HORIZON-CL5-2027-05-D4-07

Integrating circularity in LCA-based modelling frameworks for renovation of buildings (Built4People Partnership) -

Call text (as on F&T portal)

View on F&T portal

Expected Outcome:

Project results are expected to contribute to all of the following expected outcomes:

  • Demonstration of measurable reductions in material flows, life cycle energy use and GHG emissions in building renovations that integrate circularity strategies to contribute to achieving net-zero whole life carbon buildings;
  • More robust approach to current modelling frameworks to comprehensively reflect the complexity of circularity strategies in life cycle assessments at building scale.

Scope:

European buildings are increasingly adopting circularity strategies in renovations to reduce life cycle environmental impacts and improve resource efficiency in response to the requirements based on current frameworks, such as Level(s) and WLC models used by Member States based and EN 15978 standard. The complexity of these circularity strategies, such as material reuse and recycling, and addressing the changing nature of assessed systems with long life cycles are critical for achieving more reliable assessment results. Further work is needed to advance and achieve more detailed modelling frameworks that integrate circularity assessment with life cycle assessment, supporting the delivery of net-zero whole-life carbon buildings.

Proposals should address all of the following:

  • Develop a comprehensive modelling framework that integrates circularity assessment in life cycle, covering cradle to cradle system boundary;
  • Apply the developed modelling framework to at least three real-life buildings in different climatic regions in different Member States or Associated Countries, for which renovation project developers have adopted ambitious circularity strategies to achieve zero whole-life carbon buildings. Circularity strategies should include reuse and/or recycle, as well as at least one of the following: reduce, repair, refurbish, remanufacture, and repurpose;
  • Assess the embodied emissions (from materials, products, and construction processes) and operational emissions (from energy use for HVAC, DHW, electrical appliances, lighting) of the real-life buildings subjected to renovations during their entire life cycle, referencing life cycle stages in EN 15978.

This topic implements the co-programmed European Partnership on ‘People-centric sustainable built environment’ (Built4People). As such, projects resulting from this topic will be expected to contribute to the objectives of Built4People, transfer knowledge to its network of innovation clusters[1] and report on results in support of the monitoring of the Built4People KPIs.

Technology Readiness Level - Technology readiness level expected from completed projects

Activities are expected to achieve TRL 6-8 by the end of the project – see General Annex B. Activities may start at any TRL.

[1] https://built4people.eu/b4pic_network/

News flashes

call topic details
Call status: Forthcoming
Opening date: 2027-05-05 (6 months from now)
Closing date: 2027-09-15 (11 months from now)
Procedure: single-stage

Budget: 27,000,000
Expected grants: 4
Contribution: 6,750,000 - 6,750,000
News flashes

This call topic has been appended 0 times by the EC with news.

Call

HORIZON-CL5-2027-05

Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.

There are 5 other topics in this call:

Source information

Showing the latest information. Found 3 versions of this call topic in the F&T portal.

Information from

  • 2026-10-03_06-34-16
  • 2026-03-03_06-30-22
  • 2025-12-19_06-30-20

Check the differences between the versions.

Annotations

You must be logged in to add annotations
No annotations yet

Events

Hand-picked events relevant to this call topic.

No events yet

There are currently no events linked to this call topic.

Timeline

Track where this call stands in its lifecycle, from work programme to grant signature, and see what's likely to happen next.

Call published · 19 Dec 2025 (9 months ago)

Next: Work programme published, 4 months from now (05 Mar 2027, estimated)

Today

Call published

19 Dec 2025

Work programme published

05 Mar 2027 · est.

Call opens

05 May 2027

Call closes

15 Sep 2027

Outcome expected

15 Feb 2028 · est.

Grant agreement signed

15 May 2028 · est.

Preparation Open for submission Evaluation Grant preparation Not yet reached
  1. Call published

    19 Dec 2025 · 9 months ago

    This topic was first published in TopicTree.

  2. Work programme published Estimated

    05 Mar 2027 · 4 months from now

    Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.

  3. Call opens

    05 May 2027 · 6 months from now

    Submissions can be made from this date.

  4. Call closes

    15 Sep 2027 · 11 months from now

    Deadline to submit a proposal.

  5. Outcome expected Estimated

    15 Feb 2028 · 1 year from now

    The maximum time to inform applicants of the evaluation outcome is five months after the call closes.

  6. Grant agreement signed Estimated

    15 May 2028 · 1 year from now

    The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Ecosystem bubbles

This call topic is part of the following thematic bubbles.

Not part of a bubble yet

This call topic has not been grouped into an ecosystem bubble.

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal