HORIZON-CL5-2024-D3-01-04
Improvement of light harvesting and carbon fixation with synthetic biology and/or bio-inspired//biomimetic pathways for renewable direct solar fuels production -
Call text (as on F&T portal)
View on F&T portalExpected Outcome:
Project results are expected to contribute to at least 3 of the following expected outcomes:
- Availability of disruptive and sustainable solar fuel technologies in order to accelerate the replacement of fossil-based energy technologies with more efficient use of primary solar energy in solar fuel production.
- Reduced cost and improved efficiency of solar-based renewable fuel technologies and their value chains by addressing rate-limiting steps in the solar fuels value chain.
- Increase technology leadership, competitiveness and technology export potential of European industry in possibly game-changing solar fuel and synthetic biological technologies.
- Enhanced sustainability of solar fuels, taking fully into account circular economy, social, economic and environmental aspects in line with the European Green Deal priorities.
- Reinforced European scientific basis and European export potential for renewable energy technologies through international collaborations (e.g., the AU-EU Climate Change and Sustainable Energy partnership, the missions and innovation communities of Mission Innovation 2.0).
- Increasing the European energy security and reliability by improving the solar fuel conversion efficiency as well as maintaining and fostering the European global leadership in affordable, secure and sustainable solar fuel technologies.
Scope:
Development of novel in-vivo or in-vitro biochemical and/or bio-inspired/biomimetic pathways for solar fuel production with increased efficiency in comparison to light and dark reactions of natural photosynthesis by synthetic biological and/or bio-inspired/biomimetic approaches. The aim is to achieve a significant improvement of components of both, light harvesting and carbon fixation, which are rate limiting for the conversion of solar energy to renewable fuels. Proposals are expected to include case studies for analysing the potential and impact of the technology for future application at scale and analyse possible interfaces with other solar fuel technologies, with a particular focus on socioeconomic and environmental sustainability including circular economy, social, economic and environmental aspects and cost-effectiveness. All relevant aspects of safety of the technology are expected to be addressed. Hydrogen as a fuel and end-product is excluded.
Projects are expected where possible to collaborate with and contribute to the activities of the Coordination and Support Action funded under the topic HORIZON-CL4-2021-RESILIENCE-01-16
null
Activities are expected to achieve TRL 3-4 by the end of the project – see General Annex B.
News flashes
Call update: EVALUATION results
Published: 12/09/2023
Deadline: 16/01/2024
Available budget: EUR 246.000.000
The results of the evaluation for each topic are as follows:
D3-01-01
D3-01-02
D3-01-03
D3-01-04
D3-01-05
D3-01-06
D3-01-07
D3-01-08
D3-01-09
D3-01-10
D3-01-11
D3-01-12
D3-01-13
D3-01-14
D3-01-15
D3-01-16
D3-01-17
Number of proposals submitted (including proposals transferred from or to other calls)
12
14
13
13
13
12
14
13
2
101
8
19
5
7
10
6
2
Number of inadmissible proposals
1
Number of ineligible proposals
1
2
1
1
6
Number of above-threshold proposals
7
10
4
6
2
6
8
4
1
26
5
15
3
5
6
3
2
Total budget requested for above-threshold proposals (EUR/millions)
81.9
29.4
35.5
23.6
7.6
18.0
31.5
74.7
10.0
77.7
26.6
75.3
17.9
20.2
32.4
24.5
11.9
Number of proposals retained for funding
2
2
2
2
2
3
2
2
1
9
3
2
2
3
3
1
2
Number of proposals in the reserve list
2
2
2
2
0
2
2
2
0
10
2
2
1
2
2
2
0
Funding threshold
13.5
14.0
13.5
14.0
11.0
13.5
13.0
13.0
10.5
13.5
11.5
13.5
14.0
11.0
13.5
13.5
11.0
Ranking distribution for proposals above the evaluation thresholds
Number of proposals with scores lower or equal to 15 and higher or equal to 14
1
2
1
3
0
2
1
0
0
5
1
1
2
0
1
0
0
Number of proposals with scores lower than 14 and higher or equal to 13
2
1
3
3
1
2
1
3
0
10
1
4
0
1
3
1
0
Number of proposals with scores lower than 13 and higher or equal to 10
4
7
0
0
1
2
6
1
1
11
3
10
1
4
2
2
2
Summary of observer report:
"As independent Observer I was able to acquire deep insight into the call and evaluation documentation and accompanying instructions. I took part in a significant fraction of all briefings and panel meetings, had full access to the online evaluation SEP system and could both monitor the evaluation progress as well as having insight in individual evaluation and consensus reports.
I observed a professionally orchestrated, fair, impartial, expertise-driven, and transparent evaluation exercise. The consensus reports, the ultimate outcome, meet high standards and adhere to the guidelines outlined in the guiding documents and applicable rules.
All consensus panels were managed as equitably as possible, with effective quality control measures, inter-panel collaboration, and comprehensive final cross-checks ensuring a consistent evaluation outcome. The core principles of impartiality, fairness, and confidentiality were followed throughout the full evaluation process."
We recently informed the applicants about the evaluation results for their proposals.
For questions, please contact the Research Enquiry Service.
Call update: EVALUATION results
Published: 12/09/2023
Deadline: 16/01/2024
Available budget: EUR 246.000.000
The results of the evaluation for each topic are as follows:
D3-01-01
D3-01-02
D3-01-03
D3-01-04
D3-01-05
D3-01-06
D3-01-07
D3-01-08
D3-01-09
D3-01-10
D3-01-11
D3-01-12
D3-01-13
D3-01-14
D3-01-15
D3-01-16
D3-01-17
Number of proposals submitted (including proposals transferred from or to other calls)
12
14
13
13
13
12
14
13
2
101
8
19
5
7
10
6
2
Number of inadmissible proposals
1
Number of ineligible proposals
1
2
1
1
6
Number of above-threshold proposals
7
10
4
6
2
6
8
4
1
26
5
15
3
5
6
3
2
Total budget requested for above-threshold proposals (EUR/millions)
81.9
29.4
35.5
23.6
7.6
18.0
31.5
74.7
10.0
77.7
26.6
75.3
17.9
20.2
32.4
24.5
11.9
Number of proposals retained for funding
2
2
2
2
2
3
2
2
1
9
3
2
2
3
3
1
2
Number of proposals in the reserve list
2
2
2
2
0
2
2
2
0
10
2
2
1
2
2
2
0
Funding threshold
13.5
14.0
13.5
14.0
11.0
13.5
13.0
13.0
10.5
13.5
11.5
13.5
14.0
11.0
13.5
13.5
11.0
Ranking distribution for proposals above the evaluation thresholds
Number of proposals with scores lower or equal to 15 and higher or equal to 14
1
2
1
3
0
2
1
0
0
5
1
1
2
0
1
0
0
Number of proposals with scores lower than 14 and higher or equal to 13
2
1
3
3
1
2
1
3
0
10
1
4
0
1
3
1
0
Number of proposals with scores lower than 13 and higher or equal to 10
4
7
0
0
1
2
6
1
1
11
3
10
1
4
2
2
2
Summary of observer report:
"As independent Observer I was able to acquire deep insight into the call and evaluation documentation and accompanying instructions. I took part in a significant fraction of all briefings and panel meetings, had full access to the online evaluation SEP system and could both monitor the evaluation progress as well as having insight in individual evaluation and consensus reports.
I observed a professionally orchestrated, fair, impartial, expertise-driven, and transparent evaluation exercise. The consensus reports, the ultimate outcome, meet high standards and adhere to the guidelines outlined in the guiding documents and applicable rules.
All consensus panels were managed as equitably as possible, with effective quality control measures, inter-panel collaboration, and comprehensive final cross-checks ensuring a consistent evaluation outcome. The core principles of impartiality, fairness, and confidentiality were followed throughout the full evaluation process."
We recently informed the applicants about the evaluation results for their proposals.
For questions, please contact the Research Enquiry Service.
Opening date: 2023-09-12 (3 years ago)
Closing date: 2024-01-16 (2 years ago)
Procedure: single-stage
Budget: 8,000,000
Expected grants: 2
Contribution: 4,000,000 - 4,000,000
This call topic has been appended 6 times by the EC with news.
-
2024-05-15
call update: evaluation resultspublished... -
2024-05-15
call update: evaluation resultspublished... -
2024-01-17
the call for proposals horizon-cl5-2024-... -
2024-01-17
the call for proposals horizon-cl5-2024-... -
2023-09-12
the submission session is now available... -
2023-09-12
the submission session is now available...
HORIZON-CL5-2024-D3-01
Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.
There are 16 other topics in this call:
- HORIZON-CL5-2024-D3-01-01
- HORIZON-CL5-2024-D3-01-02
- HORIZON-CL5-2024-D3-01-03
- HORIZON-CL5-2024-D3-01-05
- HORIZON-CL5-2024-D3-01-06
- HORIZON-CL5-2024-D3-01-07
- HORIZON-CL5-2024-D3-01-08
- HORIZON-CL5-2024-D3-01-09
- HORIZON-CL5-2024-D3-01-10
- HORIZON-CL5-2024-D3-01-11
- HORIZON-CL5-2024-D3-01-12
- HORIZON-CL5-2024-D3-01-13
- HORIZON-CL5-2024-D3-01-14
- HORIZON-CL5-2024-D3-01-15
- HORIZON-CL5-2024-D3-01-16
- HORIZON-CL5-2024-D3-01-17
Showing the latest information. Found 208 versions of this call topic in the F&T portal.
Information from
- 2026-10-08_08-04-19
- 2026-10-08_08-04-14
- 2026-10-07_07-59-50
- 2026-10-07_07-59-46
- 2026-10-06_08-02-31
- 2026-10-06_08-02-25
- 2026-10-05_07-59-16
- 2026-10-05_07-59-04
- 2026-10-04_08-00-06
- 2026-10-04_08-00-01
- 2026-10-03_07-58-33
- 2026-10-03_07-58-28
- 2026-10-02_08-01-06
- 2026-10-02_08-00-13
- 2026-10-01_08-02-40
- 2026-10-01_08-01-48
- 2026-09-29_08-29-31
- 2026-09-29_08-28-13
- 2026-09-28_08-29-07
- 2026-09-28_08-27-49
- 2026-09-27_08-27-22
- 2026-09-27_08-26-07
- 2026-09-26_08-25-04
- 2026-09-26_08-23-37
- 2026-09-25_08-26-29
- 2026-09-25_08-25-15
- 2026-09-24_08-27-01
- 2026-09-24_08-25-49
- 2026-09-23_08-24-38
- 2026-09-23_08-23-16
- 2026-09-22_08-24-26
- 2026-09-22_08-23-11
- 2026-09-21_08-20-12
- 2026-09-21_08-18-56
- 2026-09-20_08-21-20
- 2026-09-20_08-20-05
- 2026-09-19_08-20-19
- 2026-09-19_08-19-17
- 2026-09-18_08-24-38
- 2026-09-18_08-23-31
- 2026-09-17_08-18-41
- 2026-09-17_08-17-27
- 2026-09-16_08-15-59
- 2026-09-16_08-14-57
- 2026-09-15_08-17-57
- 2026-09-15_08-17-04
- 2026-09-14_08-17-27
- 2026-09-14_08-16-12
- 2026-09-13_08-17-48
- 2026-09-13_08-16-36
- 2026-09-12_08-20-34
- 2026-09-12_08-19-21
- 2026-09-11_08-19-51
- 2026-09-11_08-18-50
- 2026-09-10_08-18-22
- 2026-09-10_08-17-11
- 2026-09-09_08-18-38
- 2026-09-09_08-17-26
- 2026-09-08_08-18-03
- 2026-09-08_08-17-06
- 2026-09-07_08-15-05
- 2026-09-07_08-14-14
- 2026-09-06_08-15-54
- 2026-09-06_08-14-52
- 2026-09-05_08-15-28
- 2026-09-05_08-14-20
- 2026-09-04_08-13-36
- 2026-09-04_08-12-32
- 2026-09-03_08-13-25
- 2026-09-03_08-12-27
- 2026-09-02_08-15-03
- 2026-09-02_08-14-06
- 2026-09-01_08-13-51
- 2026-09-01_08-12-48
- 2026-08-31_08-16-21
- 2026-08-31_08-15-17
- 2026-08-30_08-09-26
- 2026-08-30_08-08-26
- 2026-08-29_08-10-50
- 2026-08-29_08-09-49
- 2026-08-28_08-14-07
- 2026-08-28_08-12-50
- 2026-08-27_08-05-11
- 2026-08-27_08-04-13
- 2026-08-25_08-11-10
- 2026-08-25_08-10-11
- 2026-08-24_08-05-52
- 2026-08-24_08-04-39
- 2026-08-23_08-05-06
- 2026-08-23_08-04-15
- 2026-08-22_08-05-29
- 2026-08-22_08-04-30
- 2026-08-21_08-00-52
- 2026-08-21_08-00-13
- 2026-08-20_08-04-31
- 2026-08-20_08-03-29
- 2026-08-19_08-03-33
- 2026-08-19_08-02-47
- 2026-08-18_08-00-12
- 2026-08-18_07-59-33
- 2026-08-17_07-59-53
- 2026-08-17_07-59-02
- 2026-08-16_07-56-14
- 2026-08-16_07-55-40
- 2026-08-15_07-57-56
- 2026-08-15_07-57-12
- 2026-08-14_07-57-49
- 2026-08-14_07-56-55
- 2026-08-13_07-57-41
- 2026-08-13_07-56-54
- 2026-08-12_07-56-22
- 2026-08-12_07-55-34
- 2026-08-11_07-56-44
- 2026-08-11_07-55-53
- 2026-08-10_07-53-41
- 2026-08-10_07-52-42
- 2026-08-09_07-53-01
- 2026-08-09_07-52-12
- 2026-08-08_07-52-46
- 2026-08-08_07-51-50
- 2026-08-07_07-51-05
- 2026-08-07_07-50-10
- 2026-08-06_07-52-03
- 2026-08-06_07-51-13
- 2026-08-05_07-53-31
- 2026-08-05_07-52-39
- 2026-08-04_07-53-28
- 2026-08-04_07-52-31
- 2026-08-03_07-51-17
- 2026-08-03_07-50-20
- 2026-08-02_07-51-28
- 2026-08-02_07-50-50
- 2026-08-01_07-51-42
- 2026-08-01_07-50-43
- 2026-07-31_07-50-02
- 2026-07-31_07-49-12
- 2026-07-30_07-49-26
- 2026-07-30_07-48-30
- 2026-07-29_07-50-24
- 2026-07-29_07-49-43
- 2026-07-28_07-50-02
- 2026-07-28_07-49-23
- 2026-07-27_07-46-13
- 2026-07-27_07-45-28
- 2026-07-26_07-44-16
- 2026-07-26_07-43-44
- 2026-07-25_07-44-47
- 2026-07-25_07-44-00
- 2026-07-24_07-45-23
- 2026-07-24_07-44-32
- 2026-07-23_07-44-03
- 2026-07-23_07-43-27
- 2026-07-22_07-46-03
- 2026-07-22_07-45-20
- 2026-07-21_07-42-57
- 2026-07-21_07-42-27
- 2026-07-20_07-43-29
- 2026-07-20_07-42-43
- 2026-07-19_07-43-22
- 2026-07-19_07-42-28
- 2026-07-18_07-43-40
- 2026-07-18_07-42-50
- 2026-07-17_07-42-39
- 2026-07-17_07-41-53
- 2026-07-16_07-29-16
- 2026-07-16_07-28-42
- 2026-07-15_07-28-30
- 2026-07-15_07-27-48
- 2026-07-14_07-27-41
- 2026-07-14_07-27-11
- 2026-07-13_07-28-22
- 2026-07-13_07-27-47
- 2026-07-12_07-28-25
- 2026-07-12_07-28-00
- 2026-07-11_07-27-41
- 2026-07-11_07-27-10
- 2026-07-10_07-27-15
- 2026-07-10_07-26-50
- 2026-07-09_07-27-07
- 2026-07-09_07-26-39
- 2026-07-08_07-27-06
- 2026-07-08_07-26-39
- 2026-07-07_07-26-18
- 2026-07-07_07-25-53
- 2026-07-06_07-27-06
- 2026-07-06_07-26-34
- 2026-07-05_07-24-23
- 2026-07-05_07-23-47
- 2026-07-04_07-25-47
- 2026-07-04_07-25-15
- 2026-07-03_07-25-22
- 2026-07-03_07-24-54
- 2026-07-02_07-24-33
- 2026-07-02_07-24-01
- 2026-07-01_07-38-18
- 2026-07-01_07-37-38
- 2026-06-30_09-49-01
- 2026-06-30_07-34-53
- 2026-06-30_07-34-12
- 2026-06-28_07-34-02
- 2026-06-27_09-32-18
- 2026-06-27_07-34-38
- 2026-06-27_07-34-08
- 2026-02-18_06-56-34
- 2024-11-23_03-30-32
- 2024-09-30_21-22-35
- 2024-07-04_15-01-42
- 2024-03-30_14-18-27
Check the differences between the versions.
Annotations
Events
Hand-picked events relevant to this call topic.
No events yet
There are currently no events linked to this call topic.
Timeline
Call published · 30 Sep 2024 (2 years ago)
All expected milestones for this call have passed.
Work programme published
07 Oct 2022 · est.
Call opens
12 Sep 2023
Call closes
16 Jan 2024
Outcome expected
16 Jun 2024 · est.
Grant agreement signed
16 Sep 2024 · est.
Call published
30 Sep 2024
-
Work programme published Estimated
07 Oct 2022 · 4 years ago
Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.
-
Call opens
12 Sep 2023 · 3 years ago
Submissions can be made from this date.
-
Call closes
16 Jan 2024 · 2 years ago
Deadline to submit a proposal.
-
Outcome expected Estimated
16 Jun 2024 · 2 years ago
The maximum time to inform applicants of the evaluation outcome is five months after the call closes.
-
Grant agreement signed Estimated
16 Sep 2024 · 2 years ago
The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.
-
Call published
30 Sep 2024 · 2 years ago
This topic was first published in TopicTree.
Funded Projects
Loading...
Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)
Ecosystem bubbles
This call topic is part of the following thematic bubbles.
Not part of a bubble yet
This call topic has not been grouped into an ecosystem bubble.