HORIZON-CL5-2024-D3-01-13

DC and AC/DC hybrid transmission and distribution systems -

Call text (as on F&T portal)

View on F&T portal

Expected Outcome:

Project results are expected to contribute to all the following outcomes:

  • Demonstrated top-down electricity system orchestration of future pan-European AC / DC hybrid system architecture - including offshore grid and energy islands - at different voltage levels (HVDC, MVDC, LVDC) down to DC microgrids.
  • Developed methodologies for operational planning and design of DC and AC / DC hybrid systems, considering all possible sources, loads and storage, from high-voltage transmission level to distribution-connected assets. This includes a cost benefit analysis for stability management options.
  • Developed methodologies and requirements for interoperability among Multi Terminal, Multi-Vendor MVDC and LVDC systems.
  • Demonstrated technologies to be applied to the energy system to address the gradual loss of inertia caused by the increasing penetration of Power Electronics Interfaced Generators (i.e., RES such as PV, Wind, etc.).
  • Demonstrated DC transmission and distribution systems and technologies.
  • Components and systems for smart substations.
  • Close collaboration among the key grid stakeholders (non-exhaustive list: software developers, system manufacturers, TSOs, third-party system integrators, wind turbine manufacturers, offshore wind farm developers, PV plants, storage systems, etc.).

Scope:

Projects are expected to implement the activities in (1) and the practical demonstration in (2) as described below:

  • R&I, methodologies and tools involving the activities in the three subtopics (A, B and C) listed below. These can be developed/complemented with others pertinent to each sub-topic.
  • A) DC – AC / DC hybrid system Design & Planning

    a. Demonstration of software tools for transnational AC/DC hybrid power system planning and management to enable HVAC/HVDC/MVDC/LVDC hybrid systems, such as:

    • integration of multi-terminal HVDC systems, both offshore and onshore and HVDC links embedded within the HVAC network as well as HVDC ties (inter-) connecting different control zones and synchronous areas (in full or in back-to-back schemes);
    • representation and modelling of transmission and distribution grids as well as multi-energy vector integration (sector coupling) for long-term and for transient and dynamic analysis.

    b. Demonstration of reliability and resilience methodologies to address security and adequacy issues and criteria via not only deterministic but also probabilistic (e.g., Monte-Carlo) methods.

    c. Demonstration of developed methodologies and requirements for interoperability among Multi Terminal, Multi-Vendor MVDC and LVDC systems.

    B) AC and DC Grid Forming Capability

    • Functional requirements and demonstration of grid forming capability for hybrid HV AC/DC networks (e.g., offshore wind, HVDC transmission or multi-terminal HVDC grid, potentially associated with energy storage systems).
    • Functional requirements and demonstration of grid forming capability for hybrid MV and LV AC/DC networks (grid connected and islanded operation with distributed energy sources).
    • Functional requirements and validation procedure for testing grid-forming capabilities offered by HVDC, MVDC and LVDC systems.

    C) DC Distribution & microgrids

    • Modelling (steady state and transient models) for systems including different typology of RES, EVs, storage and loads (system architecture, voltage level, control, stability, protection, and storage integration).
    • Planning and design of MVDC distribution grids as the intermediate layer between the HVDC and the AC or DC Low Voltage local distribution grid and loads.
    • Functional requirements for the AC-DC converters, DC-DC converters, switchgear (including protection equipment) and cables based on the different typologies and power rating applications

    2. Demonstration, test and validation of the activities developed in (1) in at least three pilots – one for each sub-topic (A, B and C) – in different EU Member States/Associated Countries.

    International cooperation with countries of the Mediterranean Region is encouraged.

    null

    Activities are expected to achieve TRL 4-5 by the end of the project – see General Annex B.

    News flashes

    2024-05-15

    Call update: EVALUATION results

    Published: 12/09/2023

    Deadline: 16/01/2024

     

    Available budget: EUR 246.000.000

    The results of the evaluation for each topic are as follows:

     

     

    D3-01-01

    D3-01-02

    D3-01-03

    D3-01-04

    D3-01-05

    D3-01-06

    D3-01-07

    D3-01-08

    D3-01-09

    D3-01-10

    D3-01-11

    D3-01-12

    D3-01-13

    D3-01-14

    D3-01-15

    D3-01-16

    D3-01-17

    Number of proposals submitted (including proposals transferred from or to other calls)

    12

    14

    13

    13

    13

    12

    14

    13

    2

    101

    8

    19

    5

    7

    10

    6

    2

    Number of inadmissible proposals

     

     

     

     

     

     

     

     

     

    1

     

     

     

     

     

     

     

    Number of ineligible proposals

    1

     

    2

     

     

     

     

    1

    1

    6

     

     

     

     

     

     

     

    Number of above-threshold proposals

    7

    10

    4

    6

    2

    6

    8

    4

    1

    26

    5

    15

    3

    5

    6

    3

    2

    Total budget requested for above-threshold proposals (EUR/millions)

    81.9

    29.4

    35.5

    23.6

    7.6

    18.0

    31.5

    74.7

    10.0

    77.7

    26.6

    75.3

    17.9

    20.2

    32.4

    24.5

    11.9

    Number of proposals retained for funding

    2

    2

    2

    2

    2

    3

    2

    2

    1

    9

    3

    2

    2

    3

    3

    1

    2

    Number of proposals in the reserve list

    2

    2

    2

    2

    0

    2

    2

    2

    0

    10

    2

    2

    1

    2

    2

    2

    0

    Funding threshold

    13.5

    14.0

    13.5

    14.0

    11.0

    13.5

    13.0

    13.0

    10.5

    13.5

    11.5

    13.5

    14.0

    11.0

    13.5

    13.5

    11.0

    Ranking distribution for proposals above the evaluation thresholds

     

     

     

     

     

     

     

     

     

     

     

     

    Number of proposals with scores lower or equal to 15 and higher or equal to 14

    1

    2

    1

    3

     

    0

    2

    1

    0

    0

     

    5

     

    1

    1

    2

    0

    1

    0

    0

    Number of proposals with scores lower than 14 and higher or equal to 13

    2

    1

    3

    3

    1

    2

    1

    3

    0

    10

    1

    4

    0

    1

    3

    1

    0

    Number of proposals with scores lower than 13 and higher or equal to 10

    4

    7

    0

    0

    1

    2

    6

    1

    1

    11

    3

    10

    1

    4

    2

    2

    2

     

    Summary of observer report:

    "As independent Observer I was able to acquire deep insight into the call and evaluation documentation and accompanying instructions. I took part in a significant fraction of all briefings and panel meetings, had full access to the online evaluation SEP system and could both monitor the evaluation progress as well as having insight in individual evaluation and consensus reports.

    I observed a professionally orchestrated, fair, impartial, expertise-driven, and transparent evaluation exercise. The consensus reports, the ultimate outcome, meet high standards and adhere to the guidelines outlined in the guiding documents and applicable rules.

    All consensus panels were managed as equitably as possible, with effective quality control measures, inter-panel collaboration, and comprehensive final cross-checks ensuring a consistent evaluation outcome. The core principles of impartiality, fairness, and confidentiality were followed throughout the full evaluation process."

    We recently informed the applicants about the evaluation results for their proposals.

    For questions, please contact the Research Enquiry Service.

     

    2024-05-15

    Call update: EVALUATION results

    Published: 12/09/2023

    Deadline: 16/01/2024

     

    Available budget: EUR 246.000.000

    The results of the evaluation for each topic are as follows:

     

     

    D3-01-01

    D3-01-02

    D3-01-03

    D3-01-04

    D3-01-05

    D3-01-06

    D3-01-07

    D3-01-08

    D3-01-09

    D3-01-10

    D3-01-11

    D3-01-12

    D3-01-13

    D3-01-14

    D3-01-15

    D3-01-16

    D3-01-17

    Number of proposals submitted (including proposals transferred from or to other calls)

    12

    14

    13

    13

    13

    12

    14

    13

    2

    101

    8

    19

    5

    7

    10

    6

    2

    Number of inadmissible proposals

     

     

     

     

     

     

     

     

     

    1

     

     

     

     

     

     

     

    Number of ineligible proposals

    1

     

    2

     

     

     

     

    1

    1

    6

     

     

     

     

     

     

     

    Number of above-threshold proposals

    7

    10

    4

    6

    2

    6

    8

    4

    1

    26

    5

    15

    3

    5

    6

    3

    2

    Total budget requested for above-threshold proposals (EUR/millions)

    81.9

    29.4

    35.5

    23.6

    7.6

    18.0

    31.5

    74.7

    10.0

    77.7

    26.6

    75.3

    17.9

    20.2

    32.4

    24.5

    11.9

    Number of proposals retained for funding

    2

    2

    2

    2

    2

    3

    2

    2

    1

    9

    3

    2

    2

    3

    3

    1

    2

    Number of proposals in the reserve list

    2

    2

    2

    2

    0

    2

    2

    2

    0

    10

    2

    2

    1

    2

    2

    2

    0

    Funding threshold

    13.5

    14.0

    13.5

    14.0

    11.0

    13.5

    13.0

    13.0

    10.5

    13.5

    11.5

    13.5

    14.0

    11.0

    13.5

    13.5

    11.0

    Ranking distribution for proposals above the evaluation thresholds

     

     

     

     

     

     

     

     

     

     

     

     

    Number of proposals with scores lower or equal to 15 and higher or equal to 14

    1

    2

    1

    3

     

    0

    2

    1

    0

    0

     

    5

     

    1

    1

    2

    0

    1

    0

    0

    Number of proposals with scores lower than 14 and higher or equal to 13

    2

    1

    3

    3

    1

    2

    1

    3

    0

    10

    1

    4

    0

    1

    3

    1

    0

    Number of proposals with scores lower than 13 and higher or equal to 10

    4

    7

    0

    0

    1

    2

    6

    1

    1

    11

    3

    10

    1

    4

    2

    2

    2

     

    Summary of observer report:

    "As independent Observer I was able to acquire deep insight into the call and evaluation documentation and accompanying instructions. I took part in a significant fraction of all briefings and panel meetings, had full access to the online evaluation SEP system and could both monitor the evaluation progress as well as having insight in individual evaluation and consensus reports.

    I observed a professionally orchestrated, fair, impartial, expertise-driven, and transparent evaluation exercise. The consensus reports, the ultimate outcome, meet high standards and adhere to the guidelines outlined in the guiding documents and applicable rules.

    All consensus panels were managed as equitably as possible, with effective quality control measures, inter-panel collaboration, and comprehensive final cross-checks ensuring a consistent evaluation outcome. The core principles of impartiality, fairness, and confidentiality were followed throughout the full evaluation process."

    We recently informed the applicants about the evaluation results for their proposals.

    For questions, please contact the Research Enquiry Service.

     

    2024-01-17
    The call for proposals HORIZON-CL5-2024-D3-01 closed on 16/01/2024. 264 proposals were submitted to the call. The breakdown per topic is: HORIZON-CL5-2024-D3-01-01          (IA) : 12 proposalsHORIZON-CL5-2024-D3-01-02          (IA-LS) : 14 proposalsHORIZON-CL5-2024-D3-01-03          (IA-LS) : 13 proposalsHORIZON-CL5-2024-D3-01-04          (RIA) : 13 proposalsHORIZON-CL5-2024-D3-01-05          (RIA) : 13 proposalsHORIZON-CL5-2024-D3-01-06          (RIA) : 12 proposalsHORIZON-CL5-2024-D3-01-07          (RIA) : 14 proposalsHORIZON-CL5-2024-D3-01-08          (IA) : 13 proposalsHORIZON-CL5-2024-D3-01-09          (Co-fund) : 2 proposalsHORIZON-CL5-2024-D3-01-10          (RIA) : 101 proposalsHORIZON-CL5-2024-D3-01-11          (IA) : 8 proposalsHORIZON-CL5-2024-D3-01-12          (IA) : 19 proposalsHORIZON-CL5-2024-D3-01-13          (RIA) : 5 proposalsHORIZON-CL5-2024-D3-01-14          (RIA) : 7 proposalsHORIZON-CL5-2024-D3-01-15          (RIA-LS) : 10 proposalsHORIZON-CL5-2024-D3-01-16          (IA) : 6 proposalsHORIZON-CL5-2024-D3-01-17          (IA) : 2 proposals 
    2024-01-17
    The call for proposals HORIZON-CL5-2024-D3-01 closed on 16/01/2024. 264 proposals were submitted to the call. The breakdown per topic is: HORIZON-CL5-2024-D3-01-01          (IA) : 12 proposalsHORIZON-CL5-2024-D3-01-02          (IA-LS) : 14 proposalsHORIZON-CL5-2024-D3-01-03          (IA-LS) : 13 proposalsHORIZON-CL5-2024-D3-01-04          (RIA) : 13 proposalsHORIZON-CL5-2024-D3-01-05          (RIA) : 13 proposalsHORIZON-CL5-2024-D3-01-06          (RIA) : 12 proposalsHORIZON-CL5-2024-D3-01-07          (RIA) : 14 proposalsHORIZON-CL5-2024-D3-01-08          (IA) : 13 proposalsHORIZON-CL5-2024-D3-01-09          (Co-fund) : 2 proposalsHORIZON-CL5-2024-D3-01-10          (RIA) : 101 proposalsHORIZON-CL5-2024-D3-01-11          (IA) : 8 proposalsHORIZON-CL5-2024-D3-01-12          (IA) : 19 proposalsHORIZON-CL5-2024-D3-01-13          (RIA) : 5 proposalsHORIZON-CL5-2024-D3-01-14          (RIA) : 7 proposalsHORIZON-CL5-2024-D3-01-15          (RIA-LS) : 10 proposalsHORIZON-CL5-2024-D3-01-16          (IA) : 6 proposalsHORIZON-CL5-2024-D3-01-17          (IA) : 2 proposals 
    2023-09-12
    The submission session is now available for: HORIZON-CL5-2024-D3-01-07(HORIZON-RIA), HORIZON-CL5-2024-D3-01-10(HORIZON-RIA), HORIZON-CL5-2024-D3-01-03(HORIZON-IA), HORIZON-CL5-2024-D3-01-13(HORIZON-RIA), HORIZON-CL5-2024-D3-01-16(HORIZON-IA), HORIZON-CL5-2024-D3-01-04(HORIZON-RIA), HORIZON-CL5-2024-D3-01-01(HORIZON-IA), HORIZON-CL5-2024-D3-01-09(HORIZON-COFUND), HORIZON-CL5-2024-D3-01-14(HORIZON-RIA), HORIZON-CL5-2024-D3-01-08(HORIZON-IA), HORIZON-CL5-2024-D3-01-17(HORIZON-IA), HORIZON-CL5-2024-D3-01-15(HORIZON-RIA), HORIZON-CL5-2024-D3-01-06(HORIZON-RIA), HORIZON-CL5-2024-D3-01-11(HORIZON-IA), HORIZON-CL5-2024-D3-01-12(HORIZON-IA), HORIZON-CL5-2024-D3-01-02(HORIZON-IA), HORIZON-CL5-2024-D3-01-05(HORIZON-RIA)
    2023-09-12
    The submission session is now available for: HORIZON-CL5-2024-D3-01-07(HORIZON-RIA), HORIZON-CL5-2024-D3-01-10(HORIZON-RIA), HORIZON-CL5-2024-D3-01-03(HORIZON-IA), HORIZON-CL5-2024-D3-01-13(HORIZON-RIA), HORIZON-CL5-2024-D3-01-16(HORIZON-IA), HORIZON-CL5-2024-D3-01-04(HORIZON-RIA), HORIZON-CL5-2024-D3-01-01(HORIZON-IA), HORIZON-CL5-2024-D3-01-09(HORIZON-COFUND), HORIZON-CL5-2024-D3-01-14(HORIZON-RIA), HORIZON-CL5-2024-D3-01-08(HORIZON-IA), HORIZON-CL5-2024-D3-01-17(HORIZON-IA), HORIZON-CL5-2024-D3-01-15(HORIZON-RIA), HORIZON-CL5-2024-D3-01-06(HORIZON-RIA), HORIZON-CL5-2024-D3-01-11(HORIZON-IA), HORIZON-CL5-2024-D3-01-12(HORIZON-IA), HORIZON-CL5-2024-D3-01-02(HORIZON-IA), HORIZON-CL5-2024-D3-01-05(HORIZON-RIA)
    call topic details
    Call status: Closed
    Opening date: 2023-09-12 (3 years ago)
    Closing date: 2024-01-16 (2 years ago)
    Procedure: single-stage

    Budget: 13,000,000
    Expected grants: 2
    Contribution: 6,000,000 - 6,000,000
    News flashes

    This call topic has been appended 6 times by the EC with news.

    • 2024-05-15
      call update: evaluation resultspublished...
    • 2024-05-15
      call update: evaluation resultspublished...
    • 2024-01-17
      the call for proposals horizon-cl5-2024-...
    • 2024-01-17
      the call for proposals horizon-cl5-2024-...
    • 2023-09-12
      the submission session is now available...
    • 2023-09-12
      the submission session is now available...
    Source information

    Showing the latest information. Found 196 versions of this call topic in the F&T portal.

    Information from

    • 2026-10-08_08-05-13
    • 2026-10-08_08-04-16
    • 2026-10-07_08-00-19
    • 2026-10-07_07-59-48
    • 2026-10-06_08-03-16
    • 2026-10-06_08-02-28
    • 2026-10-05_07-59-42
    • 2026-10-05_07-59-06
    • 2026-10-04_08-00-48
    • 2026-10-04_08-00-03
    • 2026-10-03_07-59-11
    • 2026-10-03_07-58-30
    • 2026-10-02_08-01-34
    • 2026-10-02_08-00-11
    • 2026-10-01_08-03-22
    • 2026-10-01_08-01-45
    • 2026-09-29_08-30-39
    • 2026-09-29_08-28-12
    • 2026-09-28_08-30-18
    • 2026-09-28_08-27-48
    • 2026-09-27_08-28-37
    • 2026-09-27_08-26-05
    • 2026-09-26_08-26-04
    • 2026-09-26_08-23-35
    • 2026-09-25_08-27-39
    • 2026-09-25_08-25-14
    • 2026-09-24_08-27-55
    • 2026-09-24_08-25-48
    • 2026-09-23_08-25-47
    • 2026-09-23_08-23-13
    • 2026-09-22_08-25-31
    • 2026-09-22_08-23-10
    • 2026-09-21_08-21-22
    • 2026-09-21_08-18-55
    • 2026-09-20_08-22-25
    • 2026-09-20_08-20-02
    • 2026-09-19_08-21-04
    • 2026-09-19_08-19-17
    • 2026-09-18_08-25-28
    • 2026-09-18_08-23-29
    • 2026-09-17_08-19-52
    • 2026-09-17_08-17-26
    • 2026-09-16_08-17-02
    • 2026-09-16_08-14-56
    • 2026-09-15_08-18-43
    • 2026-09-15_08-17-03
    • 2026-09-14_08-18-37
    • 2026-09-14_08-16-11
    • 2026-09-13_08-18-40
    • 2026-09-13_08-16-34
    • 2026-09-12_08-21-49
    • 2026-09-12_08-19-20
    • 2026-09-11_08-20-31
    • 2026-09-11_08-18-50
    • 2026-09-10_08-19-31
    • 2026-09-10_08-17-10
    • 2026-09-09_08-19-52
    • 2026-09-09_08-17-25
    • 2026-09-08_08-18-40
    • 2026-09-08_08-17-02
    • 2026-09-07_08-15-44
    • 2026-09-07_08-14-11
    • 2026-09-06_08-16-54
    • 2026-09-06_08-14-50
    • 2026-09-05_08-16-30
    • 2026-09-05_08-14-18
    • 2026-09-04_08-14-17
    • 2026-09-04_08-12-30
    • 2026-09-03_08-14-27
    • 2026-09-03_08-12-25
    • 2026-09-02_08-15-48
    • 2026-09-02_08-14-04
    • 2026-09-01_08-14-24
    • 2026-09-01_08-12-46
    • 2026-08-31_08-17-17
    • 2026-08-31_08-15-15
    • 2026-08-30_08-10-18
    • 2026-08-30_08-08-25
    • 2026-08-29_08-11-57
    • 2026-08-29_08-09-49
    • 2026-08-28_08-14-31
    • 2026-08-28_08-12-48
    • 2026-08-27_08-06-02
    • 2026-08-27_08-04-10
    • 2026-08-25_08-11-50
    • 2026-08-25_08-10-09
    • 2026-08-24_08-06-18
    • 2026-08-24_08-04-38
    • 2026-08-23_08-05-27
    • 2026-08-23_08-04-12
    • 2026-08-22_08-06-16
    • 2026-08-22_08-04-30
    • 2026-08-21_08-01-15
    • 2026-08-21_08-00-11
    • 2026-08-20_08-05-00
    • 2026-08-20_08-03-26
    • 2026-08-19_08-04-05
    • 2026-08-19_08-02-46
    • 2026-08-18_08-00-42
    • 2026-08-18_07-59-32
    • 2026-08-17_08-00-19
    • 2026-08-17_07-59-02
    • 2026-08-16_07-56-52
    • 2026-08-16_07-55-40
    • 2026-08-15_07-58-22
    • 2026-08-15_07-57-11
    • 2026-08-14_07-58-07
    • 2026-08-14_07-56-53
    • 2026-08-13_07-57-58
    • 2026-08-13_07-56-54
    • 2026-08-12_07-56-29
    • 2026-08-12_07-55-33
    • 2026-08-11_07-57-30
    • 2026-08-11_07-55-50
    • 2026-08-10_07-53-46
    • 2026-08-10_07-52-42
    • 2026-08-09_07-53-27
    • 2026-08-09_07-52-11
    • 2026-08-08_07-52-58
    • 2026-08-08_07-51-48
    • 2026-08-07_07-51-16
    • 2026-08-07_07-50-08
    • 2026-08-06_07-52-17
    • 2026-08-06_07-51-10
    • 2026-08-05_07-54-02
    • 2026-08-05_07-52-38
    • 2026-08-04_07-53-39
    • 2026-08-04_07-52-30
    • 2026-08-02_07-51-55
    • 2026-08-02_07-50-49
    • 2026-08-01_07-51-44
    • 2026-08-01_07-50-42
    • 2026-07-31_07-50-14
    • 2026-07-31_07-49-10
    • 2026-07-30_07-49-39
    • 2026-07-30_07-48-29
    • 2026-07-29_07-50-47
    • 2026-07-29_07-49-43
    • 2026-07-28_07-50-29
    • 2026-07-28_07-49-22
    • 2026-07-27_07-46-18
    • 2026-07-27_07-45-27
    • 2026-07-26_07-44-40
    • 2026-07-26_07-43-43
    • 2026-07-25_07-45-08
    • 2026-07-25_07-44-00
    • 2026-07-24_07-45-24
    • 2026-07-24_07-44-30
    • 2026-07-23_07-44-30
    • 2026-07-23_07-43-26
    • 2026-07-22_07-46-11
    • 2026-07-22_07-45-18
    • 2026-07-21_07-43-25
    • 2026-07-21_07-42-25
    • 2026-07-18_07-43-43
    • 2026-07-18_07-42-49
    • 2026-07-16_07-29-21
    • 2026-07-16_07-28-42
    • 2026-07-14_07-27-51
    • 2026-07-14_07-27-10
    • 2026-07-12_07-28-48
    • 2026-07-12_07-27-59
    • 2026-07-11_07-27-56
    • 2026-07-11_07-27-10
    • 2026-07-10_07-27-31
    • 2026-07-10_07-26-50
    • 2026-07-09_07-27-28
    • 2026-07-09_07-26-38
    • 2026-07-08_07-27-24
    • 2026-07-08_07-26-36
    • 2026-07-06_07-27-11
    • 2026-07-06_07-26-34
    • 2026-07-05_07-24-39
    • 2026-07-05_07-23-47
    • 2026-07-04_07-25-55
    • 2026-07-04_07-25-14
    • 2026-07-03_07-25-30
    • 2026-07-03_07-24-52
    • 2026-07-02_07-24-41
    • 2026-07-02_07-23-59
    • 2026-07-01_07-38-15
    • 2026-07-01_07-37-38
    • 2026-06-30_09-49-01
    • 2026-06-30_07-34-49
    • 2026-06-29_11-34-51
    • 2026-06-29_07-37-32
    • 2026-06-28_09-31-45
    • 2026-06-28_07-33-59
    • 2026-06-27_09-32-17
    • 2026-06-27_07-34-34
    • 2026-06-27_07-34-06
    • 2026-02-18_06-57-14
    • 2024-11-23_03-30-32
    • 2024-09-30_21-22-35
    • 2024-07-04_15-01-35
    • 2024-03-30_14-17-45

    Check the differences between the versions.

    Annotations

    You must be logged in to add annotations
    No annotations yet

    Events

    Hand-picked events relevant to this call topic.

    No events yet

    There are currently no events linked to this call topic.

    Timeline

    Track where this call stands in its lifecycle, from work programme to grant signature, and see what's likely to happen next.

    Call published · 30 Sep 2024 (2 years ago)

    All expected milestones for this call have passed.

    Today

    Work programme published

    07 Oct 2022 · est.

    Call opens

    12 Sep 2023

    Call closes

    16 Jan 2024

    Outcome expected

    16 Jun 2024 · est.

    Grant agreement signed

    16 Sep 2024 · est.

    Call published

    30 Sep 2024

    Preparation Open for submission Evaluation Grant preparation Not yet reached
    1. Work programme published Estimated

      07 Oct 2022 · 4 years ago

      Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.

    2. Call opens

      12 Sep 2023 · 3 years ago

      Submissions can be made from this date.

    3. Call closes

      16 Jan 2024 · 2 years ago

      Deadline to submit a proposal.

    4. Outcome expected Estimated

      16 Jun 2024 · 2 years ago

      The maximum time to inform applicants of the evaluation outcome is five months after the call closes.

    5. Grant agreement signed Estimated

      16 Sep 2024 · 2 years ago

      The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.

    6. Call published

      30 Sep 2024 · 2 years ago

      This topic was first published in TopicTree.

    Funded Projects

    Loading...

    Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

    Ecosystem bubbles

    This call topic is part of the following thematic bubbles.

    Not part of a bubble yet

    This call topic has not been grouped into an ecosystem bubble.

    Call document info

    This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal