Call text (as on F&T portal)
View on F&T portalReliable access to cost-effective electricity is the backbone of the EU economy, and electrical energy storage is an integral element in this system. Without significant investments in stationary electrical energy storage, the current electric grid infrastructure will increasingly struggle to provide reliable, affordable electricity, thereby jeopardizing the transformational changes envisioned for a modernized grid. Investment in integrating energy storage refurbishing the grid is essential for keeping pace with the increasing demands for electricity arising from continued growth in productivity and the projected increase in distributed and/or intermittent energy sources. The technical aspects that will be posed by an improved grid include inventing new technologies requiring new advanced materials. Some materials will improve the current technology, while some will enable emerging technologies.
Scope
By the development and demonstration of solutions based on advanced functional particles, filaments, layers, coatings and new functionalities, proposals should contribute to the integration of storage devices in the electrical grid. Targeted applications could include, but are not limited to, high capacity cables with optimized strength and conductivity, and superconductors, (extra) high voltage cables and accessories up to 1000 kV, materials for medium voltage (2kV to 35kV) and smart electrical accessories, new materials for extreme conditions and surface treatment of existing materials to protect and improve performances within the context of the electricity grid.
Activities addressing the development of materials specifically for energy storage technologies and for power electronics are outside the scope of this call. A dedicated topic on materials research for power electronics is included in this Work Programme under topic NMBP 02-2016 "Advanced Materials for Power Electronics based on wide bandgap semiconductor devices technology". The proposed solutions should be assessed on their technical and economical viability.
This topic calls for proposals with focus on advanced materials solutions for electricity grid related technologies. A partially complementary topic is published in the “Secure, clean and efficient energy” part of this Work Programme (LCE 1-2016: Next generation innovative technologies enabling smart grids, storage and energy system integration with increasing share of renewables: distribution network), calling for proposals on solutions starting from the technology part of the value chain.
The implementation of this topic is intended to start at TRL 5 and target TRL 6.
The Commission considers that proposals requesting a contribution from the EU between EUR 6 and 8 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.
Expected Impact:The performance levels of the proposed materials solution(s) should be in line with those specified in relevant parts of the SET-Plan Integrated Roadmap and its Annexes, available at https://setis.ec.europa.eu/set-plan-process/integrated-roadmap-and-action-plan
- Significant enhancement of power supply reliability, managing volatility of the grid considering the connection of renewable energy sources, increased grid efficiency;
- Alleviation of geographical constraints for low carbon energy production with increased efficiencies at a reduced cost;
- Reduction of the barriers to increase the penetration rate of distributed and/or intermittent renewable energy sources.
Proposals should include a business case and exploitation strategy, as outlined in the Introduction to the LEIT part of this Work Programme.
Cross-cutting Priorities:News flashes
FLASH INFORMATION ON THE CALL RESULTS2017 two-stage TOPICS
Published: 14 October 2015Deadline: 4 May 2017Available budget: 235.47 M€
The Commission has now completed the evaluation of the proposals submitted to the above-mentioned call.The results of the evaluation are as follows:
Number of proposals submitted (including proposals transferred from or to other calls): 107Number of inadmissible proposals: 0Number of ineligible proposals: 0Number of above-threshold proposals: 55Total budget requested for above-threshold proposals:343.422.171 €
We recently informed the applicants about the evaluation results for their proposals.
For questions, please contact the Research Enquiry Service.
DEADLINE (second stage) of 2017 two-stage topics: 04.05.17107 proposals were submitted in response to this call.The number of proposals for each topics is shown below:
NMBP-04-2017: 7NMBP-05-2017: 10NMBP-06-2017: 14NMBP-07-2017: 6NMBP-12-2017: 6NMBP-14-2017: 2NMBP-15-2017: 10NMBP-19-2017: 7NMBP-20-2017: 6NMBP-22-2017: 8NMBP-25-2017: 3NMBP-28-2017: 2NMBP-29-2017: 2NMBP-35-2017: 4BIOTEC-05-2017: 10BIOTEC-06-2017: 7BIOTEC-07-2017: 3
FLASH INFORMATION ON THE CALL RESULTS H2020-NMBP-2016-2017 (2017single-stage TOPICS)
Published: 14 October 2015Deadline: 19 January 2017Available budget: CSA : 8.4 M€ + NMBP-13-2017 (X-KET): 15 M€
The Commission has now completed the evaluation of the proposals submitted to the above-mentioned call.The results of the evaluation are as follows:
CSA topicsNumber of proposals submitted (including proposals transferred from or to other calls): 16Number of inadmissible proposals: 1Number of ineligible proposals: 0Number of above-threshold proposals: 10Total budget requested for above-threshold proposals: 14,398,535.25 €
NMBP-13-2017 topicNumber of proposals submitted (including proposals transferred from or to other calls): 62Number of inadmissible proposals: 0Number of ineligible proposals: 0Number of above-threshold proposals: 7Total budget requested for above-threshold proposals: 28,946,700.00 €
We recently informed the applicants about the evaluation results for their proposals.For questions, please contact the Research Enquiry Service.
Corrigendum - FLASH INFORMATION ON THE CALL RESULTS
H2020-NMBP-2016-2017 (2017 two-stage TOPICS)Please read "Deadline: 27 October 2016"
FLASH INFORMATION ON THE CALL RESULTS H2020-NMBP-2016-2017 (2017 two-stage TOPICS)
Published: 14 October 2015Deadline: 27 October 2017Available budget: 235,470,000 €
The Commission has now completed the evaluation of the proposals submitted to the above-mentioned call. The following overall thresholds were applied:NMBP-04-2017 8,5/10NMBP-05-2017 8,5/10NMBP-06-2017 8,5/10NMBP-07-2017 8,5/10NMBP-22-2017 8,5/10NMBP-25-2017 8,5/10NMBP-28-2017 8,5/10NMBP-29-2017 8,5/10NMBP-35-2017 8,5/10NMBP-12-2017 8/10NMBP-14-2017 8/10NMBP-15-2017 8/10NMBP-19-2017 8/10NMBP-20-2017 8/10BIOTEC-05-2017 8/10BIOTEC-06-2017 8/10BIOTEC-07-2017 8/10
The results of the evaluation are as follows: Number of proposals submitted (including proposals transferred from or to other calls): 421Number of inadmissible proposals: -Number of ineligible proposals: 2Number of above-threshold proposals: 108Total budget requested for above-threshold proposals: 653,198,271 €We recently informed the applicants about the evaluation results for their proposals. Above-threshold proposals have been invited to submit a full proposal by 4 May 2017.Information on the selected projects will be published on CORDIS after that date. For questions, please contact the Research Enquiry Service.
Deadline of 2017 single-stage topics: 19.01.2017
A total of 78 proposals were submitted in response to this call. The number of proposals for each topic is shown below:
BIOTEC-08-2017: 2NMBP-13-2017: 62NMBP-16-2017: 2NMBP-31-2017: 2NMBP-34-2017: 7NMBP-37-2017: 1NMBP-38-2017: 2
Erratum: Deadline (first stage) of 2017 two-stage topics: 27.10.16
Deadline (first stage) of 2017 two-stage topics: 21.10.16421 proposals were submitted in response to this call.The number of proposals for each topics is shown below:
NMBP-04-2017: 51NMBP-05-2017: 53NMBP-06-2017: 81NMBP-07-2017: 21NMBP-12-2017: 10NMBP-14-2017: 3NMBP-15-2017: 27NMBP-19-2017: 25NMBP-20-2017: 15NMBP-22-2017: 35NMBP-25-2017: 6NMBP-28-2017: 8NMBP-29-2017: 14NMBP-35-2017: 27BIOTEC-05-2017: 16BIOTEC-06-2017: 18BIOTEC-07-2017: 7
Horizon 2020 Work Programme 2017 update
After the update to the Horizon 2020 Work Programme 2017 of 25 July 2016,the following updates were made:
- Open Access Data new provisions have been added for 2017 calls with an opening date on or after 26/07/2016.
- The introduction of the following parts have been modified: o BIOTEC topics under call H2020-NMBP-2016-17. o MODELLING topics under call H2020-NMBP-2016-17
- The text for evaluation criteria, scoring, threshold and procedure has been clarified.
- The text for topics NMBP-22-2017, BIOTEC-05-2017, BIOTEC-06-2017 and BIOTEC-07-2017 has been modified.
- The following two new CSA topics have been added to the call H2020-NMBP-2017: o NMBP-37-2017 Mapping a path to future supply chains o NMBP-38-2017 Support for the enhancement of the impact of PILOT projects.
- Other Action 5. Exploitation Strategy and Innovation Consultants (ESIC) has been cancelled. Other Action 6. Exploitation Strategy and Innovation Consultants (ESIC) has been changed to other action 5. Exploitation Support Services and the text has been revised.
- The following new actions have been added: o 8. Study on due diligence and risk assessment of KETs projects by investors o 9. Best practise for identifying and assessing the dual-use issues in enabling technologies research – preliminary study o 10. Addressing dual-use issues in enabling technologies research
- The indicative budget for call H2020-NMBP-2017 was increased to €253.87 million in 2017.
Flash Call Info
Call identifier: H2020-NMBP-2016-2017 (2016 Two-stage topics)Call title: Call for Nanotechnologies, Advanced materials, Biotechnology and ProductionPublished: 14 October 2015Deadline: 24 May 2016 17:00:00
Budget available: 174.08 M€
- BIOTEC-02-2016 03-2016: 32 M€
- NMBP-01-2016 + 020-2016 + 03-2016 + 23-2016 + 26-2016: 78.08 M€
- NMBP-09-2016 + 10-2016: 32 M€
- NMBP-17-2016 + 18-2016: 32M€
The Commission has completed the evaluation of the proposals submitted to the above call. The results of the evaluation are as follows:
TOPICS BIOTEC-02-2016 + 03-20016Number of proposals submitted (including proposals transferred from or to other calls): 17Number of inadmissible proposals: 0Number of ineligible proposals: 0Number of above-threshold proposals: 8Total budget requested for above-threshold proposals: 48,417,925 €
NMBP-01-2016 + 020-2016 + 03-2016 + 23-2016 + 26-2016Number of proposals submitted (including proposals transferred from or to other calls): 36Number of inadmissible proposals: 0Number of ineligible proposals: 0Number of above-threshold proposals: 20Total budget requested for above-threshold proposals: 116,470,292 €
NMBP-09-2016 + 10-2016Number of proposals submitted (including proposals transferred from or to other calls):16Number of inadmissible proposals: 0Number of ineligible proposals: 0Number of above-threshold proposals: 6Total budget requested for above-threshold proposals: 34,039,531 €
NMBP-17-2016 + 18-2016Number of proposals submitted (including proposals transferred from or to other calls): 15Number of inadmissible proposals: 0Number of ineligible proposals: 0Number of above-threshold proposals: 6Total budget requested for above-threshold proposals: 32,301,327 €
We recently informed the applicants about the evaluation results for their proposals.
The number of proposals that can finally be funded depends on the available budget and the formal approval of grant agreements by the Commission.
It is expected that the first grant agreements will be signed by November 2016.
Information on the selected projects will be published on CORDIS after that date.http://cordis.europa.eu/projects/home_en.html
In case of questions, please contact the Research Enquiry Servicehttp://ec.europa.eu/research/enquiries
An overview of the following evaluation results (flash call info) is now available under the tab Topic conditions and documents:
- 2016 NMBP single stage topics
- 2016 NMBP two-stage topics (first stage results)
Deadline of 2016 single stage topics: 21.01.1638 proposals were submitted in response to this call.The number of proposals for each topics is shown below:
Type of Action: CSA
BIOTEC-04: 3NMBP-24: 1NMBP-27: 2 NMBP-30: 1NMBP-31: 2NMBP-32: 1NMBP-33: 4NMBP-36: 1
Type of Action ERANET-co-FUND
BIOTEC-01: 2NMBP-11: 1NMBP-21: 1
Type of Action RIA (Green Vehicles topic)
NMBP-08: 19
Deadline (first stage) of 2016 two-stage topics: 08.12.15305 proposals were submitted in response to this call.The number of proposals for each topics is shown below:
NMBP-01-2016: 25NMBP-02-2016: 17NMBP-03-2016: 37NMBP-09-2016: 17NMBP-10-2016: 61NMBP-17-2016: 42NMBP-18-2016: 4NMBP-23-2016: 9NMBP-26-2016: 17BIOTEC-02-2016: 47BIOTEC-03-2016: 29
Opening date: 2015-10-15 (10 years ago)
Closing date: 2015-12-08 (10 years ago)
Procedure: two-stage
Budget: 32,000,000
Expected grants: not specified
This call topic has been appended 17 times by the EC with news.
-
2017-07-06
flash information on the call results201... -
2017-05-17
deadline (second stage) of 2017 two-stag... -
2017-04-27
flash information on the call results h2... -
2017-02-07
corrigendum - flash information on the c... -
2017-01-30
flash information on the call results h2... -
2017-01-24
deadline of 2017 single-stage topics: 19... -
2016-11-08
erratum: deadline (first stage) of 2017... -
2016-11-08
deadline (first stage) of 2017 two-stage... -
2016-09-20
the submission session is now available... -
2016-09-20
the submission session is now available... -
2016-08-03
the submission session is now available... -
2016-08-03
the submission session is now available... -
2016-07-25
horizon 2020 work programme 2017 updatea... -
2016-07-12
flash call infocall identifier: h2020-nm... -
2016-04-19
an overview of the following evaluation... -
2016-01-25
deadline of 2016 single stage topics: 21... -
2015-12-14
deadline (first stage) of 2016 two-stage...
H2020-NMBP-2016-2017
Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.
There are 46 other topics in this call:
- BIOTEC-01-2016
- BIOTEC-02-2016
- BIOTEC-03-2016
- BIOTEC-04-2016
- BIOTEC-05-2017
- BIOTEC-06-2017
- BIOTEC-07-2017
- BIOTEC-08-2017
- NMBP-01-2016
- NMBP-02-2016
- NMBP-03-2016
- NMBP-04-2017
- NMBP-05-2017
- NMBP-06-2017
- NMBP-07-2017
- NMBP-08-2016
- NMBP-09-2016
- NMBP-10-2016
- NMBP-11-2016
- NMBP-12-2017
- NMBP-13-2017
- NMBP-14-2017
- NMBP-15-2017
- NMBP-16-2017
- NMBP-17-2016
- NMBP-19-2017
- NMBP-20-2017
- NMBP-21-2016
- NMBP-22-2017
- NMBP-23-2016
- NMBP-24-2016
- NMBP-25-2017
- NMBP-26-2016
- NMBP-27-2016
- NMBP-28-2017
- NMBP-29-2017
- NMBP-30-2016
- NMBP-31-2016
- NMBP-31-2017
- NMBP-32-2016
- NMBP-33-2016
- NMBP-34-2017
- NMBP-35-2017
- NMBP-36-2016
- NMBP-37-2017
- NMBP-38-2017
Showing the latest information. Found 1 version of this call topic in the F&T portal.
Information from
- 2024-03-30_14-22-23
Annotations
Events
Events are added by the ideal-ist NCP community and are hand-picked. If you would like to suggest an event, please contact idealist@ffg.at.
Call topic timeline
-
Work programme available
- 10 years agoThe call topics are published first in the Work Programme, which is available a while before the call opens. By following up the Work Programme publications, you can get a headstart.
-
Opening date
- 10 years agoThe call opened for submissions.
-
Closing date
- 10 years agoDeadline for submitting a project.
-
Time to inform applicants Estimate
- 9 years agoThe maximum time to inform applicants (TTI) of the outcome of the evaluation is five months from the call closure date.
-
Sign grant agreement Estimate
- 9 years agoThe maximum time to sign grant agreements (TTG) is three months from the date of informing applicants.
-
Publication date
- 1 year agoThe call was first imported in TopicTree.
-
Today
Funded Projects
Loading...
Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)