HORIZON-CL5-2024-D3-01-12
Energy Management Systems for flexibility services -
Call text (as on F&T portal)
View on F&T portalExpected Outcome:
Project results are expected to contribute to all of the following expected outcomes:
- Contribute to the use of smart buildings and smart industrial sites for the integration of renewables in the energy system in an efficient way.
- Demonstrate aggregation of multiple (building or industrial) energy management systems to provide flexibility services (wholesale market price signals, demand response, flexible production, smart charging, balancing & frequency services, congestion management) to the electricity network.
- Demonstrate interoperability and data exchange technologies to aggregate data from different sources and in different formats through cooperation between aggregators and energy management system developers.
- Piloting and demonstration of flexibility pool operations at the local and regional levels.
The selected projects should propose recommendations how current products, markets and market processes for flexibility should be adapted to accommodate these new services and/or fully benefit from the potential these improved energy management services will bring.
Scope:
Projects are expected to:
- Develop solutions to aggregate flexibility from different (types of) energy consumers that use different energy management systems to develop interoperable solutions to optimise the energy management systems and valorise its flexibility in wholesale markets and for balancing and/or congestion management services).
- Define and demonstrate the type of flexibility services that clusters of smart buildings and smart industrial sites can provide.
- Cooperate with (one or more) TSOs and/or DSOs, preferably making use of day-to-day operational flexibility markets (i.e. not R&I projects or regulatory sandboxes).
- Include at least 3 different energy management systems in case of industry, or 5 in case of buildings, developed by different technology providers and that use different protocols/standards/proprietary solutions for the energy management system.
- Involve at least 3 different energy system management service companies in case of industry, or 5 in case of buildings.
- Include at least 2 aggregators to ensure that developed solutions are based on standards and to avoid proprietary solutions.
- Include at least 1 home appliances producer in case of buildings. To ensure interoperability and integration into the grid, specific demonstrators will make use of operational end-to-end architectures, digital platforms and other data exchange infrastructure for the energy system being developed under ongoing Horizon 2020, Horizon Europe as well as under other EU programs such as the Digital Europe Program. Preferably semantically interoperable interactions, as enabled by the ETSI SAREF ontologies, are used.
Design and demonstrate appropriate concepts for acquiring and activating flexibility (implicit and explicit) that allow to maximally benefit from the potential of these new services. The project should demonstrate or recommend how the coordination and cooperation between TSO and DSO has to be organized to adopt the different concepts for services, products and markets.
The selected projects are expected to contribute to the BRIDGE initiative[1], actively participate to its activities and allocate up to 2% of their budgets to that end. Additional contributions to the ‘Alliance for Internet of Things Innovation’ (AIOTI) and other relevant activities (e.g. clusters of digital projects and coordinating actions) might be considered, when relevant.
null
Activities are expected to achieve TRL 7-8 by the end of the project – see General Annex B.
[1] https://www.h2020-bridge.eu/
News flashes
Call update: EVALUATION results
Published: 12/09/2023
Deadline: 16/01/2024
Available budget: EUR 246.000.000
The results of the evaluation for each topic are as follows:
D3-01-01
D3-01-02
D3-01-03
D3-01-04
D3-01-05
D3-01-06
D3-01-07
D3-01-08
D3-01-09
D3-01-10
D3-01-11
D3-01-12
D3-01-13
D3-01-14
D3-01-15
D3-01-16
D3-01-17
Number of proposals submitted (including proposals transferred from or to other calls)
12
14
13
13
13
12
14
13
2
101
8
19
5
7
10
6
2
Number of inadmissible proposals
1
Number of ineligible proposals
1
2
1
1
6
Number of above-threshold proposals
7
10
4
6
2
6
8
4
1
26
5
15
3
5
6
3
2
Total budget requested for above-threshold proposals (EUR/millions)
81.9
29.4
35.5
23.6
7.6
18.0
31.5
74.7
10.0
77.7
26.6
75.3
17.9
20.2
32.4
24.5
11.9
Number of proposals retained for funding
2
2
2
2
2
3
2
2
1
9
3
2
2
3
3
1
2
Number of proposals in the reserve list
2
2
2
2
0
2
2
2
0
10
2
2
1
2
2
2
0
Funding threshold
13.5
14.0
13.5
14.0
11.0
13.5
13.0
13.0
10.5
13.5
11.5
13.5
14.0
11.0
13.5
13.5
11.0
Ranking distribution for proposals above the evaluation thresholds
Number of proposals with scores lower or equal to 15 and higher or equal to 14
1
2
1
3
0
2
1
0
0
5
1
1
2
0
1
0
0
Number of proposals with scores lower than 14 and higher or equal to 13
2
1
3
3
1
2
1
3
0
10
1
4
0
1
3
1
0
Number of proposals with scores lower than 13 and higher or equal to 10
4
7
0
0
1
2
6
1
1
11
3
10
1
4
2
2
2
Summary of observer report:
"As independent Observer I was able to acquire deep insight into the call and evaluation documentation and accompanying instructions. I took part in a significant fraction of all briefings and panel meetings, had full access to the online evaluation SEP system and could both monitor the evaluation progress as well as having insight in individual evaluation and consensus reports.
I observed a professionally orchestrated, fair, impartial, expertise-driven, and transparent evaluation exercise. The consensus reports, the ultimate outcome, meet high standards and adhere to the guidelines outlined in the guiding documents and applicable rules.
All consensus panels were managed as equitably as possible, with effective quality control measures, inter-panel collaboration, and comprehensive final cross-checks ensuring a consistent evaluation outcome. The core principles of impartiality, fairness, and confidentiality were followed throughout the full evaluation process."
We recently informed the applicants about the evaluation results for their proposals.
For questions, please contact the Research Enquiry Service.
Call update: EVALUATION results
Published: 12/09/2023
Deadline: 16/01/2024
Available budget: EUR 246.000.000
The results of the evaluation for each topic are as follows:
D3-01-01
D3-01-02
D3-01-03
D3-01-04
D3-01-05
D3-01-06
D3-01-07
D3-01-08
D3-01-09
D3-01-10
D3-01-11
D3-01-12
D3-01-13
D3-01-14
D3-01-15
D3-01-16
D3-01-17
Number of proposals submitted (including proposals transferred from or to other calls)
12
14
13
13
13
12
14
13
2
101
8
19
5
7
10
6
2
Number of inadmissible proposals
1
Number of ineligible proposals
1
2
1
1
6
Number of above-threshold proposals
7
10
4
6
2
6
8
4
1
26
5
15
3
5
6
3
2
Total budget requested for above-threshold proposals (EUR/millions)
81.9
29.4
35.5
23.6
7.6
18.0
31.5
74.7
10.0
77.7
26.6
75.3
17.9
20.2
32.4
24.5
11.9
Number of proposals retained for funding
2
2
2
2
2
3
2
2
1
9
3
2
2
3
3
1
2
Number of proposals in the reserve list
2
2
2
2
0
2
2
2
0
10
2
2
1
2
2
2
0
Funding threshold
13.5
14.0
13.5
14.0
11.0
13.5
13.0
13.0
10.5
13.5
11.5
13.5
14.0
11.0
13.5
13.5
11.0
Ranking distribution for proposals above the evaluation thresholds
Number of proposals with scores lower or equal to 15 and higher or equal to 14
1
2
1
3
0
2
1
0
0
5
1
1
2
0
1
0
0
Number of proposals with scores lower than 14 and higher or equal to 13
2
1
3
3
1
2
1
3
0
10
1
4
0
1
3
1
0
Number of proposals with scores lower than 13 and higher or equal to 10
4
7
0
0
1
2
6
1
1
11
3
10
1
4
2
2
2
Summary of observer report:
"As independent Observer I was able to acquire deep insight into the call and evaluation documentation and accompanying instructions. I took part in a significant fraction of all briefings and panel meetings, had full access to the online evaluation SEP system and could both monitor the evaluation progress as well as having insight in individual evaluation and consensus reports.
I observed a professionally orchestrated, fair, impartial, expertise-driven, and transparent evaluation exercise. The consensus reports, the ultimate outcome, meet high standards and adhere to the guidelines outlined in the guiding documents and applicable rules.
All consensus panels were managed as equitably as possible, with effective quality control measures, inter-panel collaboration, and comprehensive final cross-checks ensuring a consistent evaluation outcome. The core principles of impartiality, fairness, and confidentiality were followed throughout the full evaluation process."
We recently informed the applicants about the evaluation results for their proposals.
For questions, please contact the Research Enquiry Service.
Opening date: 2023-09-12 (3 years ago)
Closing date: 2024-01-16 (2 years ago)
Procedure: single-stage
Budget: 10,000,000
Expected grants: 2
Contribution: 5,000,000 - 5,000,000
This call topic has been appended 6 times by the EC with news.
-
2024-05-15
call update: evaluation resultspublished... -
2024-05-15
call update: evaluation resultspublished... -
2024-01-17
the call for proposals horizon-cl5-2024-... -
2024-01-17
the call for proposals horizon-cl5-2024-... -
2023-09-12
the submission session is now available... -
2023-09-12
the submission session is now available...
HORIZON-CL5-2024-D3-01
Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.
There are 16 other topics in this call:
- HORIZON-CL5-2024-D3-01-01
- HORIZON-CL5-2024-D3-01-02
- HORIZON-CL5-2024-D3-01-03
- HORIZON-CL5-2024-D3-01-04
- HORIZON-CL5-2024-D3-01-05
- HORIZON-CL5-2024-D3-01-06
- HORIZON-CL5-2024-D3-01-07
- HORIZON-CL5-2024-D3-01-08
- HORIZON-CL5-2024-D3-01-09
- HORIZON-CL5-2024-D3-01-10
- HORIZON-CL5-2024-D3-01-11
- HORIZON-CL5-2024-D3-01-13
- HORIZON-CL5-2024-D3-01-14
- HORIZON-CL5-2024-D3-01-15
- HORIZON-CL5-2024-D3-01-16
- HORIZON-CL5-2024-D3-01-17
Showing the latest information. Found 184 versions of this call topic in the F&T portal.
Information from
- 2026-10-08_08-05-11
- 2026-10-08_08-04-17
- 2026-10-07_08-00-44
- 2026-10-07_07-59-49
- 2026-10-06_08-03-09
- 2026-10-06_08-02-28
- 2026-10-05_08-00-08
- 2026-10-05_07-59-08
- 2026-10-04_08-01-20
- 2026-10-04_08-00-03
- 2026-10-03_07-59-40
- 2026-10-03_07-58-30
- 2026-10-02_08-00-21
- 2026-10-02_08-00-14
- 2026-10-01_08-01-56
- 2026-10-01_08-01-48
- 2026-09-29_08-28-18
- 2026-09-29_08-28-13
- 2026-09-28_08-27-55
- 2026-09-28_08-27-49
- 2026-09-27_08-26-14
- 2026-09-27_08-26-08
- 2026-09-26_08-23-42
- 2026-09-26_08-23-37
- 2026-09-25_08-25-19
- 2026-09-25_08-25-16
- 2026-09-24_08-25-54
- 2026-09-24_08-25-49
- 2026-09-23_08-23-23
- 2026-09-23_08-23-16
- 2026-09-22_08-23-13
- 2026-09-22_08-23-11
- 2026-09-21_08-18-58
- 2026-09-21_08-18-56
- 2026-09-20_08-20-17
- 2026-09-20_08-20-05
- 2026-09-19_08-19-23
- 2026-09-19_08-19-18
- 2026-09-18_08-23-34
- 2026-09-18_08-23-32
- 2026-09-17_08-17-29
- 2026-09-17_08-17-27
- 2026-09-16_08-15-03
- 2026-09-16_08-14-57
- 2026-09-15_08-17-09
- 2026-09-15_08-17-04
- 2026-09-14_08-16-17
- 2026-09-14_08-16-12
- 2026-09-13_08-16-41
- 2026-09-13_08-16-36
- 2026-09-12_08-19-25
- 2026-09-12_08-19-22
- 2026-09-11_08-18-53
- 2026-09-11_08-18-51
- 2026-09-10_08-17-12
- 2026-09-10_08-17-11
- 2026-09-09_08-17-35
- 2026-09-09_08-17-26
- 2026-09-08_08-17-14
- 2026-09-08_08-17-06
- 2026-09-07_08-14-21
- 2026-09-07_08-14-14
- 2026-09-06_08-15-01
- 2026-09-06_08-14-52
- 2026-09-05_08-14-22
- 2026-09-05_08-14-21
- 2026-09-04_08-12-39
- 2026-09-04_08-12-32
- 2026-09-03_08-12-35
- 2026-09-03_08-12-27
- 2026-09-02_08-14-15
- 2026-09-02_08-14-06
- 2026-09-01_08-13-00
- 2026-09-01_08-12-48
- 2026-08-31_08-15-20
- 2026-08-31_08-15-17
- 2026-08-30_08-08-36
- 2026-08-30_08-08-26
- 2026-08-29_08-10-02
- 2026-08-29_08-09-48
- 2026-08-28_08-12-52
- 2026-08-28_08-12-50
- 2026-08-27_08-04-23
- 2026-08-27_08-04-13
- 2026-08-25_08-10-18
- 2026-08-25_08-10-11
- 2026-08-24_08-04-42
- 2026-08-24_08-04-39
- 2026-08-23_08-04-24
- 2026-08-23_08-04-15
- 2026-08-22_08-04-36
- 2026-08-22_08-04-27
- 2026-08-21_08-00-24
- 2026-08-21_08-00-13
- 2026-08-20_08-03-40
- 2026-08-20_08-03-29
- 2026-08-19_08-02-49
- 2026-08-19_08-02-47
- 2026-08-18_07-59-36
- 2026-08-18_07-59-33
- 2026-08-17_07-59-07
- 2026-08-17_07-59-01
- 2026-08-16_07-55-47
- 2026-08-16_07-55-40
- 2026-08-15_07-57-18
- 2026-08-15_07-57-09
- 2026-08-14_07-56-58
- 2026-08-14_07-56-55
- 2026-08-13_07-56-59
- 2026-08-13_07-56-52
- 2026-08-11_07-56-00
- 2026-08-11_07-55-53
- 2026-08-10_07-52-48
- 2026-08-10_07-52-39
- 2026-08-08_07-52-02
- 2026-08-08_07-51-50
- 2026-08-07_07-50-21
- 2026-08-07_07-50-11
- 2026-08-06_07-51-20
- 2026-08-06_07-51-13
- 2026-08-04_07-52-47
- 2026-08-04_07-52-31
- 2026-08-03_07-50-35
- 2026-08-03_07-50-16
- 2026-08-01_07-50-49
- 2026-08-01_07-50-43
- 2026-07-31_07-49-19
- 2026-07-31_07-49-12
- 2026-07-27_07-45-32
- 2026-07-27_07-45-28
- 2026-07-24_07-44-36
- 2026-07-24_07-44-33
- 2026-07-23_07-43-36
- 2026-07-23_07-43-27
- 2026-07-22_07-45-23
- 2026-07-22_07-45-20
- 2026-07-21_07-42-30
- 2026-07-21_07-42-28
- 2026-07-20_07-42-50
- 2026-07-20_07-42-41
- 2026-07-19_07-42-35
- 2026-07-19_07-42-26
- 2026-07-17_07-42-01
- 2026-07-17_07-41-50
- 2026-07-16_07-28-52
- 2026-07-16_07-28-41
- 2026-07-15_07-28-04
- 2026-07-15_07-27-46
- 2026-07-14_07-27-21
- 2026-07-14_07-27-12
- 2026-07-13_07-27-50
- 2026-07-13_07-27-46
- 2026-07-11_07-27-25
- 2026-07-11_07-27-08
- 2026-07-10_07-27-01
- 2026-07-10_07-26-49
- 2026-07-08_07-26-49
- 2026-07-08_07-26-39
- 2026-07-07_07-26-01
- 2026-07-07_07-25-51
- 2026-07-06_07-26-41
- 2026-07-06_07-26-31
- 2026-07-05_07-24-06
- 2026-07-05_07-23-45
- 2026-07-04_07-25-22
- 2026-07-04_07-25-15
- 2026-07-03_07-25-02
- 2026-07-03_07-24-54
- 2026-07-02_07-24-13
- 2026-07-02_07-24-02
- 2026-07-01_07-38-32
- 2026-07-01_07-37-36
- 2026-06-30_09-49-00
- 2026-06-30_07-35-02
- 2026-06-30_07-34-07
- 2026-06-28_07-34-10
- 2026-06-27_09-32-18
- 2026-06-27_07-34-46
- 2026-06-27_07-34-09
- 2026-02-18_06-57-12
- 2024-11-23_03-30-31
- 2024-09-30_21-22-35
- 2024-07-04_15-01-35
- 2024-03-30_14-18-15
Check the differences between the versions.
Annotations
Events
Hand-picked events relevant to this call topic.
No events yet
There are currently no events linked to this call topic.
Timeline
Call published · 30 Sep 2024 (2 years ago)
All expected milestones for this call have passed.
Work programme published
07 Oct 2022 · est.
Call opens
12 Sep 2023
Call closes
16 Jan 2024
Outcome expected
16 Jun 2024 · est.
Grant agreement signed
16 Sep 2024 · est.
Call published
30 Sep 2024
-
Work programme published Estimated
07 Oct 2022 · 4 years ago
Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.
-
Call opens
12 Sep 2023 · 3 years ago
Submissions can be made from this date.
-
Call closes
16 Jan 2024 · 2 years ago
Deadline to submit a proposal.
-
Outcome expected Estimated
16 Jun 2024 · 2 years ago
The maximum time to inform applicants of the evaluation outcome is five months after the call closes.
-
Grant agreement signed Estimated
16 Sep 2024 · 2 years ago
The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.
-
Call published
30 Sep 2024 · 2 years ago
This topic was first published in TopicTree.
Funded Projects
Loading...
Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)
Ecosystem bubbles
This call topic is part of the following thematic bubbles.
Not part of a bubble yet
This call topic has not been grouped into an ecosystem bubble.