HORIZON-CL5-2027-05-D4-09

Demonstration of industrial excess/waste heat conversion to mechanical or electrical power -

Call text (as on F&T portal)

View on F&T portal

Expected Outcome:

Project results are expected to contribute to all of the following expected outcomes:

  • Based on the results of the project, at least one industrial sector with a significant heating demand in the EU and Associated Countries develops pathways and business models to measurably increase the industrial excess/waste heat recovery and conversion to power, thereby reducing their energy costs.
  • Measurable improvement of industrial excess/waste heat recovery and conversion to power, possibly combined with energy storage, in terms of energy efficiency, flexibility of electricity production, climate and environment protection, reliability and safety, physical and cyber security, and profitability.

Scope:

Better use of process excess/waste heat represents a significant source of energy savings for industries. The conversion of excess heat back to electricity, would improve energy efficiency, mitigate the increase of electricity consumption and cost due to industrial electrification, as well as offer flexible electricity generation to stabilise the grid, if combined with thermal and/or electrical energy storage.

Projects must address all the following items:

  • Develop and validate novel excess/waste heat recovery and conversion systems.
  • Demonstrate physically within one or more operational industrial site(s), the recovery of industrial excess/waste heat, possibly combined with energy storage, and its conversion to mechanical or electrical power.
  • Maximise the replicability and deployment of the concept/solution in the EU and Associated Countries’ plants in the same industrial sector. Already before starting the design phase, the needs of most EU and Associated Countries’ factories in the same industrial sector(s) should be surveyed and analysed in order to design a solution that can be adapted to meet most of them.
  • Identify common components, optimise and define a standardised and cost-competitive version of them.
  • Develop open technical and economical guidelines and open tools for integrating such systems into SCADA (Supervisory Control and Data Acquisition) and EMS (Energy Management System) infrastructures of existing plants, and for developing innovative business model of heat valorisation as a flexible electricity generation offered to stabilise the power grid.
  • Disseminate results notably (but not only) to the relevant communities in cluster 4 ‘Digital, Industry and Space’ private-public partnerships.

Technology Readiness Level - Technology readiness level expected from completed projects

Activities are expected to achieve TRL 7-8 by the end of the project – see General Annex B. Activities may start at any TRL.

News flashes

call topic details
Call status: Forthcoming
Opening date: 2027-05-05 (6 months from now)
Closing date: 2027-09-15 (11 months from now)
Procedure: single-stage

Budget: 13,500,000
Expected grants: 2
Contribution: 6,750,000 - 6,750,000
News flashes

This call topic has been appended 0 times by the EC with news.

Call

HORIZON-CL5-2027-05

Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.

There are 5 other topics in this call:

Source information

Showing the latest information. Found 3 versions of this call topic in the F&T portal.

Information from

  • 2026-10-03_06-34-10
  • 2026-03-03_06-30-23
  • 2025-12-19_06-30-21

Check the differences between the versions.

Annotations

You must be logged in to add annotations
No annotations yet

Events

Hand-picked events relevant to this call topic.

No events yet

There are currently no events linked to this call topic.

Timeline

Track where this call stands in its lifecycle, from work programme to grant signature, and see what's likely to happen next.

Call published · 19 Dec 2025 (9 months ago)

Next: Work programme published, 4 months from now (05 Mar 2027, estimated)

Today

Call published

19 Dec 2025

Work programme published

05 Mar 2027 · est.

Call opens

05 May 2027

Call closes

15 Sep 2027

Outcome expected

15 Feb 2028 · est.

Grant agreement signed

15 May 2028 · est.

Preparation Open for submission Evaluation Grant preparation Not yet reached
  1. Call published

    19 Dec 2025 · 9 months ago

    This topic was first published in TopicTree.

  2. Work programme published Estimated

    05 Mar 2027 · 4 months from now

    Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.

  3. Call opens

    05 May 2027 · 6 months from now

    Submissions can be made from this date.

  4. Call closes

    15 Sep 2027 · 11 months from now

    Deadline to submit a proposal.

  5. Outcome expected Estimated

    15 Feb 2028 · 1 year from now

    The maximum time to inform applicants of the evaluation outcome is five months after the call closes.

  6. Grant agreement signed Estimated

    15 May 2028 · 1 year from now

    The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Ecosystem bubbles

This call topic is part of the following thematic bubbles.

Not part of a bubble yet

This call topic has not been grouped into an ecosystem bubble.

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal