HORIZON-CL5-2027-05-D2-08

Demonstration for Long-duration Battery Energy Storage Systems (BATT4EU Partnership) -

Call text (as on F&T portal)

View on F&T portal

Expected Outcome:

Projects are expected to contribute to all of the following outcomes:

  • Demonstrated system-level long-duration energy storage (LDES) solutions, explicitly aimed at enhancing grid stability, resilience, and flexibility in Europe.
  • Substantial reduction of Europe's dependence on critical raw materials through the use of abundant, low-cost, and sustainable materials.
  • Contribute to strategic insights for a coherent EU-wide stationary storage deployment strategy, enhancing European energy autonomy and sustainability.
  • Sufficient and reproducible operational data and insights to serve as reliable input towards detailed technoeconomic analyses.

Scope:

Proposals should focus on system-level demonstrations of innovative long-duration (> 8 hours) battery storage concepts that can effectively support utility-scale energy systems or industrial consumers in achieving energy security and operational sustainability.

Projects are expected to cover all the following points:

  • Demonstration of advanced long-duration storage technologies not yet on the market such as novel redox flow batteries (standard or mediated), high-temperature systems, metal-air systems, multivalent chemistries (organic or aqueous), or other non-commercialised technologies or architectures.
  • Assessment and definition of use case(s) intended for the proposed technology (front-of-the-meter grid-scale storage, behind-the-meter large industrial energy consumer, firming of renewable generation) along with quantified impact on improved grid resilience, reduced emissions, safety, and lowered energy storage cost.
  • Assessment of hybridization potential of complementary energy storage technologies (e.g., redox flow batteries with supercapacitors) to optimize overall system performance for the intended use case(s) and extending system lifecycle.
  • Utilization of abundant, low-cost, and sustainable materials, explicitly prioritizing materials with reliable and scalable European supply chains, accompanied by realistic and detailed pathways to production routes at scale.
  • Integration of advanced digital technologies, for accurate state-of-charge (SOC), state-of-health (SOH), and lifetime predictions, optimizing battery management systems (BMS), energy management systems (EMS), and overall component performance for extended system longevity.
  • Comprehensive techno-economic analyses, including realistic assessments of CAPEX, OPEX, based on measured technical performance metrics (e.g., self-discharge rates, calendar life, cycle life, round-trip efficiency, necessary safety investments) to clearly establish economic viability and competitiveness for the intended use-case in comparison to the commercial, incumbent technology.
  • Comprehensive safety assessment at system-level, documenting potential concerns (e.g. flammability, toxicity, explosion potential) and mitigation strategies ahead of widescale adoption of technology.

The Commission initiative for Safe and Sustainable by Design[1] (SSbD) sets a framework for assessing the safety and sustainability of chemicals and materials which should be considered as a reference for project proposals.

Whenever the expected exploitation of project results entails developing, creating, manufacturing and marketing a product or process, or in creating and providing a service, the plan for the exploitation and dissemination of results must include a strategy for such exploitation. The exploitation plans are expected to include preliminary plans for scalability, commercialisation, and deployment (feasibility study, business plan) indicating the possible funding sources to be potentially used (in particular the Innovation Fund).

Proposals could consider the involvement of the European Commission's Joint Research Centre (JRC)[2] whose contribution could consist of performing experimental or desk-top research on battery performance or safety. For further information on the JRC’s possible contribution to the projects, please, search for additional publicly available information on the JRC’s website[3] (EU Science Hub) on the NCP portal, or request specific information from the JRC (JRC-NCP-Network@ec.europa.eu)

JRC will assure that all the other applicants receive the same information on the JRC’s possible contribution to the project (e.g., via the topic-specific FAQs under the Funding and Tenders Portal).

This topic implements the co-programmed European Partnership on Batteries (Batt4EU). As such, projects resulting from this topic will be expected to report on the results to the European Partnership on Batteries (Batt4EU) in support of the monitoring of its KPIs.

Technology Readiness Level - Technology readiness level expected from completed projects

Activities are expected to achieve TRL 6-7 by the end of the project – see General Annex B. Activities may start at any TRL.

[1] https://research-and-innovation.ec.europa.eu/research-area/industrial-research-and-innovation/key-enabling-technologies/chemicals-and-advanced-materials_en

[2] https://joint-research-centre.ec.europa.eu/laboratories-z/battery-energy-storage-testing_en

[3] JRC NCP | Horizon Europe NCP Portal

News flashes

call topic details
Call status: Forthcoming
Opening date: 2027-05-05 (6 months from now)
Closing date: 2027-09-15 (11 months from now)
Procedure: single-stage

Budget: 18,800,000
Expected grants: 2
Contribution: 9,400,000 - 9,400,000
News flashes

This call topic has been appended 0 times by the EC with news.

Call

HORIZON-CL5-2027-05

Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.

There are 5 other topics in this call:

Source information

Showing the latest information. Found 3 versions of this call topic in the F&T portal.

Information from

  • 2026-10-03_06-34-16
  • 2026-03-03_06-30-23
  • 2025-12-19_06-30-21

Check the differences between the versions.

Annotations

You must be logged in to add annotations
No annotations yet

Events

Hand-picked events relevant to this call topic.

No events yet

There are currently no events linked to this call topic.

Timeline

Track where this call stands in its lifecycle, from work programme to grant signature, and see what's likely to happen next.

Call published · 19 Dec 2025 (9 months ago)

Next: Work programme published, 4 months from now (05 Mar 2027, estimated)

Today

Call published

19 Dec 2025

Work programme published

05 Mar 2027 · est.

Call opens

05 May 2027

Call closes

15 Sep 2027

Outcome expected

15 Feb 2028 · est.

Grant agreement signed

15 May 2028 · est.

Preparation Open for submission Evaluation Grant preparation Not yet reached
  1. Call published

    19 Dec 2025 · 9 months ago

    This topic was first published in TopicTree.

  2. Work programme published Estimated

    05 Mar 2027 · 4 months from now

    Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.

  3. Call opens

    05 May 2027 · 6 months from now

    Submissions can be made from this date.

  4. Call closes

    15 Sep 2027 · 11 months from now

    Deadline to submit a proposal.

  5. Outcome expected Estimated

    15 Feb 2028 · 1 year from now

    The maximum time to inform applicants of the evaluation outcome is five months after the call closes.

  6. Grant agreement signed Estimated

    15 May 2028 · 1 year from now

    The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Ecosystem bubbles

This call topic is part of the following thematic bubbles.

Not part of a bubble yet

This call topic has not been grouped into an ecosystem bubble.

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal