HORIZON-CL5-2024-D3-01-03
Demonstration of improved intermediate renewable energy carrier technologies for transport fuels -
Call text (as on F&T portal)
View on F&T portalExpected Outcome:
Project results are expected to contribute to all of the following expected outcomes:
- Support de-risking the technology, boost scale-up of flexible intermediate bioenergy and synthetic renewable energy carriers and contribute to their market up-take.
- Respond to short- and medium-term needs for renewable fuels in transport.
- Increase flexibility, reliability and security of renewable energy supply in the transport sector.
- Increase available options for better integration of the energy system linking renewable energy production, storage and use via renewable energy intermediates.
Scope:
Demonstration of technologies for the production of advanced intermediate bioenergy and synthetic renewable energy carriers from biogenic residues and wastes, microalgae, biogenic CO, CO2 or nitrogen and renewable hydrogen and all forms of renewable energy with reduced cost and GHG emissions above the state of the art. Proposals are expected to demonstrate that conversion technologies have already reached pilot scale TRL 5. The finished quality is expected to be suitable so that the intermediates can be either directly upgraded in existing refinery infrastructures and/or further purified and processed in existing chemical infrastructures to drop-in liquid and gaseous advanced biofuels and synthetic renewable fuels, or directly used for shipping propulsion or in other off-road transport. Examples are demonstration of production of bio-oils, raw alcohols, bio-liquids, biogas, syngas and thermally pre-treated solid biomass fuels from biogenic residues and wastes and microalgae oils through chemical, biochemical, thermochemical, biological, electrochemical pathways, as well as synthetic renewable analogues. The integration of these intermediates in transport and their application in hard to electrify transport sectors should be presented. The logistics for transportation and storage of the intermediates should be addressed. The sustainability and GHG reduction should be addressed on a life-cycle assessment basis. Proposals should provide information and assessment about the economic feasibility and the potential of scaling-up the technology at commercial scale as appropriate. The exploitation plans should include preliminary feasibility study and business plan also indicating the possible funding sources to be potentially used (such as private equity, the InvestEU, the EU Catalyst Partnership and the Innovation Fund).
null
Activities are expected to achieve TRL 6-7 by the end of the project – see General Annex B.
News flashes
Call update: EVALUATION results
Published: 12/09/2023
Deadline: 16/01/2024
Available budget: EUR 246.000.000
The results of the evaluation for each topic are as follows:
D3-01-01
D3-01-02
D3-01-03
D3-01-04
D3-01-05
D3-01-06
D3-01-07
D3-01-08
D3-01-09
D3-01-10
D3-01-11
D3-01-12
D3-01-13
D3-01-14
D3-01-15
D3-01-16
D3-01-17
Number of proposals submitted (including proposals transferred from or to other calls)
12
14
13
13
13
12
14
13
2
101
8
19
5
7
10
6
2
Number of inadmissible proposals
1
Number of ineligible proposals
1
2
1
1
6
Number of above-threshold proposals
7
10
4
6
2
6
8
4
1
26
5
15
3
5
6
3
2
Total budget requested for above-threshold proposals (EUR/millions)
81.9
29.4
35.5
23.6
7.6
18.0
31.5
74.7
10.0
77.7
26.6
75.3
17.9
20.2
32.4
24.5
11.9
Number of proposals retained for funding
2
2
2
2
2
3
2
2
1
9
3
2
2
3
3
1
2
Number of proposals in the reserve list
2
2
2
2
0
2
2
2
0
10
2
2
1
2
2
2
0
Funding threshold
13.5
14.0
13.5
14.0
11.0
13.5
13.0
13.0
10.5
13.5
11.5
13.5
14.0
11.0
13.5
13.5
11.0
Ranking distribution for proposals above the evaluation thresholds
Number of proposals with scores lower or equal to 15 and higher or equal to 14
1
2
1
3
0
2
1
0
0
5
1
1
2
0
1
0
0
Number of proposals with scores lower than 14 and higher or equal to 13
2
1
3
3
1
2
1
3
0
10
1
4
0
1
3
1
0
Number of proposals with scores lower than 13 and higher or equal to 10
4
7
0
0
1
2
6
1
1
11
3
10
1
4
2
2
2
Summary of observer report:
"As independent Observer I was able to acquire deep insight into the call and evaluation documentation and accompanying instructions. I took part in a significant fraction of all briefings and panel meetings, had full access to the online evaluation SEP system and could both monitor the evaluation progress as well as having insight in individual evaluation and consensus reports.
I observed a professionally orchestrated, fair, impartial, expertise-driven, and transparent evaluation exercise. The consensus reports, the ultimate outcome, meet high standards and adhere to the guidelines outlined in the guiding documents and applicable rules.
All consensus panels were managed as equitably as possible, with effective quality control measures, inter-panel collaboration, and comprehensive final cross-checks ensuring a consistent evaluation outcome. The core principles of impartiality, fairness, and confidentiality were followed throughout the full evaluation process."
We recently informed the applicants about the evaluation results for their proposals.
For questions, please contact the Research Enquiry Service.
Call update: EVALUATION results
Published: 12/09/2023
Deadline: 16/01/2024
Available budget: EUR 246.000.000
The results of the evaluation for each topic are as follows:
D3-01-01
D3-01-02
D3-01-03
D3-01-04
D3-01-05
D3-01-06
D3-01-07
D3-01-08
D3-01-09
D3-01-10
D3-01-11
D3-01-12
D3-01-13
D3-01-14
D3-01-15
D3-01-16
D3-01-17
Number of proposals submitted (including proposals transferred from or to other calls)
12
14
13
13
13
12
14
13
2
101
8
19
5
7
10
6
2
Number of inadmissible proposals
1
Number of ineligible proposals
1
2
1
1
6
Number of above-threshold proposals
7
10
4
6
2
6
8
4
1
26
5
15
3
5
6
3
2
Total budget requested for above-threshold proposals (EUR/millions)
81.9
29.4
35.5
23.6
7.6
18.0
31.5
74.7
10.0
77.7
26.6
75.3
17.9
20.2
32.4
24.5
11.9
Number of proposals retained for funding
2
2
2
2
2
3
2
2
1
9
3
2
2
3
3
1
2
Number of proposals in the reserve list
2
2
2
2
0
2
2
2
0
10
2
2
1
2
2
2
0
Funding threshold
13.5
14.0
13.5
14.0
11.0
13.5
13.0
13.0
10.5
13.5
11.5
13.5
14.0
11.0
13.5
13.5
11.0
Ranking distribution for proposals above the evaluation thresholds
Number of proposals with scores lower or equal to 15 and higher or equal to 14
1
2
1
3
0
2
1
0
0
5
1
1
2
0
1
0
0
Number of proposals with scores lower than 14 and higher or equal to 13
2
1
3
3
1
2
1
3
0
10
1
4
0
1
3
1
0
Number of proposals with scores lower than 13 and higher or equal to 10
4
7
0
0
1
2
6
1
1
11
3
10
1
4
2
2
2
Summary of observer report:
"As independent Observer I was able to acquire deep insight into the call and evaluation documentation and accompanying instructions. I took part in a significant fraction of all briefings and panel meetings, had full access to the online evaluation SEP system and could both monitor the evaluation progress as well as having insight in individual evaluation and consensus reports.
I observed a professionally orchestrated, fair, impartial, expertise-driven, and transparent evaluation exercise. The consensus reports, the ultimate outcome, meet high standards and adhere to the guidelines outlined in the guiding documents and applicable rules.
All consensus panels were managed as equitably as possible, with effective quality control measures, inter-panel collaboration, and comprehensive final cross-checks ensuring a consistent evaluation outcome. The core principles of impartiality, fairness, and confidentiality were followed throughout the full evaluation process."
We recently informed the applicants about the evaluation results for their proposals.
For questions, please contact the Research Enquiry Service.
Opening date: 2023-09-12 (3 years ago)
Closing date: 2024-01-16 (2 years ago)
Procedure: single-stage
Budget: 20,000,000
Expected grants: 2
Contribution: 10,000,000 - 10,000,000
This call topic has been appended 6 times by the EC with news.
-
2024-05-15
call update: evaluation resultspublished... -
2024-05-15
call update: evaluation resultspublished... -
2024-01-17
the call for proposals horizon-cl5-2024-... -
2024-01-17
the call for proposals horizon-cl5-2024-... -
2023-09-12
the submission session is now available... -
2023-09-12
the submission session is now available...
HORIZON-CL5-2024-D3-01
Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.
There are 16 other topics in this call:
- HORIZON-CL5-2024-D3-01-01
- HORIZON-CL5-2024-D3-01-02
- HORIZON-CL5-2024-D3-01-04
- HORIZON-CL5-2024-D3-01-05
- HORIZON-CL5-2024-D3-01-06
- HORIZON-CL5-2024-D3-01-07
- HORIZON-CL5-2024-D3-01-08
- HORIZON-CL5-2024-D3-01-09
- HORIZON-CL5-2024-D3-01-10
- HORIZON-CL5-2024-D3-01-11
- HORIZON-CL5-2024-D3-01-12
- HORIZON-CL5-2024-D3-01-13
- HORIZON-CL5-2024-D3-01-14
- HORIZON-CL5-2024-D3-01-15
- HORIZON-CL5-2024-D3-01-16
- HORIZON-CL5-2024-D3-01-17
Showing the latest information. Found 208 versions of this call topic in the F&T portal.
Information from
- 2026-10-08_08-06-03
- 2026-10-08_08-04-19
- 2026-10-07_08-01-03
- 2026-10-07_07-59-50
- 2026-10-06_08-03-49
- 2026-10-06_08-02-30
- 2026-10-05_08-00-34
- 2026-10-05_07-59-10
- 2026-10-04_08-01-56
- 2026-10-04_08-00-03
- 2026-10-03_08-00-06
- 2026-10-03_07-58-32
- 2026-10-02_08-01-22
- 2026-10-02_08-00-15
- 2026-10-01_08-02-59
- 2026-10-01_08-01-49
- 2026-09-29_08-29-53
- 2026-09-29_08-28-14
- 2026-09-28_08-29-33
- 2026-09-28_08-27-50
- 2026-09-27_08-27-52
- 2026-09-27_08-26-09
- 2026-09-26_08-25-32
- 2026-09-26_08-23-38
- 2026-09-25_08-26-49
- 2026-09-25_08-25-16
- 2026-09-24_08-27-25
- 2026-09-24_08-25-49
- 2026-09-23_08-25-12
- 2026-09-23_08-23-17
- 2026-09-22_08-24-52
- 2026-09-22_08-23-12
- 2026-09-21_08-20-34
- 2026-09-21_08-18-57
- 2026-09-20_08-21-48
- 2026-09-20_08-20-06
- 2026-09-19_08-20-42
- 2026-09-19_08-19-18
- 2026-09-18_08-25-02
- 2026-09-18_08-23-32
- 2026-09-17_08-19-06
- 2026-09-17_08-17-28
- 2026-09-16_08-16-32
- 2026-09-16_08-14-58
- 2026-09-15_08-18-13
- 2026-09-15_08-17-05
- 2026-09-14_08-17-50
- 2026-09-14_08-16-13
- 2026-09-13_08-18-13
- 2026-09-13_08-16-37
- 2026-09-12_08-21-05
- 2026-09-12_08-19-22
- 2026-09-11_08-20-16
- 2026-09-11_08-18-51
- 2026-09-10_08-18-43
- 2026-09-10_08-17-11
- 2026-09-09_08-19-05
- 2026-09-09_08-17-27
- 2026-09-08_08-18-25
- 2026-09-08_08-17-07
- 2026-09-07_08-15-32
- 2026-09-07_08-14-14
- 2026-09-06_08-16-31
- 2026-09-06_08-14-53
- 2026-09-05_08-15-55
- 2026-09-05_08-14-21
- 2026-09-04_08-14-00
- 2026-09-04_08-12-33
- 2026-09-03_08-14-00
- 2026-09-03_08-12-27
- 2026-09-02_08-15-23
- 2026-09-02_08-14-07
- 2026-09-01_08-13-24
- 2026-09-01_08-12-49
- 2026-08-31_08-16-50
- 2026-08-31_08-15-18
- 2026-08-30_08-10-02
- 2026-08-30_08-08-27
- 2026-08-29_08-11-32
- 2026-08-29_08-09-51
- 2026-08-28_08-13-32
- 2026-08-28_08-12-50
- 2026-08-27_08-05-42
- 2026-08-27_08-04-14
- 2026-08-25_08-11-35
- 2026-08-25_08-10-12
- 2026-08-24_08-05-10
- 2026-08-24_08-04-40
- 2026-08-23_08-04-44
- 2026-08-23_08-04-17
- 2026-08-22_08-06-06
- 2026-08-22_08-04-31
- 2026-08-21_08-01-07
- 2026-08-21_08-00-13
- 2026-08-20_08-04-05
- 2026-08-20_08-03-30
- 2026-08-19_08-03-54
- 2026-08-19_08-02-47
- 2026-08-18_08-00-29
- 2026-08-18_07-59-33
- 2026-08-17_08-00-11
- 2026-08-17_07-59-03
- 2026-08-16_07-56-37
- 2026-08-16_07-55-41
- 2026-08-15_07-58-13
- 2026-08-15_07-57-13
- 2026-08-14_07-57-26
- 2026-08-14_07-56-56
- 2026-08-13_07-57-24
- 2026-08-13_07-56-55
- 2026-08-12_07-56-02
- 2026-08-12_07-55-35
- 2026-08-11_07-57-01
- 2026-08-11_07-55-54
- 2026-08-10_07-53-16
- 2026-08-10_07-52-44
- 2026-08-09_07-53-14
- 2026-08-09_07-52-13
- 2026-08-08_07-52-25
- 2026-08-08_07-51-51
- 2026-08-07_07-50-43
- 2026-08-07_07-50-13
- 2026-08-06_07-51-42
- 2026-08-06_07-51-14
- 2026-08-05_07-53-49
- 2026-08-05_07-52-40
- 2026-08-04_07-53-00
- 2026-08-04_07-52-32
- 2026-08-03_07-50-59
- 2026-08-03_07-50-23
- 2026-08-02_07-51-39
- 2026-08-02_07-50-51
- 2026-08-01_07-51-12
- 2026-08-01_07-50-43
- 2026-07-31_07-49-42
- 2026-07-31_07-49-13
- 2026-07-30_07-49-03
- 2026-07-30_07-48-31
- 2026-07-29_07-50-37
- 2026-07-29_07-49-44
- 2026-07-28_07-50-20
- 2026-07-28_07-49-24
- 2026-07-27_07-45-53
- 2026-07-27_07-45-28
- 2026-07-26_07-44-36
- 2026-07-26_07-43-45
- 2026-07-25_07-44-56
- 2026-07-25_07-44-01
- 2026-07-24_07-45-01
- 2026-07-24_07-44-34
- 2026-07-23_07-44-18
- 2026-07-23_07-43-27
- 2026-07-22_07-45-44
- 2026-07-22_07-45-21
- 2026-07-21_07-43-15
- 2026-07-21_07-42-29
- 2026-07-20_07-43-34
- 2026-07-20_07-42-44
- 2026-07-19_07-42-59
- 2026-07-19_07-42-28
- 2026-07-18_07-43-20
- 2026-07-18_07-42-52
- 2026-07-17_07-42-20
- 2026-07-17_07-41-54
- 2026-07-16_07-29-02
- 2026-07-16_07-28-43
- 2026-07-15_07-28-11
- 2026-07-15_07-27-48
- 2026-07-14_07-27-28
- 2026-07-14_07-27-13
- 2026-07-13_07-28-08
- 2026-07-13_07-27-48
- 2026-07-12_07-28-36
- 2026-07-12_07-28-01
- 2026-07-11_07-27-46
- 2026-07-11_07-27-11
- 2026-07-10_07-27-28
- 2026-07-10_07-26-51
- 2026-07-09_07-27-19
- 2026-07-09_07-26-40
- 2026-07-08_07-27-17
- 2026-07-08_07-26-41
- 2026-07-07_07-26-28
- 2026-07-07_07-25-54
- 2026-07-06_07-26-52
- 2026-07-06_07-26-36
- 2026-07-05_07-24-30
- 2026-07-05_07-23-49
- 2026-07-04_07-25-32
- 2026-07-04_07-25-16
- 2026-07-02_07-24-21
- 2026-07-02_07-24-03
- 2026-07-01_07-38-01
- 2026-07-01_07-37-40
- 2026-06-30_09-49-02
- 2026-06-30_07-34-36
- 2026-06-29_11-34-52
- 2026-06-29_07-37-14
- 2026-06-28_09-31-47
- 2026-06-28_07-33-47
- 2026-06-27_09-32-19
- 2026-06-27_07-34-25
- 2026-06-27_07-34-10
- 2026-02-18_06-56-36
- 2024-11-23_03-30-32
- 2024-09-30_21-22-35
- 2024-07-04_15-01-35
- 2024-03-30_14-18-32
Check the differences between the versions.
Annotations
Events
Hand-picked events relevant to this call topic.
No events yet
There are currently no events linked to this call topic.
Timeline
Call published · 30 Sep 2024 (2 years ago)
All expected milestones for this call have passed.
Work programme published
07 Oct 2022 · est.
Call opens
12 Sep 2023
Call closes
16 Jan 2024
Outcome expected
16 Jun 2024 · est.
Grant agreement signed
16 Sep 2024 · est.
Call published
30 Sep 2024
-
Work programme published Estimated
07 Oct 2022 · 4 years ago
Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.
-
Call opens
12 Sep 2023 · 3 years ago
Submissions can be made from this date.
-
Call closes
16 Jan 2024 · 2 years ago
Deadline to submit a proposal.
-
Outcome expected Estimated
16 Jun 2024 · 2 years ago
The maximum time to inform applicants of the evaluation outcome is five months after the call closes.
-
Grant agreement signed Estimated
16 Sep 2024 · 2 years ago
The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.
-
Call published
30 Sep 2024 · 2 years ago
This topic was first published in TopicTree.
Funded Projects
Loading...
Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)
Ecosystem bubbles
This call topic is part of the following thematic bubbles.
Not part of a bubble yet
This call topic has not been grouped into an ecosystem bubble.