORIZON-CL4-2023-SPACE-01-21: 1 proposal

• HORIZON-CL4-2023-SPACE-01-22: 17 proposals

• HORIZON-CL4-2023-SPACE-01-23: 4 proposals

• HORIZON-CL4-2023-SPACE-01-31: 4 proposals

• HORIZON-CL4-2023-SPACE-01-32: 5 proposals

• HORIZON-CL4-2023-SPACE-01-33: 0 proposals

• HORIZON-CL4-2023-SPACE-01-34: 3 proposals

• HORIZON-CL4-2023-SPACE-01-62: 7 proposals

• HORIZON-CL4-2023-SPACE-01-63: 1 proposal

• HORIZON-CL4-2023-SPACE-01-71: 37 proposals

• HORIZON-CL4-2023-SPACE-01-72: 13 proposals

 

Evaluation results are expected to be communicated in the 2nd half of July 2023.

 
2022-12-23
The submission session is now available for: HORIZON-CL4-2023-SPACE-01-63(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-33(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-32(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-34(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-62(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-72(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-31(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-71(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-23(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-21(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-22(HORIZON-RIA)
2022-12-23
The submission session is now available for: HORIZON-CL4-2023-SPACE-01-63(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-33(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-32(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-34(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-62(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-72(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-31(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-71(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-23(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-21(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-22(HORIZON-RIA)
2022-12-22
The submission session is now available for: HORIZON-CL4-2023-SPACE-01-63(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-33(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-11(HORIZON-IA), HORIZON-CL4-2023-SPACE-01-12(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-32(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-34(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-62(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-72(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-31(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-71(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-23(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-13(HORIZON-CSA)
2022-12-22
The submission session is now available for: HORIZON-CL4-2023-SPACE-01-63(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-33(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-11(HORIZON-IA), HORIZON-CL4-2023-SPACE-01-12(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-32(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-34(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-62(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-72(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-31(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-71(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-23(HORIZON-RIA), HORIZON-CL4-2023-SPACE-01-13(HORIZON-CSA)
call topic details
Call status: Closed
Opening date: 2022-12-22 (3 years ago)
Closing date: 2023-03-28 (3 years ago)
Procedure: single-stage

Budget: 5,000,000
Expected grants: 2
Contribution: 2,000,000 - 2,500,000
News flashes

This call topic has been appended 8 times by the EC with news.

  • 2023-07-24
     an overview of the horizon-cl4-202...
  • 2023-07-24
     an overview of the horizon-cl4-202...
  • 2023-03-28
     call horizon-cl4-2023-space-01 has...
  • 2023-03-28
     call horizon-cl4-2023-space-01 has...
  • 2022-12-23
    the submission session is now available...
  • 2022-12-23
    the submission session is now available...
  • 2022-12-22
    the submission session is now available...
  • 2022-12-22
    the submission session is now available...
Source information

Showing the latest information. Found 208 versions of this call topic in the F&T portal.

Information from

  • 2026-10-08_08-27-27
  • 2026-10-08_08-26-48
  • 2026-10-07_08-23-22
  • 2026-10-07_08-22-32
  • 2026-10-06_08-25-18
  • 2026-10-06_08-24-35
  • 2026-10-05_08-21-17
  • 2026-10-05_08-20-34
  • 2026-10-04_08-22-53
  • 2026-10-04_08-22-09
  • 2026-10-03_08-21-09
  • 2026-10-03_08-20-24
  • 2026-10-02_08-24-38
  • 2026-10-02_08-21-26
  • 2026-10-01_08-26-57
  • 2026-10-01_08-23-58
  • 2026-09-29_09-00-13
  • 2026-09-29_08-56-02
  • 2026-09-28_08-59-49
  • 2026-09-28_08-55-41
  • 2026-09-27_08-58-52
  • 2026-09-27_08-54-29
  • 2026-09-26_08-55-23
  • 2026-09-26_08-51-07
  • 2026-09-25_08-56-41
  • 2026-09-25_08-52-48
  • 2026-09-24_09-00-08
  • 2026-09-24_08-55-19
  • 2026-09-23_08-54-05
  • 2026-09-23_08-49-59
  • 2026-09-22_08-54-43
  • 2026-09-22_08-50-09
  • 2026-09-21_08-50-20
  • 2026-09-21_08-46-02
  • 2026-09-20_08-51-49
  • 2026-09-20_08-47-22
  • 2026-09-19_08-48-29
  • 2026-09-19_08-44-28
  • 2026-09-18_08-54-00
  • 2026-09-18_08-50-05
  • 2026-09-17_08-49-11
  • 2026-09-17_08-45-04
  • 2026-09-16_08-46-59
  • 2026-09-16_08-42-25
  • 2026-09-15_08-49-00
  • 2026-09-15_08-44-15
  • 2026-09-14_08-48-09
  • 2026-09-14_08-43-49
  • 2026-09-13_08-46-18
  • 2026-09-13_08-42-20
  • 2026-09-12_08-49-52
  • 2026-09-12_08-45-57
  • 2026-09-11_08-48-38
  • 2026-09-11_08-44-47
  • 2026-09-10_08-47-33
  • 2026-09-10_08-43-31
  • 2026-09-09_08-48-18
  • 2026-09-09_08-44-21
  • 2026-09-08_08-45-42
  • 2026-09-08_08-42-13
  • 2026-09-07_08-45-55
  • 2026-09-07_08-41-56
  • 2026-09-06_08-44-46
  • 2026-09-06_08-40-40
  • 2026-09-05_08-42-50
  • 2026-09-05_08-39-04
  • 2026-09-04_08-41-04
  • 2026-09-04_08-37-33
  • 2026-09-03_08-41-35
  • 2026-09-03_08-37-47
  • 2026-09-02_08-42-43
  • 2026-09-02_08-39-13
  • 2026-09-01_08-41-27
  • 2026-09-01_08-38-42
  • 2026-08-31_08-45-57
  • 2026-08-31_08-42-13
  • 2026-08-30_08-35-20
  • 2026-08-30_08-31-45
  • 2026-08-29_08-37-52
  • 2026-08-29_08-34-36
  • 2026-08-28_08-42-11
  • 2026-08-28_08-38-18
  • 2026-08-27_08-30-48
  • 2026-08-27_08-26-55
  • 2026-08-25_08-37-17
  • 2026-08-25_08-33-50
  • 2026-08-24_08-32-42
  • 2026-08-24_08-29-05
  • 2026-08-23_08-30-24
  • 2026-08-23_08-26-45
  • 2026-08-22_08-31-18
  • 2026-08-22_08-28-04
  • 2026-08-21_08-24-32
  • 2026-08-21_08-22-01
  • 2026-08-20_08-29-08
  • 2026-08-20_08-26-45
  • 2026-08-19_08-27-57
  • 2026-08-19_08-25-46
  • 2026-08-18_08-22-56
  • 2026-08-18_08-20-40
  • 2026-08-17_08-25-12
  • 2026-08-17_08-22-04
  • 2026-08-16_08-19-09
  • 2026-08-16_08-16-55
  • 2026-08-14_08-23-27
  • 2026-08-14_08-20-00
  • 2026-08-13_08-20-15
  • 2026-08-13_08-17-17
  • 2026-08-12_08-19-41
  • 2026-08-12_08-16-14
  • 2026-08-11_08-20-32
  • 2026-08-11_08-18-14
  • 2026-08-10_08-17-07
  • 2026-08-10_08-14-26
  • 2026-08-09_08-16-09
  • 2026-08-09_08-14-04
  • 2026-08-08_08-15-23
  • 2026-08-08_08-12-42
  • 2026-08-07_08-13-30
  • 2026-08-07_08-11-20
  • 2026-08-06_08-13-55
  • 2026-08-06_08-12-03
  • 2026-08-05_08-15-45
  • 2026-08-05_08-13-38
  • 2026-08-04_08-15-55
  • 2026-08-04_08-13-56
  • 2026-08-03_08-15-08
  • 2026-08-03_08-11-53
  • 2026-08-02_08-13-03
  • 2026-08-02_08-10-22
  • 2026-08-01_08-13-54
  • 2026-08-01_08-12-00
  • 2026-07-31_08-13-14
  • 2026-07-31_08-10-24
  • 2026-07-30_08-11-29
  • 2026-07-30_08-08-39
  • 2026-07-29_08-12-33
  • 2026-07-29_08-10-50
  • 2026-07-28_08-12-31
  • 2026-07-28_08-09-43
  • 2026-07-27_08-06-37
  • 2026-07-27_08-04-52
  • 2026-07-26_08-05-06
  • 2026-07-26_08-02-21
  • 2026-07-25_08-04-57
  • 2026-07-25_08-03-05
  • 2026-07-24_08-05-23
  • 2026-07-24_08-03-35
  • 2026-07-23_08-05-18
  • 2026-07-23_08-03-27
  • 2026-07-22_08-07-42
  • 2026-07-22_08-05-04
  • 2026-07-21_08-04-11
  • 2026-07-21_08-01-38
  • 2026-07-20_08-03-50
  • 2026-07-20_08-02-03
  • 2026-07-19_08-05-12
  • 2026-07-19_08-02-43
  • 2026-07-18_08-04-46
  • 2026-07-18_08-02-07
  • 2026-07-17_08-03-16
  • 2026-07-17_08-01-24
  • 2026-07-16_07-44-43
  • 2026-07-16_07-43-19
  • 2026-07-15_07-44-25
  • 2026-07-15_07-42-58
  • 2026-07-14_07-43-47
  • 2026-07-14_07-41-46
  • 2026-07-13_07-44-01
  • 2026-07-13_07-42-40
  • 2026-07-12_07-43-40
  • 2026-07-12_07-42-26
  • 2026-07-11_07-42-27
  • 2026-07-11_07-41-07
  • 2026-07-10_07-43-04
  • 2026-07-10_07-41-09
  • 2026-07-09_07-42-34
  • 2026-07-09_07-41-13
  • 2026-07-08_07-42-18
  • 2026-07-08_07-41-00
  • 2026-07-07_07-42-30
  • 2026-07-07_07-40-38
  • 2026-07-06_07-43-16
  • 2026-07-06_07-41-16
  • 2026-07-05_07-38-55
  • 2026-07-05_07-37-41
  • 2026-07-04_07-41-04
  • 2026-07-04_07-39-25
  • 2026-07-03_07-40-51
  • 2026-07-03_07-38-59
  • 2026-07-02_07-39-19
  • 2026-07-02_07-38-06
  • 2026-07-01_08-02-19
  • 2026-07-01_08-01-06
  • 2026-06-30_09-49-16
  • 2026-06-30_07-59-31
  • 2026-06-29_11-35-08
  • 2026-06-29_08-02-50
  • 2026-06-28_09-32-16
  • 2026-06-28_07-57-01
  • 2026-06-27_09-32-47
  • 2026-06-27_07-57-22
  • 2026-06-27_07-55-58
  • 2026-02-18_07-04-46
  • 2025-06-07_03-33-29
  • 2024-11-04_17-25-46
  • 2024-09-30_21-22-16
  • 2024-03-30_14-18-46

Check the differences between the versions.

Annotations

You must be logged in to add annotations
No annotations yet

Events

Hand-picked events relevant to this call topic.

No events yet

There are currently no events linked to this call topic.

Timeline

Track where this call stands in its lifecycle, from work programme to grant signature, and see what's likely to happen next.

Call published · 30 Sep 2024 (2 years ago)

All expected milestones for this call have passed.

Today

Work programme published

07 Oct 2022 · est.

Call opens

22 Dec 2022

Call closes

28 Mar 2023

Outcome expected

28 Aug 2023 · est.

Grant agreement signed

28 Nov 2023 · est.

Call published

30 Sep 2024

Preparation Open for submission Evaluation Grant preparation Not yet reached
  1. Work programme published Estimated

    07 Oct 2022 · 4 years ago

    Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.

  2. Call opens

    22 Dec 2022 · 3 years ago

    Submissions can be made from this date.

  3. Call closes

    28 Mar 2023 · 3 years ago

    Deadline to submit a proposal.

  4. Outcome expected Estimated

    28 Aug 2023 · 3 years ago

    The maximum time to inform applicants of the evaluation outcome is five months after the call closes.

  5. Grant agreement signed Estimated

    28 Nov 2023 · 2 years ago

    The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.

  6. Call published

    30 Sep 2024 · 2 years ago

    This topic was first published in TopicTree.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal